Difference between revisions of "SBS Fall Protection Anchor in Roof"
Difference between revisions of "SBS Fall Protection Anchor in Roof"
Line 11: | Line 11: | ||
<div class="col-md-6"> | <div class="col-md-6"> | ||
<div style="text-align:center; vertical-align:center"> | <div style="text-align:center; vertical-align:center"> | ||
− | [[File:10.3.7.1.jpg|class=img-responsive]] | + | [[File:10.3.7.1.jpg| link=http://rpm.rcabc.org/images/a/a0/10.3.7.1.jpg | class=img-responsive]] |
</div> | </div> | ||
</div><!-- COL-MD-6 --> | </div><!-- COL-MD-6 --> | ||
Line 39: | Line 39: | ||
<hr> | <hr> | ||
− | [[SBS Roof System Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''SBS | + | [[SBS Roof System Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''"SBS" Roof System Details'']] |
[[Main Page | <i class="fa fa-home fa"></i> Home]] | [[Main Page | <i class="fa fa-home fa"></i> Home]] | ||
{{Tempate:RPM Page Footer with Copyright and Current Date}} | {{Tempate:RPM Page Footer with Copyright and Current Date}} |
Revision as of 15:55, 30 August 2021
Notice to Reader | |
Images used in a Construction Detail are representative and not prescriptive. Nor are they necessarily drawn to scale. Rather, they are provided to visually convey the requirements of the Standard they represent. Unless otherwise required by the Standard, dimensions, the selection of materials and their application remains the responsibility of the Design Authority. The full text of the referenced requirements in the Standard may be read by using the blue hyperlinks |
SBS Details
1 WORK INCLUDED
- (1) Flashing
- 0.08 mm (0.032", 20 gauge) Aluminum or 0.56 mm (16 oz) copper to CSA B272-93 flashing supplied by anchor manufacturer with flanges sealed by roofer.
- (2) Flashing Flange
- minimum 100 mm (4") flange set in coating of compatible sealant.
- (3) Primary Membrane and Membrane Flashing.
- (4) Protected Membrane Roof Assembly
- Flashing to extend a minimum 200 mm (8") above finished roof surface (pavers, ballast, or walkways). See [[SBS Roof Systems Standard#SBSPMRAMEMBRANE | 12.1.3.2 Membranes for specific Application requirements.
- (5) Conventional Roof Assembly
- Flashing to extend a minimum 200 mm (8") above finished roof surface. See membrane flashing requirements under 10.3 Application.
- (6) Insulation
- See available insulation products in the Accepted Materials section of this Manual.
2 WORK BY OTHERS
- (A) Acceptable Supporting Deck Structure
- Concrete slab shown, see anchor manufacturer's attachment details for other deck types.
- (B) Roof Anchor
- Anchor selection and attachment details are the responsibility of the Design Authority
- (C) Anchor Eye
- (D) Water Tight Cap
NOTE: See the Standard for additional requirements.
Back to "SBS" Roof System Details
© RCABC 2024
RoofStarTM is a registered Trademark of the RCABC.
No reproduction of this material, in whole or in part, is lawful without the expressed permission of the RCABC Guarantee Corp.