Difference between revisions of "CS Details:E3.7.3 (Hip & Ridge Caps)"

Jump to: navigation, search

Difference between revisions of "CS Details:E3.7.3 (Hip & Ridge Caps)"

 
(4 intermediate revisions by the same user not shown)
Line 1: Line 1:
 +
{{Template:RPM Info}}
 +
 +
{{DISPLAYTITLE:<span style="position: absolute; clip: rect(1px 1px 1px 1px); clip: rect(1px, 1px, 1px, 1px);">{{FULLPAGENAME}}</span>}}
 +
__NOTOC__
 +
 +
<big><big>Division D - Construction Details</big></big>
 +
<hr>
 +
<big><big><big><big><big>CS Details:E3.7.3 (Hip & Ridge Caps)</big></big></big></big></big>
 
{| class="wikitable" | style="color: black; background-color: orange; width: 100%;text-align:center"
 
{| class="wikitable" | style="color: black; background-color: orange; width: 100%;text-align:center"
| colspan="2"  | <big>'''''RoofStar Guarantee Standards''''' are <span style="color:#6495ed">'''blue-linked'''</span></big>
+
| colspan="2"  | <big>'''''Notice to Reader'''''</big>
 +
|-
 +
| style="color: black; background-color: #ffffcc; width: 100%;text-align:center" | Images used in a Construction Detail are representative and not prescriptive.  Nor are they necessarily drawn to scale. Rather, they are provided to visually convey the requirements of the Standard they represent. Unless otherwise required by the Standard, dimensions, the selection of materials and their application remains the responsibility of the ''Design Authority''.<br><br>The full text of the referenced requirements in the [[Cedar Shake & Shingle Systems Standard | '''Standard''']] may be read by using the <span style="color:#6495ed">'''blue hyperlinks'''</span>
 
|}
 
|}
 
<div class="panel panel-success">
 
<div class="panel panel-success">
Line 7: Line 17:
 
<div class="col-md-6">
 
<div class="col-md-6">
 
<div style="text-align:center; vertical-align:center">
 
<div style="text-align:center; vertical-align:center">
[[File:7.2.4.2.jpg|class=img-responsive]]
+
[[File:7.2.4.2.jpg| link=http://rpm.rcabc.org/images/6/6c/7.2.4.2.jpg | class=img-responsive]]
 
</div>
 
</div>
 
</div><!-- COL-MD-6 -->
 
</div><!-- COL-MD-6 -->
Line 14: Line 24:
 
=== WORK INCLUDED ===
 
=== WORK INCLUDED ===
  
(1) [[RoofStar Guarantee Standards for Cedar Shakes %26 Shingles Roof Assemblies#STR-CSEAVE| '''Interrlay''']]: Minimum No. 15 asphalt saturated felt not less than 450 mm (18") shall be laid between courses of cedar shakes starting from a distance equal to double the weather exposure from the butt. On open sheathing top edge of interlay must rest on and be secured to the strapping.
+
(1) [[Cedar Shake & Shingle Systems Standard#STR-CSEAVE| '''Interrlay''']]: Minimum No. 15 asphalt saturated felt not less than 450 mm (18") shall be laid between courses of cedar shakes starting from a distance equal to double the weather exposure from the butt. On open sheathing top edge of interlay must rest on and be secured to the strapping.
  
 
(2) <b>Final Course</b>: Trim final course to top point of ridge or hip.
 
(2) <b>Final Course</b>: Trim final course to top point of ridge or hip.
Line 20: Line 30:
 
(3) <b>Ridge Underlay</b>: A strip of minimum No. 15 asphalt saturated felt prior to capping.
 
(3) <b>Ridge Underlay</b>: A strip of minimum No. 15 asphalt saturated felt prior to capping.
  
(4) [[RoofStar Guarantee Standards for Cedar Shakes %26 Shingles Roof Assemblies#STR-CSHIP| '''Ridge Caps''']]: Optional locations for second nail. All ridges and hips shall be of the alternate overlap type and at the same exposure as the field of the roof. Each side shall be fastened with 2 nails not in the same line of grain (staggered). Nails should be longer than the field nails and long enough to penetrate the sheathing a minimum of 20 mm (3/4") or in the case of plywood, completely through the sheathing, <b>OR</b> 1 nail per side and an additional nail through the butt end edge at peak of ridge caps (staples alone are not sufficient).
+
(4) [[Cedar Shake & Shingle Systems Standard#STR-CSHIP| '''Ridge Caps''']]: Optional locations for second nail. All ridges and hips shall be of the alternate overlap type and at the same exposure as the field of the roof. Each side shall be fastened with 2 nails not in the same line of grain (staggered). Nails should be longer than the field nails and long enough to penetrate the sheathing a minimum of 20 mm (3/4") or in the case of plywood, completely through the sheathing, <b>OR</b> 1 nail per side and an additional nail through the butt end edge at peak of ridge caps (staples alone are not sufficient).
  
 
=== RELATED WORK BY OTHERS ===
 
=== RELATED WORK BY OTHERS ===
Line 28: Line 38:
 
</div><!-- PANEL -->
 
</div><!-- PANEL -->
  
<b>NOTE: </b>• Refer to '''''RoofStar Guarantee Standards''''' for additional requirements.
+
'''NOTE''': See the [[Cedar Shake & Shingle Systems Standard | '''Standard''']] for additional requirements.
  
 
<hr>
 
<hr>
  
 +
[[Cedar Shake & Shingle System Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''Cedar Shake and Shingle System Details'']]
  
[[RoofStar Guarantee Standards for Cedar Shakes & Shingles Roof Assemblies|<i class="fa fa-chevron-circle-left fa" ></i> RoofStar Guarantee Standards for Cedar Shakes & Shingles Roof Assemblies]]
+
[[Main Page | <i class="fa fa-home fa"></i> Home]]
 
 
[[Cedar Shakes & Shingles Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''Cedar Shakes & Shingles Construction Details'']]
 
  
[[Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''Construction Details'']]
+
{{Tempate:RPM Page Footer with Copyright and Current Date}}

Latest revision as of 21:06, 7 September 2021



Division D - Construction Details


CS Details:E3.7.3 (Hip & Ridge Caps)

Notice to Reader
Images used in a Construction Detail are representative and not prescriptive. Nor are they necessarily drawn to scale. Rather, they are provided to visually convey the requirements of the Standard they represent. Unless otherwise required by the Standard, dimensions, the selection of materials and their application remains the responsibility of the Design Authority.

The full text of the referenced requirements in the Standard may be read by using the blue hyperlinks
Cedar Shakes & Shingles Details

7.2.4.2.jpg

1 WORK INCLUDED

(1) Interrlay: Minimum No. 15 asphalt saturated felt not less than 450 mm (18") shall be laid between courses of cedar shakes starting from a distance equal to double the weather exposure from the butt. On open sheathing top edge of interlay must rest on and be secured to the strapping.

(2) Final Course: Trim final course to top point of ridge or hip.

(3) Ridge Underlay: A strip of minimum No. 15 asphalt saturated felt prior to capping.

(4) Ridge Caps: Optional locations for second nail. All ridges and hips shall be of the alternate overlap type and at the same exposure as the field of the roof. Each side shall be fastened with 2 nails not in the same line of grain (staggered). Nails should be longer than the field nails and long enough to penetrate the sheathing a minimum of 20 mm (3/4") or in the case of plywood, completely through the sheathing, OR 1 nail per side and an additional nail through the butt end edge at peak of ridge caps (staples alone are not sufficient).

2 RELATED WORK BY OTHERS

(A) Sheathing: Minimum 19 mm x 89 mm (1" x 4") boards spaced to match exposure of shakes or shingles, though minimum 19 mm x 140 mm (1" x 6") boards are mandatory for 24" shakes. Solid sheathing is also acceptable.

NOTE: See the Standard for additional requirements.


Back to Cedar Shake and Shingle System Details

Home

© RCABC 2024
RoofStarTM is a registered Trademark of the RCABC.
No reproduction of this material, in whole or in part, is lawful without the expressed permission of the RCABC Guarantee Corp.