Difference between revisions of "PVC Conventionally Insulated System (Typical)"

Jump to: navigation, search

Difference between revisions of "PVC Conventionally Insulated System (Typical)"

(Created page with "{| class="wikitable" | style="color: black; background-color: orange; width: 100%;text-align:center" | colspan="2" | <big>'''''RoofStar Guarantee Standards''''' are <span sty...")
 
(RELATED WORK BY OTHERS)
Line 39: Line 39:
 
[[RoofStar Guarantee Standards for PVC Membrane Systems|<i class="fa fa-chevron-circle-left fa" ></i> RoofStar Guarantee Standards for PVC Membrane Systems]]
 
[[RoofStar Guarantee Standards for PVC Membrane Systems|<i class="fa fa-chevron-circle-left fa" ></i> RoofStar Guarantee Standards for PVC Membrane Systems]]
  
[[PVC (Thermoplastic Membranes) Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''PVCConstruction Details'']]
+
[[PVC (Thermoplastic Membranes) Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''PVC Construction Details'']]
  
 
[[Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''Construction Details'']]
 
[[Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''Construction Details'']]

Revision as of 19:24, 18 February 2020

RoofStar Guarantee Standards are blue-linked
PVC Details

6.3.1.1.jpg

1 WORK INCLUDED

1) Gypsum Deck Overlay
May be required depending on insulation thickness or when required as a thermal barrier by design authority.
(2) Insulation
Mechanically attached. Installed according to RoofStar Guarantee Standards. See available insulation products in the Accepted Materials section of this Manual.
(3) Single-ply Membrane
Installed according to manufacturer's instructions and RoofStar Guarantee Standards.
(4) Adhesive
Proprietary, installed according to manufacturer's instructions, usually brushed, rolled or sprayed.
(5) Membrane Flashing
Adhered according to manufacturer's printed specifications using proprietary adhesive. Must be carried to outside of parapet or minimum 200 mm (8") above finished roof surface.
(6) Fasteners
Install according to manufacturer's instructions (style may vary depending on material type and manufacturer's specification).
(7) Membrane Lap
Thermoplastic membrane may be welded or chemically bonded.
(8) Metal Cap Flashing
As required by the RoofStar Guarantee Standards.

2 RELATED WORK BY OTHERS

(A) Acceptable Deck
(B) Acceptable Parapet Surface
Surface must be smooth, dry and clean. Rough surface must be covered with treated plywood, to be determined by design authority or inspector or as required by manufacturer.
(C) Sloped Wood Blocking

NOTE: Refer to RoofStar Guarantee Standards for additional requirements.



RoofStar Guarantee Standards for PVC Membrane Systems

Back to PVC Construction Details

Back to Construction Details