<div class="col-md-6"> | <div class="col-md-6"> | ||
=== WORK INCLUDED === | === WORK INCLUDED === | ||
− | ;(1) [[RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies# | + | ;(1) [[RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies#SBSAIRVAPOUR|'''Air or Vapour Control Layers''']]: The requirement for a vapour retarder is determined by the design authority. Optional terminations. |
;(2) [[RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies#SBSINSULATION|'''Insulation''']] | ;(2) [[RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies#SBSINSULATION|'''Insulation''']] | ||
;(3) [[RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies#SBSINSULATIONOVERLAY|'''Insulation Overlay''']]: Where required. | ;(3) [[RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies#SBSINSULATIONOVERLAY|'''Insulation Overlay''']]: Where required. | ||
− | ;(4) [[RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies#SBSBASE|'''Primary Membrane and Membrane Protection''']] | + | ;(4) [[RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies#SBSBASE|'''Primary Membrane''']] and [[RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies#SBSPROTECTION| '''Membrane Protection''']] |
;(5) [[RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies#SBSSTRIPTERM|'''Membrane Flashing''']]: Mechanically fasten to top of wood blocking. | ;(5) [[RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies#SBSSTRIPTERM|'''Membrane Flashing''']]: Mechanically fasten to top of wood blocking. | ||
;(6) [[RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies#METALCAP-SBS|'''Membrane Counter-flashing''']]: Flashing sealed to wall with compatible mastic. | ;(6) [[RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies#METALCAP-SBS|'''Membrane Counter-flashing''']]: Flashing sealed to wall with compatible mastic. | ||
Line 36: | Line 36: | ||
=== RELATED WORK BY OTHERS === | === RELATED WORK BY OTHERS === | ||
− | ;(A) [[RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies#SBSDECKS|'''Acceptable Deck''']] | + | ;(A) [[RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies#SBSDECKS|'''Acceptable Supporting Deck Structure''']] |
− | ;(B) [[RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies# | + | ;(B) [[RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies#SBSAIRVAPOUR|'''Air and Vapour Control Layer Seal''']]: Sealed to wall. |
;(C) [[RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies#SBSWOODBLOCKING|'''Wood Blocking''']]: Height to provide minimum 200 mm (8") above completed roof system, slope top edge. | ;(C) [[RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies#SBSWOODBLOCKING|'''Wood Blocking''']]: Height to provide minimum 200 mm (8") above completed roof system, slope top edge. | ||
;(D) <b>Flexible Insulation</b> | ;(D) <b>Flexible Insulation</b> | ||
− | ;(E) [[RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies# | + | ;(E) [[RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies#SBSSTRIPTERM|'''Reglet''']]: |
;(F) [[RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies#SBSSLOPEDWOODBLOCKING|'''Sloped Wood Blocking''']]: | ;(F) [[RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies#SBSSLOPEDWOODBLOCKING|'''Sloped Wood Blocking''']]: | ||
</div><!-- COL-6-MD --> | </div><!-- COL-6-MD --> |
Revision as of 18:46, 29 January 2019
RoofStar Guarantee Standards are blue-linked |
SBS Details
1 WORK INCLUDED
- (1) Air or Vapour Control Layers
- The requirement for a vapour retarder is determined by the design authority. Optional terminations.
- (2) Insulation
- (3) Insulation Overlay
- Where required.
- (4) Primary Membrane and Membrane Protection
- (5) Membrane Flashing
- Mechanically fasten to top of wood blocking.
- (6) Membrane Counter-flashing
- Flashing sealed to wall with compatible mastic.
- (7) Metal Base Flashing
- Mechanically fasten to top of wood blocking (C). Optional on flexible membrane systems. Required on assemblies using gravel ballast filter mats.
- (8) Metal Counter-flashing
- Into reglet approximately 30 mm (1¼") and caulked.
- (9) Caulking
- (10) Membrane Underlay
- Minimum self-adhered modified bitumen membrane.
- (11) Metal Cap Flashing
- Must overlap exterior wall finish. Fasten with continuous concealed clip-type fasteners or cladding screws evenly spaced between seams.
2 RELATED WORK BY OTHERS
- (A) Acceptable Supporting Deck Structure
- (B) Air and Vapour Control Layer Seal
- Sealed to wall.
- (C) Wood Blocking
- Height to provide minimum 200 mm (8") above completed roof system, slope top edge.
- (D) Flexible Insulation
- (E) Reglet
- (F) Sloped Wood Blocking
NOTE: Refer to RoofStar Guarantee Standards for additional requirements.