Difference between revisions of "Asphalt Shingles - Application (Low Slopes)"
Difference between revisions of "Asphalt Shingles - Application (Low Slopes)"
(→WORK INCLUDED) |
(→RELATED WORK BY OTHERS) |
||
Line 26: | Line 26: | ||
=== RELATED WORK BY OTHERS === | === RELATED WORK BY OTHERS === | ||
− | ;(A) [[ | + | ;(A) [[Standard for Asphalt Shingle Systems#AShDECKS|'''Acceptable Deck''']] |
</div><!-- COL-6-MD --> | </div><!-- COL-6-MD --> | ||
</div><!-- PANEL BODY --> | </div><!-- PANEL BODY --> | ||
Line 36: | Line 36: | ||
− | [[ | + | [[Standard for Asphalt Shingle Systems|<i class="fa fa-chevron-circle-left fa" ></i> Standard for Asphalt Shingle Systems]] |
[[Asphalt Shingle Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''Asphalt Shingles Construction Details'']] | [[Asphalt Shingle Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''Asphalt Shingles Construction Details'']] | ||
[[Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''Construction Details'']] | [[Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''Construction Details'']] |
Revision as of 14:32, 8 June 2021
RoofStar Guarantee Standards are blue-linked |
Asphalt Shingle Details
1 WORK INCLUDED
- (1) Underlayment & Eave Protection
- One ply of self-adhered modified bituminous underlayment material. Lap 75 mm (3") minimum on sides and 150 mm (6") minimum on ends.
- (2) Edge Metal Flashing
- Required for all eave and rake edges.
- (3) Starter Course
- Consists of same type shingles used for roof, applied tabs facing up the slope.
- (4) Strip or Standard Shingles
- Applied as recommended by manufacturer. Laminated shingles are not acceptable for this application unless expressly permitted by the manufacturer.
- (5) Compatible Mastic
- Heavy bead of compatible asphaltic mastic at rakes (gables) and valleys.
- (6) Protrusions
- Curbs and skylights must be flashed with underlayment so as to shed water, with minimum 125mm (5") up vertical surfaces and 150 mm (6") lapping onto field surfaces. Vent stack underlayment flashing should fit tight to the vent pipe and be sealed with compatible mastic. For fire-rated stacks or hot pipe protrusions, strip in secondary metal deck flashing before installing rated stack / pipe flashing.
- (7) Nailing
- See the requirements in Section 3.3 Application.
2 RELATED WORK BY OTHERS
- (A) Acceptable Deck
NOTE: Refer to RoofStar Guarantee Standards for additional requirements.
Standard for Asphalt Shingle Systems