Difference between revisions of "SBS Sealant Pocket"
Difference between revisions of "SBS Sealant Pocket"
m (James Klassen moved page SBS Details:D1.7.7-3 Strip-in Flashings (Sealant Pocket) to SBS 11.3.3.4 Sealant Pocket) |
|||
Line 1: | Line 1: | ||
+ | {{Template:RPM Info}} | ||
+ | |||
{| class="wikitable" | style="color: black; background-color: orange; width: 100%;text-align:center" | {| class="wikitable" | style="color: black; background-color: orange; width: 100%;text-align:center" | ||
| colspan="2" | <big>'''''RoofStar Guarantee Standards''''' are <span style="color:#6495ed">'''blue-linked'''</span></big> | | colspan="2" | <big>'''''RoofStar Guarantee Standards''''' are <span style="color:#6495ed">'''blue-linked'''</span></big> |
Revision as of 20:47, 26 July 2021
RoofStar Guarantee Standards are blue-linked |
SBS Details
1 WORK INCLUDED
- (1) Supporting Deck Overlay
- If required by design authority.
- (2) Air or Vapour Control Layers
- If required by design authority
- (3) Insulation
- Mechanically fastened. See available insulation products in the Accepted Materials section of this Manual.
- (4) Insulation Overlay
- As required.
- (5) Primary Membrane and Membrane Protection
- (6) Compatible Mastic
- Use only the membrane manufacturer's approved sealant.
- (7) Sealant Pocket
- Minimum 100 mm (4") flange onto roof membrane. All corners, with the exception of one job-site formed double standing seam corner joint and adjoining lapped flange joining, shall be closed and soldered. Minimum height of gum pan to be 100 mm (4").
- (8) Membrane Flashing
- Onto primed metal flashing flange.
- (9) Packing
- To prevent displacement of compatible mastic.
- (10) Structural Sealant
- Use only the membrane manufacturers’ approved proprietary polyurethane based structural sealant.
- (11) Back-up Storm Collar
- To be installed whenever practical. Caulk at top of collar.
2 RELATED WORK BY OTHERS
- (A) Acceptable Supporting Deck Structure
- (B) Protrusion
- (C) Wood Blocking]]
NOTE: Refer to RoofStar Guarantee Standards for additional requirements.
- WARNING: DO NOT USE THIS DETAIL WITH HOT PIPES.
- AVOID THIS DETAIL: Wherever possible use Flanged Metal Stack Flashing or Curbed Opening (See 11.1.2.2 Curbs and Penetrations).
Back to RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies