Difference between revisions of "SBS Open-wall Scupper Drain"
Difference between revisions of "SBS Open-wall Scupper Drain"
Line 1: | Line 1: | ||
{{Template:RPM Info}} | {{Template:RPM Info}} | ||
− | + | <hr> | |
{| class="wikitable" | style="color: black; background-color: orange; width: 100%;text-align:center" | {| class="wikitable" | style="color: black; background-color: orange; width: 100%;text-align:center" | ||
| colspan="2" | <big>'''''RoofStar Guarantee Standards''''' are <span style="color:#6495ed">'''blue-linked'''</span></big> | | colspan="2" | <big>'''''RoofStar Guarantee Standards''''' are <span style="color:#6495ed">'''blue-linked'''</span></big> | ||
Line 15: | Line 15: | ||
<div class="col-md-6"> | <div class="col-md-6"> | ||
=== WORK INCLUDED === | === WORK INCLUDED === | ||
− | ;(1) [[ | + | ;(1) [[SBS Roof Systems Standard#SBSAIRVAPOUR|'''Air or Vapour Control Layers''']]: If required by design authority. |
− | ;(2) [[ | + | ;(2) [[SBS Roof Systems Standard#SBSINSULATION|'''Insulation''']]: Mechanically fastened. See available insulation products in the [[Roof Deck Insulation|'''Accepted Materials''']] section of this Manual. |
− | ;(3) [[ | + | ;(3) [[SBS Roof Systems Standard#SBSINSULATIONOVERLAY|'''Insulation Overlay''']]: Where required. |
− | ;(4) [[ | + | ;(4) [[SBS Roof Systems Standard#SBSBASE|'''Primary Membrane''']] and [[RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies#SBSPROTECTION| '''Membrane Protection''']] |
− | ;(5) [[ | + | ;(5) [[SBS Roof Systems Standard#SBSSSCUPPERMATERIALS| '''Metal Scupper with Hopper''']]: The outside face of scupper to be 37.7mm (1½") <b><u>lower</u></b><u> </u>than the box height with a 12.7mm (½") drip edge. Installed in a thin bed of compatible mastic. Interface between outside wall and scupper should be caulked with appropriate sealant. Installed when wall finish is complete prior to completion of roofing or sheet metal (e.g.: re-roofing). |
;(6) '''Scupper Membrane Flashing''' | ;(6) '''Scupper Membrane Flashing''' | ||
;(7) '''Membrane Flashing''' | ;(7) '''Membrane Flashing''' | ||
− | ;(8) [[ | + | ;(8) [[SBS Roof Systems Standard#METALCAP-SBS|'''Base Metal Flashing''']]: Mechanically fastened. Optional on flexible membrane systems. Required on assemblies using gravel ballast filter mats. |
− | ;(9) [[ | + | ;(9) [[SBS Roof Systems Standard#METALCAP-SBS|'''Metal Cap Flashing''']]: Fasten with continuous concealed clip-type fasteners or cladding screws evenly spaced between seams. Flashing 8 and 9 may be one piece. |
<hr> | <hr> | ||
=== RELATED WORK BY OTHERS === | === RELATED WORK BY OTHERS === | ||
− | ;(A) [[ | + | ;(A) [[SBS Roof Systems Standard#SBSDECKS|'''Acceptable Supporting Deck Structure''']] |
;(B) '''Air / Vapour Seal''' | ;(B) '''Air / Vapour Seal''' | ||
;(C) '''Wood Blocking''' | ;(C) '''Wood Blocking''' | ||
− | ;(D) [[ | + | ;(D) [[SBS Roof Systems Standard#SBSWALLSUB|'''Acceptable Wall Surface - Plywood''']]: Conform to the requirements for Walls in '''2.6.2 Materials'''. |
− | ;(E) [[ | + | ;(E) [[SBS Roof Systems Standard#SBSWALLSUB|'''Wall Finish''']]: Interface between outside wall and scupper to be caulked with appropriate sealant. Installed by trade responsible for outside wall finish if roofing and metal flashing has been completed prior to exterior wall finish. |
</div><!-- COL-6-MD --> | </div><!-- COL-6-MD --> | ||
</div><!-- PANEL BODY --> | </div><!-- PANEL BODY --> | ||
Line 43: | Line 43: | ||
− | [[ | + | [[SBS Roof Systems Standard |<i class="fa fa-chevron-circle-left fa" ></i> Back to ''RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies'']] |
− | |||
− | |||
− | [[ | + | [[SBS Roof System Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''SBS Modified Bitumen Construction Details'']] |
Revision as of 15:50, 27 August 2021
RoofStar Guarantee Standards are blue-linked |
SBS Details
1 WORK INCLUDED
- (1) Air or Vapour Control Layers
- If required by design authority.
- (2) Insulation
- Mechanically fastened. See available insulation products in the Accepted Materials section of this Manual.
- (3) Insulation Overlay
- Where required.
- (4) Primary Membrane and Membrane Protection
- (5) Metal Scupper with Hopper
- The outside face of scupper to be 37.7mm (1½") lower than the box height with a 12.7mm (½") drip edge. Installed in a thin bed of compatible mastic. Interface between outside wall and scupper should be caulked with appropriate sealant. Installed when wall finish is complete prior to completion of roofing or sheet metal (e.g.: re-roofing).
- (6) Scupper Membrane Flashing
- (7) Membrane Flashing
- (8) Base Metal Flashing
- Mechanically fastened. Optional on flexible membrane systems. Required on assemblies using gravel ballast filter mats.
- (9) Metal Cap Flashing
- Fasten with continuous concealed clip-type fasteners or cladding screws evenly spaced between seams. Flashing 8 and 9 may be one piece.
2 RELATED WORK BY OTHERS
- (A) Acceptable Supporting Deck Structure
- (B) Air / Vapour Seal
- (C) Wood Blocking
- (D) Acceptable Wall Surface - Plywood
- Conform to the requirements for Walls in 2.6.2 Materials.
- (E) Wall Finish
- Interface between outside wall and scupper to be caulked with appropriate sealant. Installed by trade responsible for outside wall finish if roofing and metal flashing has been completed prior to exterior wall finish.
NOTE: Refer to RoofStar Guarantee Standards for additional requirements.