<div class="col-md-6"> | <div class="col-md-6"> | ||
=== WORK INCLUDED === | === WORK INCLUDED === | ||
− | ;(1) [[ | + | ;(1) [[SBS Roof Systems Standard#SBSSUBSTRATES|'''Supporting Deck Overlay''']]: If required by design authority. |
− | ;(2) [[ | + | ;(2) [[SBS Roof Systems Standard#SBSAIRVAPOUR|'''Air or Vapour Control Layers''']]: If required by design authority. |
− | ;(3) [[ | + | ;(3) [[SBS Roof Systems Standard#SBSINSULATION|'''Insulation''']]: See available insulation products in the [[Roof Deck Insulation|'''Accepted Materials''']] section of this Manual. |
− | ;(4) [[ | + | ;(4) [[SBS Roof Systems Standard#SBSINSULATIONOVERLAY|'''Insulation Overlay''']]: Where required. |
− | ;(5) [[ | + | ;(5) [[SBS Roof Systems Standard#SBSBASE|'''Primary Membrane''']] and [[RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies#SBSPROTECTION| '''Membrane Protection''']] |
− | ;(6) [[ | + | ;(6) [[SBS Roof Systems Standard#SBS-STRIPPING|'''Membrane Flashing''']]: Lap over top and mechanically fasten. |
− | ;(7) [[ | + | ;(7) [[SBS Roof Systems Standard#METALCAP-SBS|'''Base Metal Flashing''']]: Mechanically fasten to top of wood blocking. Optional on flexible membrane systems. Required on assemblies using gravel ballast filter mats. |
− | ;(8) [[ | + | ;(8) [[SBS Roof Systems Standard#METALCAP-SBS|'''Metal Cap Flashing''']] |
:NOTE: (7) and (8) may be one piece. | :NOTE: (7) and (8) may be one piece. | ||
Line 28: | Line 28: | ||
=== RELATED WORK BY OTHERS === | === RELATED WORK BY OTHERS === | ||
− | ;(A) [[ | + | ;(A) [[SBS Roof Systems Standard#SBSDECKS|'''Acceptable Supporting Deck Structure''']] |
− | ;(B) [[ | + | ;(B) [[SBS Roof Systems Standard#SBSCONTROLJOINT|'''Control Joint Assembly''']]: Required to separate new systems from existing roof systems and at dissimilar roof decks or on BUR assemblies over 45 m x 45 m (150’ x 150’). Primed where applicable. Slope top if wider than 100 mm (4"). |
;(C) '''Existing Roof Assembly''': If applicable. Prepared for application of membrane flashing at control joint. | ;(C) '''Existing Roof Assembly''': If applicable. Prepared for application of membrane flashing at control joint. | ||
</div><!-- COL-6-MD --> | </div><!-- COL-6-MD --> | ||
Line 41: | Line 41: | ||
− | [[ | + | [[SBS Roof Systems Standard |<i class="fa fa-chevron-circle-left fa" ></i> Back to ''RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies'']] |
− | [[SBS | + | [[SBS Roof System Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''SBS Modified Bitumen Construction Details'']] |
− | |||
− |
Revision as of 14:40, 27 August 2021
RoofStar Guarantee Standards are blue-linked |
SBS Details
1 WORK INCLUDED
- (1) Supporting Deck Overlay
- If required by design authority.
- (2) Air or Vapour Control Layers
- If required by design authority.
- (3) Insulation
- See available insulation products in the Accepted Materials section of this Manual.
- (4) Insulation Overlay
- Where required.
- (5) Primary Membrane and Membrane Protection
- (6) Membrane Flashing
- Lap over top and mechanically fasten.
- (7) Base Metal Flashing
- Mechanically fasten to top of wood blocking. Optional on flexible membrane systems. Required on assemblies using gravel ballast filter mats.
- (8) Metal Cap Flashing
- NOTE: (7) and (8) may be one piece.
2 RELATED WORK BY OTHERS
- (A) Acceptable Supporting Deck Structure
- (B) Control Joint Assembly
- Required to separate new systems from existing roof systems and at dissimilar roof decks or on BUR assemblies over 45 m x 45 m (150’ x 150’). Primed where applicable. Slope top if wider than 100 mm (4").
- (C) Existing Roof Assembly
- If applicable. Prepared for application of membrane flashing at control joint.
NOTE: Refer to RoofStar Guarantee Standards for additional requirements.
Back to RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies