Difference between revisions of "Drafting - Division A, C"

Jump to: navigation, search

Difference between revisions of "Drafting - Division A, C"

Line 1: Line 1:
 +
__NOTOC__
 
<big>This page is used for drafting new or revised wordings, before publishing</big>
 
<big>This page is used for drafting new or revised wordings, before publishing</big>
  
<tabs>
+
<big><big>Construction Details (holding pen)</big></big>
<tab name="Base Membranes">
+
<div class="col-md-4">
{{Template:MARS Membrane - SBS 2-Ply Base}}
+
<hr>
</tab>
+
 
<tab name="Cap Membranes">
+
===EPDM===
{{Template:MARS Membrane - SBS 2-Ply Cap}}
+
<big>10 PERIMETERS and WALLS</big>
</tab>
+
:[[EPDM Details:D2.7.5-1 Roof-Wall Transitions (Expansion Joint)|D2.7.5-1 Roof-Wall Transitions (Expansion Joint)'''(Under Construction)''']]
<tab name="Single-ply Membranes">
+
:[[EPDM Details:D2.7.5-2 Roof-Wall Transitions (Divider/Joint)|D2.7.5-2 Roof-Wall Transitions (Divider/Joint)'''(Under Construction)''']]
{{Template:MARS Membrane - SBS Single-ply}}
+
:[[EPDM Details:D2.7.5-3 Roof-Wall Transitions (Fire Separation Joint)|D2.7.5-3 Roof-Wall Transitions (Fire Separation Joint)'''(Under Construction)''']]
</tab>
+
:[[EPDM Details:D2.7.5-4 Roof-Wall Transitions (Fire Separation Wall)|D2.7.5-4 Roof-Wall Transitions (Fire Separation Wall)'''(Under Construction)''']]
</tabs>
+
:[[EPDM Details:D2.7.2-1 Parapets & Copings (High - Wall Supported)|D2.7.2-1 Parapets & Copings (High - Wall Supported)'''(Under Construction)''']]
 +
:[[EPDM Details:D2.7.2-2 Parapets & Copings (Parapet - Wall Transition)|D2.7.2-2 Parapets & Copings (Parapet - Wall Transition)'''(Under Construction)''']]
 +
 
 +
:[[EPDM Details:D2.7.3-1 Edges & Fascia (Cant Edge)|D2.7.3-1 Edges & Fascia (Cant Edge)'''(Under Construction)''']]
 +
:[[EPDM Details:D2.7.3-2 Edges & Fascia (Gravel Stop)|D2.7.3-2 Edges & Fascia (Gravel Stop)'''(Under Construction)''']]
 +
:[[EPDM Details:D2.7.4-1 Counter-flashings & Reglets (Deck - Wall Supported)|D2.7.4-1 Counter-flashings & Reglets (Deck - Wall Supported)'''(Under Construction)''']]
 +
:[[EPDM Details:D2.7.4-2 Counter-flashings & Reglets (Deck - Unsupported by Wall)|D2.7.4-2 Counter-flashings & Reglets (Deck - Unsupported by Wall)'''(Under Construction)''']]
 +
:[[EPDM Details:D2.7.4-3 Counter-flashings & Reglets (Stucco Wall: Re-roofing)|D2.7.4-3 Counter-flashings & Reglets (Stucco Wall: Re-roofing)'''(Under Construction)''']]
 +
:[[EPDM Details:D2.7.4-4 Counter-flashings & Reglets (Stucco Wall: New)|D2.7.4-4 Counter-flashings & Reglets (Stucco Wall: New)'''(Under Construction)''']]
 +
:[[EPDM Details:D2.7.4-5 Counter-flashings & Reglets (Double Surface Reglet)|D2.7.4-5 Counter-flashings & Reglets (Double Surface Reglet)'''(Under Construction)''']]
 +
:[[EPDM Details:D2.7.4-6 Counter-flashings & Reglets (Low Door Sill)|D2.7.4-6 Counter-flashings & Reglets (Low Door Sill)'''(Under Construction)''']]
 +
:[[EPDM Details:D2.7.4-7 Counter-flashings & Reglets (Window Curb)|D2.7.4-7 Counter-flashings & Reglets (Window Curb)'''(Under Construction)''']]
 +
 
 +
<big>11 PERIMETERS and DRAINS</big>
 +
:[[EPDM Details:D2.7.6-1 Curbs & Sleepers (Equipment Sleeper)|D2.7.6-1 Curbs & Sleepers (Equipment Sleeper)'''(Under Construction)''']]
 +
:[[EPDM Details:D2.7.6-2 Curbs & Sleepers (Multiple Roof Penetrations)|D2.7.6-2 Curbs & Sleepers (Multiple Roof Penetrations)'''(Under Construction)''']]
 +
:[[EPDM Details:D2.7.6-3 Curbs & Sleepers (Basic Curb)|D2.7.6-3 Curbs & Sleepers (Basic Curb)]]
 +
:[[EPDM Details:D2.7.6-4 Curbs & Sleepers (Mechanical Opening)|D2.7.6-4 Curbs & Sleepers (Mechanical Opening)]]
 +
 
 +
:[[EPDM Details:D2.7.7-1 Strip-in Flashings (Metal Plumbing)|D2.7.7-1 Strip-in Flashings (Metal Plumbing)'''(Under Construction)''']]
 +
:[[EPDM Details:D2.7.7-2 Strip-in Flashings (Two-part Cable)|D2.7.7-2 Strip-in Flashings (Two-part Cable)]]
 +
:[[EPDM Details:D2.7.7-3 Strip-in Flashings (Pourable Sealer Pocket)|D2.7.7-3 Strip-in Flashings (Pourable Sealer  Pocket)'''(Under Construction)''']]
 +
:[[EPDM Details:D2.7.8-1 Water & Drainage (Cast Iron Drain)|D2.7.8-1 Water & Drainage (Cast Iron Drain)'''(Under Construction)''']]
 +
:[[EPDM Details:D2.7.8-2 Water & Drainage (Spun Copper Drain)|D2.7.8-2 Water & Drainage (Spun Copper Drain)'''(Under Construction)''']]
 +
:[[EPDM Details:D2.7.8-3 Water & Drainage (Clamping Spun Copper Drain)|D2.7.8-3 Water & Drainage (Clamping Spun Copper Drain)]]
 +
:[[EPDM Details:D2.7.8-4 Water & Drainage (Open Wall Scupper)|D2.7.8-4 Water & Drainage (Open Wall Scupper)'''(Under Construction)''']]
 +
:[[EPDM Details:D2.7.8-5 Water & Drainage (Through-wall Scupper)|D2.7.8-5 Water & Drainage (Through-wall Scupper)'''(Under Construction)''']]
 +
 
 +
:[[EPDM Details:D2.7.9-1 Miscellaneous Penetrations (Roof Anchor)|D2.7.9-1 Miscellaneous Penetrations (Roof Anchor)'''(Under Construction)''']]
 +
:[[EPDM Details:D2.7.9-2 Miscellaneous Penetrations (Wall Anchor - Conventional Roof Assy)|D2.7.9-2 Miscellaneous Penetrations (Wall Anchor - Conventional Roof Assy)'''(Under Construction)''']]
 +
:[[EPDM Details:D2.7.9-3 Miscellaneous Penetrations (Wall Anchor - Protected Roof Assy)|D2.7.9-3 Miscellaneous Penetrations (Wall Anchor - Protected Roof Assy)'''(Under Construction)''']]
 +
 
 +
</div>
 +
 
 +
<div class="col-md-4">
 +
<hr>
 +
 
 +
===TPO===
 +
<big>10 PERIMETERS and WALLS</big>
 +
:[[TPO Details:D3.7.5-1 Roof-Wall Transitions (Expansion Joint)|D3.7.5-1 Roof-Wall Transitions (Expansion Joint)'''(Under Construction''')]]
 +
:[[TPO Details:D3.7.5-2 Roof-Wall Transitions (Divider/Joint)|D3.7.5-2 Roof-Wall Transitions (Divider/Joint)'''(Under Construction)''']]
 +
:[[TPO Details:D3.7.5-3 Roof-Wall Transitions (Fire Separation Joint)|D3.7.5-3 Roof-Wall Transitions (Fire Separation Joint)'''(Under Construction)''']]
 +
:[[TPO Details:D3.7.5-4 Roof-Wall Transitions (Fire Separation Wall)|D3.7.5-4 Roof-Wall Transitions (Fire Separation Wall)'''(Under Construction)''']]
 +
:[[TPO Details:D3.7.2-1 Parapets & Copings (High - Wall Supported)|D3.7.2-1 Parapets & Copings (High - Wall Supported)'''(Under Construction)''']]
 +
:[[TPO Details:D3.7.2-2 Parapets & Copings (Parapet - Wall Transition)|D3.7.2-2 Parapets & Copings (Parapet - Wall Transition)'''(Under Construction)''']]
 +
:[[TPO Details:D3.7.3-1 Edges & Fascia (Cant Edge)|D3.7.3-1 Edges & Fascia (Cant Edge)'''(Under Construction)''']]
 +
:[[TPO Details:D3.7.3-2 Edges & Fascia (Gravel Stop)|D3.7.3-2 Edges & Fascia (Gravel Stop)'''(Under Construction)''']]
 +
:[[TPO Details:D3.7.3-3 Edges & Fascia (Roof Edge)|D3.7.3-3 Edges & Fascia (Roof Edge)]]
 +
 
 +
:[[TPO Details:D3.7.4-1 Counter-flashings & Reglets (Deck - Wall Supported)|D3.7.4-1 Counter-flashings & Reglets (Deck - Wall Supported)'''(Under Construction''')]]
 +
:[[TPO Details:D3.7.4-2 Counter-flashings & Reglets (Deck - Unsupported by Wall)|D3.7.4-2 Counter-flashings & Reglets (Deck - Unsupported by Wall)'''(Under Construction)''']]
 +
:[[TPO Details:D3.7.4-3 Counter-flashings & Reglets (Stucco Wall: Re-roofing)|D3.7.4-3 Counter-flashings & Reglets (Stucco Wall: Re-roofing)'''(Under Construction)''']]
 +
:[[TPO Details:D3.7.4-4 Counter-flashings & Reglets (Stucco Wall: New)|D3.7.4-4 Counter-flashings & Reglets (Stucco Wall: New)'''(Under Construction''')]]
 +
:[[TPO Details:D3.7.4-5 Counter-flashings & Reglets (Double Surface Reglet)|D3.7.4-5 Counter-flashings & Reglets (Double Surface Reglet)'''(Under Construction)''']]
 +
:[[TPO Details:D3.7.4-6 Counter-flashings & Reglets (Low Door Sill)|D3.7.4-6 Counter-flashings & Reglets (Low Door Sill)'''(Under Construction)''']]
 +
:[[TPO Details:D3.7.4-7 Counter-flashings & Reglets (Window Curb)|D3.7.4-7 Counter-flashings & Reglets (Window Curb)'''(Under Construction''')]]
 +
 
 +
<big>11 PERIMETERS and DRAINS</big>
 +
:[[TPO Details:D3.7.6-1 Curbs & Sleepers (Equipment Sleeper)|D3.7.6-1 Curbs & Sleepers (Equipment Sleeper)'''(Under Construction)''']]
 +
:[[TPO Details:D3.7.6-2 Curbs & Sleepers (Multiple Roof Penetrations)|D3.7.6-2 Curbs & Sleepers (Multiple Roof Penetrations)'''(Under Construction''')]]
 +
:[[TPO Details:D3.7.6-3 Curbs & Sleepers (Basic Curb)|D3.7.6-3 Curbs & Sleepers (Basic Curb)]]
 +
:[[TPO Details:D3.7.6-4 Curbs & Sleepers (Mechanical Opening)|D3.7.6-4 Curbs & Sleepers (Mechanical Opening)]]
 +
 
 +
:[[TPO Details:D3.7.7-1 Strip-in Flashings (Metal Plumbing)|D3.7.7-1 Strip-in Flashings (Metal Plumbing)'''(Under Construction)''']]
 +
:[[TPO Details:D3.7.7-2 Strip-in Flashings (Two-part Cable)|D3.7.7-2 Strip-in Flashings (Two-part Cable)]]
 +
:[[TPO Details:D3.7.7-3 Strip-in Flashings (Pourable Sealer Pocket)|D3.7.7-3 Strip-in Flashings (Pourable Sealer  Pocket)'''(Under Construction)''']]
 +
 
 +
:[[TPO Details:D3.7.8-1 Water & Drainage (Cast Iron Drain)|D3.7.8-1 Water & Drainage (Cast Iron Drain)'''(Under Construction)''']]
 +
:[[TPO Details:D3.7.8-2 Water & Drainage (Spun Copper Drain)|D3.7.8-2 Water & Drainage (Spun Copper Drain)'''(Under Construction)''']]
 +
:[[TPO Details:D3.7.8-3 Water & Drainage (Clamping Spun Copper Drain)|D3.7.8-3 Water & Drainage (Clamping Spun Copper Drain)]]
 +
:[[TPO Details:D3.7.8-4 Water & Drainage (Open Wall Scupper)|D3.7.8-4 Water & Drainage (Open Wall Scupper)'''(Under Construction)''']]
 +
:[[TPO Details:D3.7.8-5 Water & Drainage (Through-wall Scupper)|D3.7.8-5 Water & Drainage (Through-wall Scupper)'''(Under Construction)''']]
 +
 
 +
:[[TPO Details:D3.7.9-1 Miscellaneous Penetrations (Roof Anchor)|D3.7.9-1 Miscellaneous Penetrations (Roof Anchor)'''(Under Construction)''']]
 +
:[[TPO Details:D3.7.9-2 Miscellaneous Penetrations (Wall Anchor - Conventional Roof Assy)|D3.7.9-2 Miscellaneous Penetrations (Wall Anchor - Conventional Roof Assy)'''(Under Construction)''']]
 +
:[[TPO Details:D2.7.9-3 Miscellaneous Penetrations (Wall Anchor - Protected Roof Assy)|D3.7.9-3 Miscellaneous Penetrations (Wall Anchor - Protected Roof Assy)'''(Under Construction)''']]
 +
 
 +
</div>
 +
 
 +
<div class="col-md-4">
 +
<hr>
 +
 
 +
===PVC===
 +
<big>10 PERIMETERS and WALLS</big>
 +
:[[TPO Details:D3.7.5-1 Roof-Wall Transitions (Expansion Joint)|D3.7.5-1 Roof-Wall Transitions (Expansion Joint)'''(Under Construction''')]]
 +
:[[TPO Details:D3.7.5-2 Roof-Wall Transitions (Divider/Joint)|D3.7.5-2 Roof-Wall Transitions (Divider/Joint)'''(Under Construction)''']]
 +
:[[TPO Details:D3.7.5-3 Roof-Wall Transitions (Fire Separation Joint)|D3.7.5-3 Roof-Wall Transitions (Fire Separation Joint)'''(Under Construction)''']]
 +
:[[TPO Details:D3.7.5-4 Roof-Wall Transitions (Fire Separation Wall)|D3.7.5-4 Roof-Wall Transitions (Fire Separation Wall)'''(Under Construction)''']]
 +
:[[TPO Details:D3.7.2-1 Parapets & Copings (High - Wall Supported)|D3.7.2-1 Parapets & Copings (High - Wall Supported)'''(Under Construction)''']]
 +
:[[TPO Details:D3.7.2-2 Parapets & Copings (Parapet - Wall Transition)|D3.7.2-2 Parapets & Copings (Parapet - Wall Transition)'''(Under Construction)''']]
 +
:[[TPO Details:D3.7.3-1 Edges & Fascia (Cant Edge)|D3.7.3-1 Edges & Fascia (Cant Edge)'''(Under Construction)''']]
 +
:[[TPO Details:D3.7.3-2 Edges & Fascia (Gravel Stop)|D3.7.3-2 Edges & Fascia (Gravel Stop)'''(Under Construction)''']]
 +
:[[TPO Details:D3.7.3-3 Edges & Fascia (Roof Edge)|D3.7.3-3 Edges & Fascia (Roof Edge)]]
 +
 
 +
:[[TPO Details:D3.7.4-1 Counter-flashings & Reglets (Deck - Wall Supported)|D3.7.4-1 Counter-flashings & Reglets (Deck - Wall Supported)'''(Under Construction''')]]
 +
:[[TPO Details:D3.7.4-2 Counter-flashings & Reglets (Deck - Unsupported by Wall)|D3.7.4-2 Counter-flashings & Reglets (Deck - Unsupported by Wall)'''(Under Construction)''']]
 +
:[[TPO Details:D3.7.4-3 Counter-flashings & Reglets (Stucco Wall: Re-roofing)|D3.7.4-3 Counter-flashings & Reglets (Stucco Wall: Re-roofing)'''(Under Construction)''']]
 +
:[[TPO Details:D3.7.4-4 Counter-flashings & Reglets (Stucco Wall: New)|D3.7.4-4 Counter-flashings & Reglets (Stucco Wall: New)'''(Under Construction''')]]
 +
:[[TPO Details:D3.7.4-5 Counter-flashings & Reglets (Double Surface Reglet)|D3.7.4-5 Counter-flashings & Reglets (Double Surface Reglet)'''(Under Construction)''']]
 +
:[[TPO Details:D3.7.4-6 Counter-flashings & Reglets (Low Door Sill)|D3.7.4-6 Counter-flashings & Reglets (Low Door Sill)'''(Under Construction)''']]
 +
:[[TPO Details:D3.7.4-7 Counter-flashings & Reglets (Window Curb)|D3.7.4-7 Counter-flashings & Reglets (Window Curb)'''(Under Construction''')]]
 +
 
 +
<big>11 PERIMETERS and DRAINS</big>
 +
:[[TPO Details:D3.7.6-1 Curbs & Sleepers (Equipment Sleeper)|D3.7.6-1 Curbs & Sleepers (Equipment Sleeper)'''(Under Construction)''']]
 +
:[[TPO Details:D3.7.6-2 Curbs & Sleepers (Multiple Roof Penetrations)|D3.7.6-2 Curbs & Sleepers (Multiple Roof Penetrations)'''(Under Construction''')]]
 +
:[[TPO Details:D3.7.6-3 Curbs & Sleepers (Basic Curb)|D3.7.6-3 Curbs & Sleepers (Basic Curb)]]
 +
:[[TPO Details:D3.7.6-4 Curbs & Sleepers (Mechanical Opening)|D3.7.6-4 Curbs & Sleepers (Mechanical Opening)]]
 +
 
 +
:[[TPO Details:D3.7.7-1 Strip-in Flashings (Metal Plumbing)|D3.7.7-1 Strip-in Flashings (Metal Plumbing)'''(Under Construction)''']]
 +
:[[TPO Details:D3.7.7-2 Strip-in Flashings (Two-part Cable)|D3.7.7-2 Strip-in Flashings (Two-part Cable)]]
 +
:[[TPO Details:D3.7.7-3 Strip-in Flashings (Pourable Sealer Pocket)|D3.7.7-3 Strip-in Flashings (Pourable Sealer  Pocket)'''(Under Construction)''']]
 +
 
 +
:[[TPO Details:D3.7.8-1 Water & Drainage (Cast Iron Drain)|D3.7.8-1 Water & Drainage (Cast Iron Drain)'''(Under Construction)''']]
 +
:[[TPO Details:D3.7.8-2 Water & Drainage (Spun Copper Drain)|D3.7.8-2 Water & Drainage (Spun Copper Drain)'''(Under Construction)''']]
 +
:[[TPO Details:D3.7.8-3 Water & Drainage (Clamping Spun Copper Drain)|D3.7.8-3 Water & Drainage (Clamping Spun Copper Drain)]]
 +
:[[TPO Details:D3.7.8-4 Water & Drainage (Open Wall Scupper)|D3.7.8-4 Water & Drainage (Open Wall Scupper)'''(Under Construction)''']]
 +
:[[TPO Details:D3.7.8-5 Water & Drainage (Through-wall Scupper)|D3.7.8-5 Water & Drainage (Through-wall Scupper)'''(Under Construction)''']]
 +
 
 +
:[[TPO Details:D3.7.9-1 Miscellaneous Penetrations (Roof Anchor)|D3.7.9-1 Miscellaneous Penetrations (Roof Anchor)'''(Under Construction)''']]
 +
:[[TPO Details:D3.7.9-2 Miscellaneous Penetrations (Wall Anchor - Conventional Roof Assy)|D3.7.9-2 Miscellaneous Penetrations (Wall Anchor - Conventional Roof Assy)'''(Under Construction)''']]
 +
:[[TPO Details:D2.7.9-3 Miscellaneous Penetrations (Wall Anchor - Protected Roof Assy)|D3.7.9-3 Miscellaneous Penetrations (Wall Anchor - Protected Roof Assy)'''(Under Construction)''']]
 +
 
 +
</div>
 +
 
 +
<div class="col-md-12">
 +
<hr>
 +
</div>

Revision as of 15:29, 14 November 2019

This page is used for drafting new or revised wordings, before publishing

Construction Details (holding pen)


1 EPDM

10 PERIMETERS and WALLS

D2.7.5-1 Roof-Wall Transitions (Expansion Joint)(Under Construction)
D2.7.5-2 Roof-Wall Transitions (Divider/Joint)(Under Construction)
D2.7.5-3 Roof-Wall Transitions (Fire Separation Joint)(Under Construction)
D2.7.5-4 Roof-Wall Transitions (Fire Separation Wall)(Under Construction)
D2.7.2-1 Parapets & Copings (High - Wall Supported)(Under Construction)
D2.7.2-2 Parapets & Copings (Parapet - Wall Transition)(Under Construction)
D2.7.3-1 Edges & Fascia (Cant Edge)(Under Construction)
D2.7.3-2 Edges & Fascia (Gravel Stop)(Under Construction)
D2.7.4-1 Counter-flashings & Reglets (Deck - Wall Supported)(Under Construction)
D2.7.4-2 Counter-flashings & Reglets (Deck - Unsupported by Wall)(Under Construction)
D2.7.4-3 Counter-flashings & Reglets (Stucco Wall: Re-roofing)(Under Construction)
D2.7.4-4 Counter-flashings & Reglets (Stucco Wall: New)(Under Construction)
D2.7.4-5 Counter-flashings & Reglets (Double Surface Reglet)(Under Construction)
D2.7.4-6 Counter-flashings & Reglets (Low Door Sill)(Under Construction)
D2.7.4-7 Counter-flashings & Reglets (Window Curb)(Under Construction)

11 PERIMETERS and DRAINS

D2.7.6-1 Curbs & Sleepers (Equipment Sleeper)(Under Construction)
D2.7.6-2 Curbs & Sleepers (Multiple Roof Penetrations)(Under Construction)
D2.7.6-3 Curbs & Sleepers (Basic Curb)
D2.7.6-4 Curbs & Sleepers (Mechanical Opening)
D2.7.7-1 Strip-in Flashings (Metal Plumbing)(Under Construction)
D2.7.7-2 Strip-in Flashings (Two-part Cable)
D2.7.7-3 Strip-in Flashings (Pourable Sealer Pocket)(Under Construction)
D2.7.8-1 Water & Drainage (Cast Iron Drain)(Under Construction)
D2.7.8-2 Water & Drainage (Spun Copper Drain)(Under Construction)
D2.7.8-3 Water & Drainage (Clamping Spun Copper Drain)
D2.7.8-4 Water & Drainage (Open Wall Scupper)(Under Construction)
D2.7.8-5 Water & Drainage (Through-wall Scupper)(Under Construction)
D2.7.9-1 Miscellaneous Penetrations (Roof Anchor)(Under Construction)
D2.7.9-2 Miscellaneous Penetrations (Wall Anchor - Conventional Roof Assy)(Under Construction)
D2.7.9-3 Miscellaneous Penetrations (Wall Anchor - Protected Roof Assy)(Under Construction)

2 TPO

10 PERIMETERS and WALLS

D3.7.5-1 Roof-Wall Transitions (Expansion Joint)(Under Construction)
D3.7.5-2 Roof-Wall Transitions (Divider/Joint)(Under Construction)
D3.7.5-3 Roof-Wall Transitions (Fire Separation Joint)(Under Construction)
D3.7.5-4 Roof-Wall Transitions (Fire Separation Wall)(Under Construction)
D3.7.2-1 Parapets & Copings (High - Wall Supported)(Under Construction)
D3.7.2-2 Parapets & Copings (Parapet - Wall Transition)(Under Construction)
D3.7.3-1 Edges & Fascia (Cant Edge)(Under Construction)
D3.7.3-2 Edges & Fascia (Gravel Stop)(Under Construction)
D3.7.3-3 Edges & Fascia (Roof Edge)
D3.7.4-1 Counter-flashings & Reglets (Deck - Wall Supported)(Under Construction)
D3.7.4-2 Counter-flashings & Reglets (Deck - Unsupported by Wall)(Under Construction)
D3.7.4-3 Counter-flashings & Reglets (Stucco Wall: Re-roofing)(Under Construction)
D3.7.4-4 Counter-flashings & Reglets (Stucco Wall: New)(Under Construction)
D3.7.4-5 Counter-flashings & Reglets (Double Surface Reglet)(Under Construction)
D3.7.4-6 Counter-flashings & Reglets (Low Door Sill)(Under Construction)
D3.7.4-7 Counter-flashings & Reglets (Window Curb)(Under Construction)

11 PERIMETERS and DRAINS

D3.7.6-1 Curbs & Sleepers (Equipment Sleeper)(Under Construction)
D3.7.6-2 Curbs & Sleepers (Multiple Roof Penetrations)(Under Construction)
D3.7.6-3 Curbs & Sleepers (Basic Curb)
D3.7.6-4 Curbs & Sleepers (Mechanical Opening)
D3.7.7-1 Strip-in Flashings (Metal Plumbing)(Under Construction)
D3.7.7-2 Strip-in Flashings (Two-part Cable)
D3.7.7-3 Strip-in Flashings (Pourable Sealer Pocket)(Under Construction)
D3.7.8-1 Water & Drainage (Cast Iron Drain)(Under Construction)
D3.7.8-2 Water & Drainage (Spun Copper Drain)(Under Construction)
D3.7.8-3 Water & Drainage (Clamping Spun Copper Drain)
D3.7.8-4 Water & Drainage (Open Wall Scupper)(Under Construction)
D3.7.8-5 Water & Drainage (Through-wall Scupper)(Under Construction)
D3.7.9-1 Miscellaneous Penetrations (Roof Anchor)(Under Construction)
D3.7.9-2 Miscellaneous Penetrations (Wall Anchor - Conventional Roof Assy)(Under Construction)
D3.7.9-3 Miscellaneous Penetrations (Wall Anchor - Protected Roof Assy)(Under Construction)

3 PVC

10 PERIMETERS and WALLS

D3.7.5-1 Roof-Wall Transitions (Expansion Joint)(Under Construction)
D3.7.5-2 Roof-Wall Transitions (Divider/Joint)(Under Construction)
D3.7.5-3 Roof-Wall Transitions (Fire Separation Joint)(Under Construction)
D3.7.5-4 Roof-Wall Transitions (Fire Separation Wall)(Under Construction)
D3.7.2-1 Parapets & Copings (High - Wall Supported)(Under Construction)
D3.7.2-2 Parapets & Copings (Parapet - Wall Transition)(Under Construction)
D3.7.3-1 Edges & Fascia (Cant Edge)(Under Construction)
D3.7.3-2 Edges & Fascia (Gravel Stop)(Under Construction)
D3.7.3-3 Edges & Fascia (Roof Edge)
D3.7.4-1 Counter-flashings & Reglets (Deck - Wall Supported)(Under Construction)
D3.7.4-2 Counter-flashings & Reglets (Deck - Unsupported by Wall)(Under Construction)
D3.7.4-3 Counter-flashings & Reglets (Stucco Wall: Re-roofing)(Under Construction)
D3.7.4-4 Counter-flashings & Reglets (Stucco Wall: New)(Under Construction)
D3.7.4-5 Counter-flashings & Reglets (Double Surface Reglet)(Under Construction)
D3.7.4-6 Counter-flashings & Reglets (Low Door Sill)(Under Construction)
D3.7.4-7 Counter-flashings & Reglets (Window Curb)(Under Construction)

11 PERIMETERS and DRAINS

D3.7.6-1 Curbs & Sleepers (Equipment Sleeper)(Under Construction)
D3.7.6-2 Curbs & Sleepers (Multiple Roof Penetrations)(Under Construction)
D3.7.6-3 Curbs & Sleepers (Basic Curb)
D3.7.6-4 Curbs & Sleepers (Mechanical Opening)
D3.7.7-1 Strip-in Flashings (Metal Plumbing)(Under Construction)
D3.7.7-2 Strip-in Flashings (Two-part Cable)
D3.7.7-3 Strip-in Flashings (Pourable Sealer Pocket)(Under Construction)
D3.7.8-1 Water & Drainage (Cast Iron Drain)(Under Construction)
D3.7.8-2 Water & Drainage (Spun Copper Drain)(Under Construction)
D3.7.8-3 Water & Drainage (Clamping Spun Copper Drain)
D3.7.8-4 Water & Drainage (Open Wall Scupper)(Under Construction)
D3.7.8-5 Water & Drainage (Through-wall Scupper)(Under Construction)
D3.7.9-1 Miscellaneous Penetrations (Roof Anchor)(Under Construction)
D3.7.9-2 Miscellaneous Penetrations (Wall Anchor - Conventional Roof Assy)(Under Construction)
D3.7.9-3 Miscellaneous Penetrations (Wall Anchor - Protected Roof Assy)(Under Construction)