− | [[RoofStar Guarantee Standards for SBS Modified Bitumen | + | [[RoofStar Guarantee Standards for SBS Modified Bitumen Membrane Systems |<i class="fa fa-chevron-circle-left fa" ></i> Back to ''RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies'']] |
[[SBS Modified Bitumen Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''SBS Modified Bitumen Construction Details'']] | [[SBS Modified Bitumen Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''SBS Modified Bitumen Construction Details'']] | ||
[[Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''Construction Details'']] | [[Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''Construction Details'']] |
Revision as of 19:30, 21 November 2019
RoofStar Guarantee Standards are blue-linked |
SBS Details
1 WORK INCLUDED
- (1) Air or Vapour Control Layers
- If required by design authority
- (2) Insulation
- See available insulation products in the Accepted Materials section of this Manual.
- (3) Insulation Overlay
- Where required.
- (4) Primary Membrane and Membrane Protection
- Mechanically fasten to outside face of fascia (C).
- (5) Mastic
- Trowel coating of compatible mastic.
- (6) Metal Edge/Gravel-stop Flashing
- Flashing must have a minimum 100 mm (4") flange that extends onto roof base membrane. A flush termination is permissible and more common than a "gravel stop" (see 10.3.5.2 Metal Edge Terminations for application standards). Where a gravel-stop upstand is desirable (shown in the detail at left), it must not be higher than 25 mm (1") high.
- Embed the flashing in mastic and mechanically fasten alternately between centre and edge of flange at 100 mm (4") O.C. Lengths of flashing may be joined end-to-end with an overlap no less than 100 mm (4").
- (7) Membrane Flashing
- Asphalt and gravel roofing systems, 2 overlapping plies of a minimum 2 mm reinforced SBS modified bitumen base sheet. For flexible membrane systems, refer to manufacturer’s application details and RoofStar Guarantee Standards.
- (8) Asphalt
- For asphalt and gravel built-up roofing systems only.
- (9) Gravel
- For asphalt and gravel built-up roofing systems only.
2 RELATED WORK BY OTHERS
- (A) Acceptable Supporting Deck Structure
- (B) Wood Blocking
- (C) Wood Fascia
NOTE: Refer to RoofStar Guarantee Standards for additional requirements.
Back to RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies