Difference between revisions of "Draft CD 3"

Jump to: navigation, search

Difference between revisions of "Draft CD 3"

(Created page with "{| class="wikitable" | style="color: black; background-color: orange; width: 100%;text-align:center" | colspan="2" | <big>'''''RoofStar Guarantee Standards''''' are <span sty...")
 
Line 7: Line 7:
 
<div class="col-md-6">
 
<div class="col-md-6">
 
<div style="text-align:center; vertical-align:center">
 
<div style="text-align:center; vertical-align:center">
[[File:D1.7.2.jpg|class=img-responsive | link=http://rpm.rcabc.org/images/4/4a/D1.7.2.jpg]]
+
[[File:SBS 1.3.1-2 (Optional Hot Works).jpg|class=img-responsive | link=http://rpm.rcabc.org/images/d/d2/SBS_1.3.1-2_%28Optional_Hot_Works%29.jpg]]
 
</div>
 
</div>
  
Line 20: Line 20:
 
<div class="col-md-6">
 
<div class="col-md-6">
 
=== WORK INCLUDED ===
 
=== WORK INCLUDED ===
;(1) [[RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies#SBSBASE|'''Base Field Membrane''']]:
+
;(1) [[RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies#SBSDECKWALLOVERLAY|'''Supporting Deck Overlay''']]: Optional, depending upon deck condition and roof system requirements.
:Adhered to deck using asphalt, cold adhesive, self-adhered, torch applied membrane or loose laid according to manufacturer's specification and to  the <i>RoofStar Guarantee Standards</i>.
+
;(2) [[RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies#SBSAIRVAPOUR|'''Air or Vapour Control Layer''']]: Installed following the requirements of '''Part 6''' in this Standard.
;(2) [[RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies#SBS-STRIPPING|'''Base Membrane Flashing''']]: Adhered according to manufacturer's specifications using cold adhesive, self-adhered or torch applied to cover boards, or mechanically attached membrane. Torching directly to wood surfaces is not permitted. Must be carried over to outside of parapet or minimum 200 mm (8") above finished roof surface.
+
;(3) [[RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies#SBSINSULATIONAPPLICATION|'''Insulation''']]: Installed in staggered and offset layers (not fully illustrated), and secured in accordance with the design of the system, which is based on the ''British Columbia Building Code'', Part 4 and Part 5, and on Part 3 of the '''''RoofStar Guarantee Standards''''' for the membrane system type.
;(3) [[RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies#SBSBASE|'''Cap Field Membrane''']]: Applied according to manufacturer&#8217;s printed instructions and <i>RoofStar Guarantee Standards</i>.
+
;(4) [[RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies#SBSINSULATIONOVERLAY|'''Insulation Overlay''']]: Subject to the requirements of '''Part 8''' in the '''''RoofStar Guarantee Standards''''' for the membrane system type.
;(4) [[RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies#SBS-STRIPPING|'''Cap Membrane Flashing''']]: Applied according to manufacturer&#8217;s printed instructions and <i>RoofStar Guarantee Standards</i> to top of parapet or minimum 200 mm (8") above top of finished roof surface.
+
;(5) Primer: As required by the membrane manufacturer.
;(5) [[RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies#SBSINSULATION|'''Insulation''']]: See available insulation products in the [[Roof Deck Insulation|'''Accepted Materials''']] section of this Manual.
+
;(6) [[RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies#SBSPERIMETERSALT|'''Base Membrane (pre-flashing, as illustrated)''']]: Base membrane flashing is applied before the field membrane (pre-flashing), and is carried vertically up a wall or parapet at least 200 mm (8”); on parapets, carry the base membrane flashing over the outside face of the parapet at least 50 mm (2”) and secure it (see '''10.3.5.1''' ('''2''')).  Extend base membrane flashing onto the field substrate at least 100 mm (4”) (greater if required by the membrane manufacturer).  See also '''Figure 10.2''' ('''a''' through '''d''') for sequential illustrations.
;(6) [[RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies#SBSFILTER|'''Filter Fabric''']]: Metal base flashing required.  See [[RoofStar Guarantee Standards for SBS Roof Systems#SBSMETAL|'''Section 12''']].
+
;(7) [[RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies#SBSPERIMETERSALT|'''Base Membrane (field)''']]: Pre-flashing approach (Illustrated).  Base field membrane is installed on a suitable, prepared substrate.  See '''9.3''' for application requirements.  If permitted by the membrane manufacturer, the field membrane may be turned up at the ends at least 100 mm (4”) (see illustration above), to protect any vulnerabilities at the change in plane.  Also see '''10.3.3''' for other application approaches.
;(7) [[RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies#SBSBALLAST|'''Ballast''']]: Gravel or concrete paving tiles.
+
;(8) [[RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies#SBSMEMBRANES|'''Cap Membrane (field)''']]: Granule-surfaced membrane, which may be adhered, self-adhered or heat-welded.  See Tables '''9.1''' and '''9.2''' for acceptable cap membrane types and their securement options.  See '''9.3''' for application requirements.
;(8) [[RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies#METALCAP-SBS|'''Metal Flashing''']]: As required by ''RoofStar Guarantee Standards''.
+
;(9) [[RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies#SBSPERIMETERS|'''Cap Membrane (flashing)''']]: Extended vertically past the termination of the base membrane flashing, to provide a positive seal at the top edge.  Membrane may be terminated at the top of the vertical plane or turned onto the top of the parapet as required by the manufacturer ('''9a''').
;(9) '''Fire-stop Tape'''.
+
;(10) [[RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies#SBSMETALFLASH|'''Metal Cap Flashing''']]: Fabricated and secured according to the requirements in Part '''13 METAL FLASHINGS'''.
  
 
<hr>
 
<hr>
  
 
=== RELATED WORK BY OTHERS ===
 
=== RELATED WORK BY OTHERS ===
;(A) [[RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies#SBSDECKS|'''Acceptable Supporting Deck Structure''']]:
+
;(A) [[RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies#SBSDECKS|'''Acceptable Deck''']]:
:Smooth, dry and clean concrete, coated with proprietary primer.
+
;(B)  Suitable Wall Sheathing: If and as required.
;(B)  Plywood Backing:  
+
;(C) [[RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies#SBSSLOPEDWOODBLOCKING|'''Sloped Parapet Top''']]:Sloped to roof where parapet is over 100 mm (4") in width.
:Required on rough concrete or where stripping adhesion is asphalt. Must be primed.
+
;(D) Wall or Parapet Structure
;(C) [[RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies#SBSSLOPEDWOODBLOCKING|'''Sloped Wood Blocking''']]
 
:Sloped to roof where parapet is over 100 mm (4") in width.
 
 
</div><!-- COL-6-MD -->
 
</div><!-- COL-6-MD -->
 
</div><!-- PANEL BODY -->
 
</div><!-- PANEL BODY -->
Line 50: Line 48:
  
  
[[RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies |<i class="fa fa-chevron-circle-left fa" ></i> Back to ''RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies'']]
+
[[RoofStar Guarantee Standards for SBS Modified Bitumen Membrane Systems|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''RoofStar Guarantee Standards for SBS Modified Bitumen Membrane Systems'']]
  
 
[[SBS Modified Bitumen Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''SBS Modified Bitumen Construction Details'']]
 
[[SBS Modified Bitumen Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''SBS Modified Bitumen Construction Details'']]
  
 
[[Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''Construction Details'']]
 
[[Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''Construction Details'']]

Revision as of 18:43, 11 February 2020

RoofStar Guarantee Standards are blue-linked
SBS Details

SBS 1.3.1-2 (Optional Hot Works).jpg


Click below for a printable version of this page.
Print Sheet

1 WORK INCLUDED

(1) Supporting Deck Overlay
Optional, depending upon deck condition and roof system requirements.
(2) Air or Vapour Control Layer
Installed following the requirements of Part 6 in this Standard.
(3) Insulation
Installed in staggered and offset layers (not fully illustrated), and secured in accordance with the design of the system, which is based on the British Columbia Building Code, Part 4 and Part 5, and on Part 3 of the RoofStar Guarantee Standards for the membrane system type.
(4) Insulation Overlay
Subject to the requirements of Part 8 in the RoofStar Guarantee Standards for the membrane system type.
(5) Primer
As required by the membrane manufacturer.
(6) Base Membrane (pre-flashing, as illustrated)
Base membrane flashing is applied before the field membrane (pre-flashing), and is carried vertically up a wall or parapet at least 200 mm (8”); on parapets, carry the base membrane flashing over the outside face of the parapet at least 50 mm (2”) and secure it (see 10.3.5.1 (2)). Extend base membrane flashing onto the field substrate at least 100 mm (4”) (greater if required by the membrane manufacturer). See also Figure 10.2 (a through d) for sequential illustrations.
(7) Base Membrane (field)
Pre-flashing approach (Illustrated). Base field membrane is installed on a suitable, prepared substrate. See 9.3 for application requirements. If permitted by the membrane manufacturer, the field membrane may be turned up at the ends at least 100 mm (4”) (see illustration above), to protect any vulnerabilities at the change in plane. Also see 10.3.3 for other application approaches.
(8) Cap Membrane (field)
Granule-surfaced membrane, which may be adhered, self-adhered or heat-welded. See Tables 9.1 and 9.2 for acceptable cap membrane types and their securement options. See 9.3 for application requirements.
(9) Cap Membrane (flashing)
Extended vertically past the termination of the base membrane flashing, to provide a positive seal at the top edge. Membrane may be terminated at the top of the vertical plane or turned onto the top of the parapet as required by the manufacturer (9a).
(10) Metal Cap Flashing
Fabricated and secured according to the requirements in Part 13 METAL FLASHINGS.

2 RELATED WORK BY OTHERS

(A) Acceptable Deck
(B) Suitable Wall Sheathing
If and as required.
(C) Sloped Parapet Top
Sloped to roof where parapet is over 100 mm (4") in width.
(D) Wall or Parapet Structure

NOTE: Refer to RoofStar Guarantee Standards for additional requirements.




Back to RoofStar Guarantee Standards for SBS Modified Bitumen Membrane Systems

Back to SBS Modified Bitumen Construction Details

Back to Construction Details