Difference between revisions of "SBS Parapet (Typical)"
Difference between revisions of "SBS Parapet (Typical)"
Line 23: | Line 23: | ||
=== WORK INCLUDED === | === WORK INCLUDED === | ||
− | ;(1) [[ | + | ;(1) [[SBS Roof Systems Standard#SBSSUBSTRATES|'''Supporting Deck Overlay''']]: |
:If required by design authority. | :If required by design authority. | ||
− | ;(2) [[ | + | ;(2) [[SBS Roof Systems Standard#SBSAIRVAPOUR|'''Air or Vapour Control Layers''']]: |
:If required by design authority. | :If required by design authority. | ||
− | ;(3) [[ | + | ;(3) [[SBS Roof Systems Standard#SBSINSULATION|'''Insulation''']]: |
:See list of '''[[Section:C. Accepted Materials|Accepted Materials]]'''. | :See list of '''[[Section:C. Accepted Materials|Accepted Materials]]'''. | ||
− | ;(4) [[ | + | ;(4) [[SBS Roof Systems Standard#SBSINSULATIONOVERLAY|'''Insulation Overlay''']]: |
:As required. | :As required. | ||
− | ;(5) [[ | + | ;(5) [[SBS Roof Systems Standard#SBSBASE|'''Primary Membrane and Membrane Protection''']]: |
− | ;(6) [[ | + | ;(6) [[SBS Roof Systems Standard#SBS-STRIPPING|'''Membrane Flashing''']]: |
:Mechanically fasten to outside face of parapet blocking (D). At least one ply must extend over outside edge. | :Mechanically fasten to outside face of parapet blocking (D). At least one ply must extend over outside edge. | ||
− | ;(7) [[ | + | ;(7) [[SBS Roof Systems Standard#METALCAP-SBS|'''Metal Base Flashing''']]: |
:Optional on flexible membrane systems. Required on assemblies using gravel ballast filter mats. | :Optional on flexible membrane systems. Required on assemblies using gravel ballast filter mats. | ||
− | ;(8) [[ | + | ;(8) [[SBS Roof Systems Standard#METALCAP-SBS|'''Metal Cap Flashing''']]: |
:Flashings 1 and 2 may be one piece. Fasten with continuous concealed clip-type fasteners <b>or</b> cladding screws evenly spaced between seams. | :Flashings 1 and 2 may be one piece. Fasten with continuous concealed clip-type fasteners <b>or</b> cladding screws evenly spaced between seams. | ||
Line 43: | Line 43: | ||
=== RELATED WORK BY OTHERS === | === RELATED WORK BY OTHERS === | ||
− | ;(A) [[ | + | ;(A) [[SBS Roof Systems Standard#SBS-STEELDECK|'''Acceptable Supporting Steel Deck Structure''']] |
− | ;(B) [[ | + | ;(B) [[SBS Roof Systems Standard#SBSAIRVAPOUR|'''Air/Vapour Seal''']] |
− | ;(C) [[ | + | ;(C) [[SBS Roof Systems Standard#SBSWALLSUB|'''Acceptable Wall Surface''']] |
;(D) '''Wood Blocking''' | ;(D) '''Wood Blocking''' | ||
− | ;(E) [[ | + | ;(E) [[SBS Roof Systems Standard#SBSSLOPEDWOODBLOCKING|'''Sloped Wood Blocking''']] |
:Required over 100 mm (4") parapet width. | :Required over 100 mm (4") parapet width. | ||
</div><!-- COL-6-MD --> | </div><!-- COL-6-MD --> | ||
Line 59: | Line 59: | ||
− | [[ | + | [[SBS Roof Systems Standard |<i class="fa fa-chevron-circle-left fa" ></i> Back to ''RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies'']] |
− | [[SBS | + | [[SBS Roof System Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''SBS Modified Bitumen Construction Details'']] |
[[Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''Construction Details'']] | [[Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''Construction Details'']] |
Revision as of 14:27, 27 August 2021
RoofStar Guarantee Standards are blue-linked |
SBS Details
1 WORK INCLUDED
- (1) Supporting Deck Overlay
- If required by design authority.
- (2) Air or Vapour Control Layers
- If required by design authority.
- (3) Insulation
- See list of Accepted Materials.
- (4) Insulation Overlay
- As required.
- (5) Primary Membrane and Membrane Protection
- (6) Membrane Flashing
- Mechanically fasten to outside face of parapet blocking (D). At least one ply must extend over outside edge.
- (7) Metal Base Flashing
- Optional on flexible membrane systems. Required on assemblies using gravel ballast filter mats.
- (8) Metal Cap Flashing
- Flashings 1 and 2 may be one piece. Fasten with continuous concealed clip-type fasteners or cladding screws evenly spaced between seams.
2 RELATED WORK BY OTHERS
- (A) Acceptable Supporting Steel Deck Structure
- (B) Air/Vapour Seal
- (C) Acceptable Wall Surface
- (D) Wood Blocking
- (E) Sloped Wood Blocking
- Required over 100 mm (4") parapet width.
NOTE: Refer to RoofStar Guarantee Standards for additional requirements.
Back to RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies