Difference between revisions of "Requesting and Specifying a RoofStar Guarantee"

Jump to: navigation, search

Difference between revisions of "Requesting and Specifying a RoofStar Guarantee"

Line 1: Line 1:
 +
<div class="row">
 +
 +
  <div class="col-md-3" style="float:right;" id="tocDiv">
 +
      __TOC__
 +
  </div> <!-- tocDiv -->
 +
 
Specifying authorities requesting the '''''RoofStar Guarantee''''' may insert the following wording into their specifications:
 
Specifying authorities requesting the '''''RoofStar Guarantee''''' may insert the following wording into their specifications:
  
<big><big><big>'''Quality Assurance'''</big></big></big>
+
==Quality Assurance==
  
 
#Workmanship standards conform to the latest '''''RoofStar Guarantee Standards''''' as published in the '''RoofStar Roofing Practices Manual''' for a '''''RoofStar Guarantee''''', unless modified by the contract documents to exceed these minimums.
 
#Workmanship standards conform to the latest '''''RoofStar Guarantee Standards''''' as published in the '''RoofStar Roofing Practices Manual''' for a '''''RoofStar Guarantee''''', unless modified by the contract documents to exceed these minimums.
Line 13: Line 19:
 
#Observation costs are included in this contract
 
#Observation costs are included in this contract
  
 
+
==Guarantee==
<big><big><big>'''Guarantee'''</big></big></big>
 
  
 
#Provide the '''''RoofStar Guarantee''''' for five, ten or fifteen* years.
 
#Provide the '''''RoofStar Guarantee''''' for five, ten or fifteen* years.
Line 24: Line 29:
  
 
[[Main Page|Home]]
 
[[Main Page|Home]]
 +
</div><!-- mainBodyDiv -->
 +
</div><!-- row -->

Revision as of 17:04, 3 July 2019

Specifying authorities requesting the RoofStar Guarantee may insert the following wording into their specifications:

1 Quality Assurance

  1. Workmanship standards conform to the latest RoofStar Guarantee Standards as published in the RoofStar Roofing Practices Manual for a RoofStar Guarantee, unless modified by the contract documents to exceed these minimums.
  2. Independent Observations (preferred wording)
    1. Performed using an independent observation company acceptable to the RoofStar Guarantee Program, the Owner and the consultant.
    2. Performed as required by the RoofStar Guarantee Program.
    3. Observation costs are to be paid directly by the Owner
  3. Independent Observation (optional wording)
    1. Performed using an independent observation company acceptable to the RoofStar Guarantee Program, the owner and the consultant, to be assigned by the RoofStar Guarantee Program.
    2. Performed as required by the RoofStar Guarantee Program.
  4. Observation costs are included in this contract

2 Guarantee

  1. Provide the RoofStar Guarantee for five, ten or fifteen* years.


* the 15-year RoofStar Guarantee is currently under development

Home