Difference between revisions of "SBS Protected Roof Assembly (typical)"

Jump to: navigation, search

Difference between revisions of "SBS Protected Roof Assembly (typical)"

(RELATED WORK BY OTHERS)
(WORK INCLUDED)
Line 20: Line 20:
 
<div class="col-md-6">
 
<div class="col-md-6">
 
=== WORK INCLUDED ===
 
=== WORK INCLUDED ===
;(1) [[RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies#SBSBASE|'''Base Sheet''']]:
+
;(1) [[RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies#SBSBASE|'''Base Field Membrane''']]:
 
:Adhered to deck using asphalt, cold adhesive, self-adhered, torch applied membrane or loose laid according to manufacturer's specification and to  the <i>RoofStar Guarantee Standards</i>.
 
:Adhered to deck using asphalt, cold adhesive, self-adhered, torch applied membrane or loose laid according to manufacturer's specification and to  the <i>RoofStar Guarantee Standards</i>.
;(2) [[RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies#SBS-STRIPPING|'''Base Sheet Flashing''']]: Adhered according to manufacturer's specifications using cold adhesive, self-adhered or torch applied to cover boards, or mechanically attached membrane. Torching directly to wood surfaces is not permitted. Must be carried over to outside of parapet or minimum 200 mm (8") above finished roof surface (see RoofStar Guarantee Standards for SBS Roofing Systems, [[RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies#SBS-STRIPPING|'''10.3''']]).
+
;(2) [[RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies#SBS-STRIPPING|'''Base Membrane Flashing''']]: Adhered according to manufacturer's specifications using cold adhesive, self-adhered or torch applied to cover boards, or mechanically attached membrane. Torching directly to wood surfaces is not permitted. Must be carried over to outside of parapet or minimum 200 mm (8") above finished roof surface (see RoofStar Guarantee Standards for SBS Roofing Systems, [[RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies#SBS-STRIPPING|'''10.3''']]).
;(3) [[RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies#SBSBASE|'''Cap Sheet''']]: Applied according to manufacturer&#8217;s printed instructions and <i>RoofStar Guarantee Standards</i>.
+
;(3) [[RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies#SBSBASE|'''Cap Field Membrane''']]: Applied according to manufacturer&#8217;s printed instructions and <i>RoofStar Guarantee Standards</i>.
;(4) [[RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies#SBS-STRIPPING|'''Cap Sheet Flashing''']]: Applied according to manufacturer&#8217;s printed instructions and <i>RoofStar Guarantee Standards</i> to top of parapet or minimum 200 mm (8") above top of finished roof surface.
+
;(4) [[RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies#SBS-STRIPPING|'''Cap Membrane Flashing''']]: Applied according to manufacturer&#8217;s printed instructions and <i>RoofStar Guarantee Standards</i> to top of parapet or minimum 200 mm (8") above top of finished roof surface.
 
;(5) [[RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies#SBSINSULATION|'''Insulation''']]: See available insulation products in the [[Roof Deck Insulation|'''Accepted Materials''']] section of this Manual.
 
;(5) [[RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies#SBSINSULATION|'''Insulation''']]: See available insulation products in the [[Roof Deck Insulation|'''Accepted Materials''']] section of this Manual.
 
;(6) [[RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies#SBSFILTER|'''Filter Fabric''']]: Metal base flashing required.  See [[RoofStar Guarantee Standards for SBS Roof Systems#SBSMETAL|'''Section 12''']].
 
;(6) [[RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies#SBSFILTER|'''Filter Fabric''']]: Metal base flashing required.  See [[RoofStar Guarantee Standards for SBS Roof Systems#SBSMETAL|'''Section 12''']].

Revision as of 18:22, 29 January 2019

RoofStar Guarantee Standards are blue-linked
SBS Details

D1.7.2.jpg


Click below for a printable version of this page.
Print Sheet

1 WORK INCLUDED

(1) Base Field Membrane
Adhered to deck using asphalt, cold adhesive, self-adhered, torch applied membrane or loose laid according to manufacturer's specification and to the RoofStar Guarantee Standards.
(2) Base Membrane Flashing
Adhered according to manufacturer's specifications using cold adhesive, self-adhered or torch applied to cover boards, or mechanically attached membrane. Torching directly to wood surfaces is not permitted. Must be carried over to outside of parapet or minimum 200 mm (8") above finished roof surface (see RoofStar Guarantee Standards for SBS Roofing Systems, 10.3).
(3) Cap Field Membrane
Applied according to manufacturer’s printed instructions and RoofStar Guarantee Standards.
(4) Cap Membrane Flashing
Applied according to manufacturer’s printed instructions and RoofStar Guarantee Standards to top of parapet or minimum 200 mm (8") above top of finished roof surface.
(5) Insulation
See available insulation products in the Accepted Materials section of this Manual.
(6) Filter Fabric
Metal base flashing required. See Section 12.
(7) Ballast
Gravel or concrete paving tiles.
(8) Metal Flashing
As required by RoofStar Guarantee Standards.
(9) Fire-stop Tape.

2 RELATED WORK BY OTHERS

(A) Acceptable Supporting Deck Structure
Smooth, dry and clean concrete, coated with proprietary primer.
(B) Plywood Backing
Required on rough concrete or where stripping adhesion is asphalt. Must be primed.
(C) Sloped Wood Blocking
Sloped to roof where parapet is over 100 mm (4") in width.

NOTE: Refer to RoofStar Guarantee Standards for additional requirements.




Back to RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies

Back to SBS Modified Bitumen Construction Details

Back to Construction Details