=== WORK INCLUDED ===
 
=== WORK INCLUDED ===
;(1) [[SBS Roof Systems Standard#SBSCONVENTIONAL|'''Conventional Roof Assembly''']]
+
;(1) [[SBS Roof Systems Standard#PART_1|'''Conventional Roof Assembly''']]
;(2) [[SBS Roof Systems Standard#METALCAP-SBS|'''Metal Counter-flashing''']]
+
;(2) [[SBS Roof Systems Standard#PART_13|'''Metal Counter-flashing''']]
;(3) [[SBS Roof Systems Standard#SBSINSULATION|'''Insulation''']]: See available insulation products in the [[Roof Deck Insulation|'''Accepted Materials''']] section of this Manual.
+
;(3) [[SBS Roof Systems Standard#PART_7|'''Insulation''']]: See available insulation products in Division C of this ''Manual''.
;(4) [[SBS Roof Systems Standard#SBSBASE|'''Primary Membrane''']] and [[RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies#SBS-STRIPPING|'''Membrane Flashing''']].
+
;(4) [[SBS Roof Systems Standard#PART_9|'''Primary Membrane''']] and [[RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies#SBS-STRIPPING|'''Membrane Flashing''']].
  
 
<hr>
 
<hr>
  
 
=== RELATED WORK BY OTHERS ===
 
=== RELATED WORK BY OTHERS ===
;(A) [[SBS Roof Systems Standard#SBSDECKS|'''Acceptable Deck''']]:
+
;(A) [[SBS Roof Systems Standard#PART_2|'''Acceptable Deck''']]:
;(B) '''Wall Anchor''': Anchor selection and attachment details are the responsibility of the Design Authority
+
;(B) '''Wall Anchor''': Anchor selection and attachment details are the responsibility of the ''Design Authority''.
 
;(C) '''Anchor Eye'''
 
;(C) '''Anchor Eye'''
 
;(D) '''Anchor Placement''': Minimum 200 mm (8") above finished roof surface.
 
;(D) '''Anchor Placement''': Minimum 200 mm (8") above finished roof surface.

Revision as of 21:51, 1 September 2021


Notice to Reader
Images used in a Construction Detail are representative and not prescriptive. Nor are they necessarily drawn to scale. Rather, they are provided to visually convey the requirements of the Standard they represent. Unless otherwise required by the Standard, dimensions, the selection of materials and their application remains the responsibility of the Design Authority.

The full text of the referenced requirements in the Standard may be read by using the blue hyperlinks
SBS Details

10.3.7.2.jpg

1 WORK INCLUDED

(1) Conventional Roof Assembly
(2) Metal Counter-flashing
(3) Insulation
See available insulation products in Division C of this Manual.
(4) Primary Membrane and Membrane Flashing.

2 RELATED WORK BY OTHERS

(A) Acceptable Deck
(B) Wall Anchor
Anchor selection and attachment details are the responsibility of the Design Authority.
(C) Anchor Eye
(D) Anchor Placement
Minimum 200 mm (8") above finished roof surface.
(E) Plywood
15.9 mm (5/8") treated where required.

NOTE: See the Standard for additional requirements.