Difference between revisions of "Draft CD 1"
Difference between revisions of "Draft CD 1"
Line 1: | Line 1: | ||
{| class="wikitable" | style="color: black; background-color: orange; width: 100%;text-align:center" | {| class="wikitable" | style="color: black; background-color: orange; width: 100%;text-align:center" | ||
− | | colspan="2" | <big>'''''RoofStar Guarantee Standards''''' are <span style="color:#6495ed">'''blue-linked'''</span | + | | colspan="2" | <big>'''''Notice to Reader'''''</big> |
+ | |- | ||
+ | | style="color: black; background-color: #ffffcc; width: 100%;text-align:center" | Images used in a Construction Detail are representative and <u>not intended in their representation of an assembly to be prescriptive</u>. Nor are they necessarily drawn to scale. Rather, they are provided to visually convey the Standards, Guiding Principles and Recommendations of the '''RoofStar Guarantee Standards''' for a Waterproofing or Water-shedding System. Actual design with respect to dimensions, the selection of materials and their application remains the responsibility of the ''Design Authority''.<br><br>'''''RoofStar Guarantee Standards''''' are <span style="color:#6495ed">'''blue-linked'''</span> | ||
|} | |} | ||
<div class="panel panel-success"> | <div class="panel panel-success"> | ||
Line 33: | Line 35: | ||
<div class="col-md-6"> | <div class="col-md-6"> | ||
=== WORK INCLUDED === | === WORK INCLUDED === | ||
− | ;(1) [[RoofStar Guarantee Standards for SBS Modified Bitumen | + | ;(1) [[RoofStar Guarantee Standards for SBS Modified Bitumen Membrane Systems#SBSMETALCAP|'''Metal Cap Flashing''']]: Fabricate and install in keeping with the Standards in Part '''13 METAL FLASHINGS'''. Base membrane must extend across the top of the parapet (to waterproof the structure and separate the metal from moisture-susceptible substrates) and extend down the outside face of the parapet at least 50 mm (2”). Edges must be hemmed (1a), although a kicked-out drip edge is optional (see '''13.3.2''' ('''1''') '''Fabrication'''). |
− | ;(2) [[RoofStar Guarantee Standards for SBS Modified Bitumen | + | ;(2) [[RoofStar Guarantee Standards for SBS Modified Bitumen Membrane Systems#SBSMETALFASTENER|'''Fasteners''']]: Select for compatibility with metal flashing, membrane and substrate (see '''13.2.3 Fasteners'''). |
− | ;(3) [[RoofStar Guarantee Standards for SBS Modified Bitumen | + | ;(3) [[RoofStar Guarantee Standards for SBS Modified Bitumen Membrane Systems#SBSMETALSECUREMENT|'''Clips''']]: Install cap flashings using a continuous or discontinuous metal ‘wind’ clip affixed to the outside face of the parapet, or to the top of the parapet (see Alternate illustration). Fasten the clip following the standards in both '''13.3.3 Securement''' and '''13.3.5 Cap, Counter and Base Flashings'''. |
− | ;(4) [[RoofStar Guarantee Standards for SBS Modified Bitumen | + | ;(4) [[RoofStar Guarantee Standards for SBS Modified Bitumen Membrane Systems#SBSMETALSEAM|'''Seam''']]: Must be either a Standing Seam (illustrated) or an S-lock (single or double – see inset illustrations). The use of acceptable seams allows for multi-directional expansion and contraction of sheet metal. |
<hr> | <hr> |
Revision as of 20:47, 11 February 2020
Notice to Reader | |
Images used in a Construction Detail are representative and not intended in their representation of an assembly to be prescriptive. Nor are they necessarily drawn to scale. Rather, they are provided to visually convey the Standards, Guiding Principles and Recommendations of the RoofStar Guarantee Standards for a Waterproofing or Water-shedding System. Actual design with respect to dimensions, the selection of materials and their application remains the responsibility of the Design Authority. RoofStar Guarantee Standards are blue-linked |
SBS Details
- Click below for a printable version of this page.
1 WORK INCLUDED
- (1) Metal Cap Flashing
- Fabricate and install in keeping with the Standards in Part 13 METAL FLASHINGS. Base membrane must extend across the top of the parapet (to waterproof the structure and separate the metal from moisture-susceptible substrates) and extend down the outside face of the parapet at least 50 mm (2”). Edges must be hemmed (1a), although a kicked-out drip edge is optional (see 13.3.2 (1) Fabrication).
- (2) Fasteners
- Select for compatibility with metal flashing, membrane and substrate (see 13.2.3 Fasteners).
- (3) Clips
- Install cap flashings using a continuous or discontinuous metal ‘wind’ clip affixed to the outside face of the parapet, or to the top of the parapet (see Alternate illustration). Fasten the clip following the standards in both 13.3.3 Securement and 13.3.5 Cap, Counter and Base Flashings.
- (4) Seam
- Must be either a Standing Seam (illustrated) or an S-lock (single or double – see inset illustrations). The use of acceptable seams allows for multi-directional expansion and contraction of sheet metal.
2 RELATED WORK BY OTHERS
- (A) Parapet Structure
- (B) Parapet woodwork (sloped toward roof surface
NOTE: Refer to RoofStar Guarantee Standards for additional requirements.
Back to RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies