Difference between revisions of "SBS Expansion Joint (Wall)"
Difference between revisions of "SBS Expansion Joint (Wall)"
Line 23: | Line 23: | ||
<div class="col-md-6"> | <div class="col-md-6"> | ||
=== WORK INCLUDED === | === WORK INCLUDED === | ||
− | ;(1) [[SBS Roof Systems Standard# | + | ;(1) [[SBS Roof Systems Standard#PART_6|'''Air or Vapour Control Layers''']]: The requirement for a vapour retarder is determined by the design authority. Optional terminations. |
− | ;(2) [[SBS Roof Systems Standard# | + | ;(2) [[SBS Roof Systems Standard#PART_7|'''Insulation''']] |
− | ;(3) [[SBS Roof Systems Standard# | + | ;(3) [[SBS Roof Systems Standard#PART_8|'''Insulation Overlay''']]: Where required. |
− | ;(4) [[SBS Roof Systems Standard# | + | ;(4) [[SBS Roof Systems Standard#PART_9|'''Primary Membrane''']] and [[SBS Roof Systems Standard#SBSPROTECTION| '''Membrane Protection''']] |
− | ;(5) [[SBS Roof Systems Standard# | + | ;(5) [[SBS Roof Systems Standard#PART_10|'''Membrane Flashing''']]: Mechanically fasten to top of wood blocking. |
− | ;(6) [[SBS Roof Systems Standard# | + | ;(6) [[SBS Roof Systems Standard#PART_13|'''Membrane Counter-flashing''']]: Flashing sealed to wall with compatible mastic. |
− | ;(7) [[SBS Roof Systems Standard# | + | ;(7) [[SBS Roof Systems Standard#PART_13|'''Metal Base Flashing''']]: Mechanically fasten to top of wood blocking (C). Optional on flexible membrane systems. Required on assemblies using gravel ballast filter mats. |
− | ;(8) [[SBS Roof Systems Standard# | + | ;(8) [[SBS Roof Systems Standard#PART_13|'''Metal Counter-flashing''']]: Into reglet approximately 30 mm (1¼") and caulked. |
;(9) <b>Caulking</b> | ;(9) <b>Caulking</b> | ||
− | ;(10) [[SBS Roof Systems Standard# | + | ;(10) [[SBS Roof Systems Standard#PART_10|'''Membrane Underlay''']]: Minimum self-adhered modified bitumen membrane. |
− | ;(11) [[SBS Roof Systems Standard# | + | ;(11) [[SBS Roof Systems Standard#PART_13|'''Metal Cap Flashing''']]: Must overlap exterior wall finish. Fasten with continuous concealed clip-type fasteners or cladding screws evenly spaced between seams. |
<hr> | <hr> | ||
=== RELATED WORK BY OTHERS === | === RELATED WORK BY OTHERS === | ||
− | ;(A) [[SBS Roof Systems Standard# | + | ;(A) [[SBS Roof Systems Standard#PART_2|'''Acceptable Supporting Deck Structure''']] |
− | ;(B) [[SBS Roof Systems Standard# | + | ;(B) [[SBS Roof Systems Standard#PART_6|'''Air and Vapour Control Layer Seal''']]: Sealed to wall. |
;(C) '''Wood Blocking''': Height to provide minimum 200 mm (8") above completed roof system, slope top edge. | ;(C) '''Wood Blocking''': Height to provide minimum 200 mm (8") above completed roof system, slope top edge. | ||
;(D) '''Flexible Insulation''' | ;(D) '''Flexible Insulation''' | ||
− | ;(E) [[SBS Roof Systems Standard# | + | ;(E) [[SBS Roof Systems Standard#PART_10|'''Reglet''']]: |
− | ;(F) [[SBS Roof Systems Standard# | + | ;(F) [[SBS Roof Systems Standard#PART_10|'''Sloped Wood Blocking''']]: |
</div><!-- COL-6-MD --> | </div><!-- COL-6-MD --> | ||
</div><!-- PANEL BODY --> | </div><!-- PANEL BODY --> |
Revision as of 14:46, 1 September 2021
Notice to Reader | |
Images used in a Construction Detail are representative and not prescriptive. Nor are they necessarily drawn to scale. Rather, they are provided to visually convey the requirements of the Standard they represent. Unless otherwise required by the Standard, dimensions, the selection of materials and their application remains the responsibility of the Design Authority. The full text of the referenced requirements in the Standard may be read by using the blue hyperlinks |
SBS Details
1 WORK INCLUDED
- (1) Air or Vapour Control Layers
- The requirement for a vapour retarder is determined by the design authority. Optional terminations.
- (2) Insulation
- (3) Insulation Overlay
- Where required.
- (4) Primary Membrane and Membrane Protection
- (5) Membrane Flashing
- Mechanically fasten to top of wood blocking.
- (6) Membrane Counter-flashing
- Flashing sealed to wall with compatible mastic.
- (7) Metal Base Flashing
- Mechanically fasten to top of wood blocking (C). Optional on flexible membrane systems. Required on assemblies using gravel ballast filter mats.
- (8) Metal Counter-flashing
- Into reglet approximately 30 mm (1¼") and caulked.
- (9) Caulking
- (10) Membrane Underlay
- Minimum self-adhered modified bitumen membrane.
- (11) Metal Cap Flashing
- Must overlap exterior wall finish. Fasten with continuous concealed clip-type fasteners or cladding screws evenly spaced between seams.
2 RELATED WORK BY OTHERS
- (A) Acceptable Supporting Deck Structure
- (B) Air and Vapour Control Layer Seal
- Sealed to wall.
- (C) Wood Blocking
- Height to provide minimum 200 mm (8") above completed roof system, slope top edge.
- (D) Flexible Insulation
- (E) Reglet
- (F) Sloped Wood Blocking
NOTE: See the Standard for additional requirements.
Back to "SBS" Roof System Details