Difference between revisions of "SBS Sealant Pocket"
Difference between revisions of "SBS Sealant Pocket"
(→WORK INCLUDED) |
|||
Line 19: | Line 19: | ||
;(5) [[RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies#SBSBASE|'''Primary Membrane''']] and [[RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies#SBSPROTECTION| '''Membrane Protection''']] | ;(5) [[RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies#SBSBASE|'''Primary Membrane''']] and [[RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies#SBSPROTECTION| '''Membrane Protection''']] | ||
;(6) '''Compatible Mastic''': Use only the membrane manufacturer's approved sealant. | ;(6) '''Compatible Mastic''': Use only the membrane manufacturer's approved sealant. | ||
− | ;(7) [[RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies#SBSGUM|''' | + | ;(7) [[RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies#SBSGUM|'''Sealant Pocket''']]: Minimum 100 mm (4") flange onto roof membrane. All corners, with the exception of one job-site formed double standing seam corner joint and adjoining lapped flange joining, shall be closed and soldered. Minimum height of gum pan to be 100 mm (4"). |
;(8) [[RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies#SBS-STRIPPING|'''Membrane Flashing''']]: Onto primed metal flashing flange. | ;(8) [[RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies#SBS-STRIPPING|'''Membrane Flashing''']]: Onto primed metal flashing flange. | ||
;(9) '''Packing''': To prevent displacement of compatible mastic. | ;(9) '''Packing''': To prevent displacement of compatible mastic. |
Revision as of 18:59, 30 January 2019
RoofStar Guarantee Standards are blue-linked |
SBS Details
1 WORK INCLUDED
- (1) Supporting Deck Overlay
- If required by design authority.
- (2) Air or Vapour Control Layers
- If required by design authority
- (3) Insulation
- Mechanically fastened. See available insulation products in the Accepted Materials section of this Manual.
- (4) Insulation Overlay
- As required.
- (5) Primary Membrane and Membrane Protection
- (6) Compatible Mastic
- Use only the membrane manufacturer's approved sealant.
- (7) Sealant Pocket
- Minimum 100 mm (4") flange onto roof membrane. All corners, with the exception of one job-site formed double standing seam corner joint and adjoining lapped flange joining, shall be closed and soldered. Minimum height of gum pan to be 100 mm (4").
- (8) Membrane Flashing
- Onto primed metal flashing flange.
- (9) Packing
- To prevent displacement of compatible mastic.
- (10) Structural Sealant
- Use only the membrane manufacturers’ approved proprietary polyurethane based structural sealant.
- (11) Back-up Storm Collar
- To be installed whenever practical. Caulk at top of collar.
2 RELATED WORK BY OTHERS
- (A) Acceptable Supporting Deck Structure
- (B) Protrusion
- (C) Wood Blocking]]
NOTE: Refer to RoofStar Guarantee Standards for additional requirements.
- WARNING: DO NOT USE THIS DETAIL WITH HOT PIPES.
- AVOID THIS DETAIL: Wherever possible use Flanged Metal Stack Flashing or Curbed Opening (See Section 10.3).
Back to RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies