Difference between revisions of "SBS Metal Edge Termination"
Difference between revisions of "SBS Metal Edge Termination"
(→WORK INCLUDED) |
(→WORK INCLUDED) |
||
Line 24: | Line 24: | ||
;(2) [[Standard for SBS-Modified Bitumen Membrane Systems#MEMB_FIELD_MATERIALS|'''Base Membrane (field)''']]: Torch-applied, adhered, self-adhered (as illustrated), or mechanically attached (subject to deck type and wind uplift design requirements). See Tables '''9.1''' and '''9.2''' for acceptable membrane types and securement options. See '''9.3''' for application requirements. | ;(2) [[Standard for SBS-Modified Bitumen Membrane Systems#MEMB_FIELD_MATERIALS|'''Base Membrane (field)''']]: Torch-applied, adhered, self-adhered (as illustrated), or mechanically attached (subject to deck type and wind uplift design requirements). See Tables '''9.1''' and '''9.2''' for acceptable membrane types and securement options. See '''9.3''' for application requirements. | ||
;(3) [[Standard for SBS-Modified Bitumen Membrane Systems#MEMB_PERIM_LOW_EDGE|'''Mastic''']]: Applied beneath metal edge flashing. Refer to '''10.3.5.2''' ('''3''')('''2'''). | ;(3) [[Standard for SBS-Modified Bitumen Membrane Systems#MEMB_PERIM_LOW_EDGE|'''Mastic''']]: Applied beneath metal edge flashing. Refer to '''10.3.5.2''' ('''3''')('''2'''). | ||
− | ;(4) [[Standard for SBS-Modified Bitumen Membrane Systems#LINEAR_M_EDGE|'''Metal Edge Flashing''']]: See '''13.3.2 Fabrication''' for manufacturing requirements. See also '''10.3. | + | ;(4) [[Standard for SBS-Modified Bitumen Membrane Systems#LINEAR_M_EDGE|'''Metal Edge Flashing''']]: See '''13.3.2 Fabrication''' for manufacturing requirements. See also '''10.3.1.4 Low Roof Edges''' for application standards and securement. Hemmed edges are required; a kicked-out drip edge is optional but recommended (cf. '''13.1.2.2''' ('''10''')). |
;(5) [[Standard for SBS-Modified Bitumen Membrane Systems#MEMB_PERIM_APPLICATION|'''Base Membrane (flashing)''']]: Applied to overlap metal flashing and the field base membrane. | ;(5) [[Standard for SBS-Modified Bitumen Membrane Systems#MEMB_PERIM_APPLICATION|'''Base Membrane (flashing)''']]: Applied to overlap metal flashing and the field base membrane. | ||
;(6) [[Standard for SBS-Modified Bitumen Membrane Systems#MEMB_PERIM_APPLICATION|'''Cap Membrane (field)''']]: Installed according to '''Part 9''' standards and sealed along the exposed edge with an un-tooled bead of membrane compatible sealant (cf. '''10.3.5.2''' ('''3''')('''7''')('''2''')). | ;(6) [[Standard for SBS-Modified Bitumen Membrane Systems#MEMB_PERIM_APPLICATION|'''Cap Membrane (field)''']]: Installed according to '''Part 9''' standards and sealed along the exposed edge with an un-tooled bead of membrane compatible sealant (cf. '''10.3.5.2''' ('''3''')('''7''')('''2''')). |
Revision as of 17:46, 6 May 2021
Notice to Reader | |
Images used in a Construction Detail are representative and not intended in their representation of an assembly to be prescriptive. Nor are they necessarily drawn to scale. Rather, they are provided to visually convey the Standards, Guiding Principles and Recommendations of the RoofStar Guarantee Standards for a Waterproofing or Water-shedding System. Actual design with respect to dimensions, the selection of materials and their application remains the responsibility of the Design Authority. The full text of applicable RoofStar Guarantee Standards may be read by using the blue hyperlinks |
SBS Details
1 WORK INCLUDED
- (1) Primer
- For self-adhered or torch-applied base membranes, as required by the membrane manufacturer.
- (2) Base Membrane (field)
- Torch-applied, adhered, self-adhered (as illustrated), or mechanically attached (subject to deck type and wind uplift design requirements). See Tables 9.1 and 9.2 for acceptable membrane types and securement options. See 9.3 for application requirements.
- (3) Mastic
- Applied beneath metal edge flashing. Refer to 10.3.5.2 (3)(2).
- (4) Metal Edge Flashing
- See 13.3.2 Fabrication for manufacturing requirements. See also 10.3.1.4 Low Roof Edges for application standards and securement. Hemmed edges are required; a kicked-out drip edge is optional but recommended (cf. 13.1.2.2 (10)).
- (5) Base Membrane (flashing)
- Applied to overlap metal flashing and the field base membrane.
- (6) Cap Membrane (field)
- Installed according to Part 9 standards and sealed along the exposed edge with an un-tooled bead of membrane compatible sealant (cf. 10.3.5.2 (3)(7)(2)).
2 RELATED WORK BY OTHERS
- (A) Acceptable Substrate
- Representative
- (B) Wall Assembly
- Representative
NOTE: Refer to RoofStar Guarantee Standards for additional requirements.
Back to RoofStar Guarantee Standards for SBS Modified Bitumen Membrane Systems