Difference between revisions of "Drafting - Division A, C"
Difference between revisions of "Drafting - Division A, C"
(→PVC) |
|||
Line 139: | Line 139: | ||
<hr> | <hr> | ||
</div> | </div> | ||
+ | |||
+ | [[Construction Details (drafting page)]] |
Revision as of 15:29, 14 November 2019
This page is used for drafting new or revised wordings, before publishing
Construction Details (holding pen)
1 EPDM
10 PERIMETERS and WALLS
- D2.7.5-1 Roof-Wall Transitions (Expansion Joint)(Under Construction)
- D2.7.5-2 Roof-Wall Transitions (Divider/Joint)(Under Construction)
- D2.7.5-3 Roof-Wall Transitions (Fire Separation Joint)(Under Construction)
- D2.7.5-4 Roof-Wall Transitions (Fire Separation Wall)(Under Construction)
- D2.7.2-1 Parapets & Copings (High - Wall Supported)(Under Construction)
- D2.7.2-2 Parapets & Copings (Parapet - Wall Transition)(Under Construction)
- D2.7.3-1 Edges & Fascia (Cant Edge)(Under Construction)
- D2.7.3-2 Edges & Fascia (Gravel Stop)(Under Construction)
- D2.7.4-1 Counter-flashings & Reglets (Deck - Wall Supported)(Under Construction)
- D2.7.4-2 Counter-flashings & Reglets (Deck - Unsupported by Wall)(Under Construction)
- D2.7.4-3 Counter-flashings & Reglets (Stucco Wall: Re-roofing)(Under Construction)
- D2.7.4-4 Counter-flashings & Reglets (Stucco Wall: New)(Under Construction)
- D2.7.4-5 Counter-flashings & Reglets (Double Surface Reglet)(Under Construction)
- D2.7.4-6 Counter-flashings & Reglets (Low Door Sill)(Under Construction)
- D2.7.4-7 Counter-flashings & Reglets (Window Curb)(Under Construction)
11 PERIMETERS and DRAINS
- D2.7.6-1 Curbs & Sleepers (Equipment Sleeper)(Under Construction)
- D2.7.6-2 Curbs & Sleepers (Multiple Roof Penetrations)(Under Construction)
- D2.7.6-3 Curbs & Sleepers (Basic Curb)
- D2.7.6-4 Curbs & Sleepers (Mechanical Opening)
- D2.7.7-1 Strip-in Flashings (Metal Plumbing)(Under Construction)
- D2.7.7-2 Strip-in Flashings (Two-part Cable)
- D2.7.7-3 Strip-in Flashings (Pourable Sealer Pocket)(Under Construction)
- D2.7.8-1 Water & Drainage (Cast Iron Drain)(Under Construction)
- D2.7.8-2 Water & Drainage (Spun Copper Drain)(Under Construction)
- D2.7.8-3 Water & Drainage (Clamping Spun Copper Drain)
- D2.7.8-4 Water & Drainage (Open Wall Scupper)(Under Construction)
- D2.7.8-5 Water & Drainage (Through-wall Scupper)(Under Construction)
2 TPO
10 PERIMETERS and WALLS
- D3.7.5-1 Roof-Wall Transitions (Expansion Joint)(Under Construction)
- D3.7.5-2 Roof-Wall Transitions (Divider/Joint)(Under Construction)
- D3.7.5-3 Roof-Wall Transitions (Fire Separation Joint)(Under Construction)
- D3.7.5-4 Roof-Wall Transitions (Fire Separation Wall)(Under Construction)
- D3.7.2-1 Parapets & Copings (High - Wall Supported)(Under Construction)
- D3.7.2-2 Parapets & Copings (Parapet - Wall Transition)(Under Construction)
- D3.7.3-1 Edges & Fascia (Cant Edge)(Under Construction)
- D3.7.3-2 Edges & Fascia (Gravel Stop)(Under Construction)
- D3.7.3-3 Edges & Fascia (Roof Edge)
- D3.7.4-1 Counter-flashings & Reglets (Deck - Wall Supported)(Under Construction)
- D3.7.4-2 Counter-flashings & Reglets (Deck - Unsupported by Wall)(Under Construction)
- D3.7.4-3 Counter-flashings & Reglets (Stucco Wall: Re-roofing)(Under Construction)
- D3.7.4-4 Counter-flashings & Reglets (Stucco Wall: New)(Under Construction)
- D3.7.4-5 Counter-flashings & Reglets (Double Surface Reglet)(Under Construction)
- D3.7.4-6 Counter-flashings & Reglets (Low Door Sill)(Under Construction)
- D3.7.4-7 Counter-flashings & Reglets (Window Curb)(Under Construction)
11 PERIMETERS and DRAINS
- D3.7.6-1 Curbs & Sleepers (Equipment Sleeper)(Under Construction)
- D3.7.6-2 Curbs & Sleepers (Multiple Roof Penetrations)(Under Construction)
- D3.7.6-3 Curbs & Sleepers (Basic Curb)
- D3.7.6-4 Curbs & Sleepers (Mechanical Opening)
- D3.7.7-1 Strip-in Flashings (Metal Plumbing)(Under Construction)
- D3.7.7-2 Strip-in Flashings (Two-part Cable)
- D3.7.7-3 Strip-in Flashings (Pourable Sealer Pocket)(Under Construction)
- D3.7.8-1 Water & Drainage (Cast Iron Drain)(Under Construction)
- D3.7.8-2 Water & Drainage (Spun Copper Drain)(Under Construction)
- D3.7.8-3 Water & Drainage (Clamping Spun Copper Drain)
- D3.7.8-4 Water & Drainage (Open Wall Scupper)(Under Construction)
- D3.7.8-5 Water & Drainage (Through-wall Scupper)(Under Construction)
3 PVC
10 PERIMETERS and WALLS
- D3.7.5-1 Roof-Wall Transitions (Expansion Joint)(Under Construction)
- D3.7.5-2 Roof-Wall Transitions (Divider/Joint)(Under Construction)
- D3.7.5-3 Roof-Wall Transitions (Fire Separation Joint)(Under Construction)
- D3.7.5-4 Roof-Wall Transitions (Fire Separation Wall)(Under Construction)
- D3.7.2-1 Parapets & Copings (High - Wall Supported)(Under Construction)
- D3.7.2-2 Parapets & Copings (Parapet - Wall Transition)(Under Construction)
- D3.7.3-1 Edges & Fascia (Cant Edge)(Under Construction)
- D3.7.3-2 Edges & Fascia (Gravel Stop)(Under Construction)
- D3.7.3-3 Edges & Fascia (Roof Edge)
- D3.7.4-1 Counter-flashings & Reglets (Deck - Wall Supported)(Under Construction)
- D3.7.4-2 Counter-flashings & Reglets (Deck - Unsupported by Wall)(Under Construction)
- D3.7.4-3 Counter-flashings & Reglets (Stucco Wall: Re-roofing)(Under Construction)
- D3.7.4-4 Counter-flashings & Reglets (Stucco Wall: New)(Under Construction)
- D3.7.4-5 Counter-flashings & Reglets (Double Surface Reglet)(Under Construction)
- D3.7.4-6 Counter-flashings & Reglets (Low Door Sill)(Under Construction)
- D3.7.4-7 Counter-flashings & Reglets (Window Curb)(Under Construction)
11 PERIMETERS and DRAINS
- D3.7.6-1 Curbs & Sleepers (Equipment Sleeper)(Under Construction)
- D3.7.6-2 Curbs & Sleepers (Multiple Roof Penetrations)(Under Construction)
- D3.7.6-3 Curbs & Sleepers (Basic Curb)
- D3.7.6-4 Curbs & Sleepers (Mechanical Opening)
- D3.7.7-1 Strip-in Flashings (Metal Plumbing)(Under Construction)
- D3.7.7-2 Strip-in Flashings (Two-part Cable)
- D3.7.7-3 Strip-in Flashings (Pourable Sealer Pocket)(Under Construction)
- D3.7.8-1 Water & Drainage (Cast Iron Drain)(Under Construction)
- D3.7.8-2 Water & Drainage (Spun Copper Drain)(Under Construction)
- D3.7.8-3 Water & Drainage (Clamping Spun Copper Drain)
- D3.7.8-4 Water & Drainage (Open Wall Scupper)(Under Construction)
- D3.7.8-5 Water & Drainage (Through-wall Scupper)(Under Construction)