Difference between revisions of "TS Details:E4.7.4 (Tile - Roof/Wall Transition)"

Jump to: navigation, search

Difference between revisions of "TS Details:E4.7.4 (Tile - Roof/Wall Transition)"

(Created page with "<hr> Flashings bridge the gap between field areas and any protrusions such as pipes, vents, and adjoining walls. Because these items impede the flow of water, small deficienci...")
 
 
(7 intermediate revisions by the same user not shown)
Line 1: Line 1:
 +
{{Template:RPM Info}}
 +
 +
{{DISPLAYTITLE:<span style="position: absolute; clip: rect(1px 1px 1px 1px); clip: rect(1px, 1px, 1px, 1px);">{{FULLPAGENAME}}</span>}}
 +
__NOTOC__
 +
 +
<big><big>Division D - Construction Details</big></big>
 
<hr>
 
<hr>
Flashings bridge the gap between field areas and any protrusions such as pipes, vents, and adjoining walls. Because these items impede the flow of water, small deficiencies can cause high amounts of water to enter the building. Proper detail work will make the difference between a successful or problematic roof.Flashing for a wall termination should lap the tile by a minimum of 100 mm (4"). Material should be the 26 ga. prepainted galvanized with S locks or standing seams to join lengths.
+
<big><big><big><big><big>TS Details:E4.7.4 (Tile - Roof/Wall Transition)</big></big></big></big></big>
 +
{| class="wikitable" | style="color: black; background-color: orange; width: 100%;text-align:center"
 +
| colspan="2"  | <big>'''''Notice to Reader'''''</big>
 +
|-
 +
| style="color: black; background-color: #ffffcc; width: 100%;text-align:center" | Images used in a Construction Detail are representative and not prescriptive.  Nor are they necessarily drawn to scale. Rather, they are provided to visually convey the requirements of the Standard they represent. Unless otherwise required by the Standard, dimensions, the selection of materials and their application remains the responsibility of the ''Design Authority''.<br><br>The full text of the referenced requirements in the [[Tile Systems Standard | '''Standard''']] may be read by using the <span style="color:#6495ed">'''blue hyperlinks'''</span>
 +
|}
  
[[File:7.3.2.2.16.jpg]]
+
<div class="panel panel-success">
 +
<div class="panel-heading"><big>'''Tile Roofing Details'''</big></div>
 +
<div class="panel-body">
 +
<div class="col-md-6">
 +
<div style="text-align:center; vertical-align:center">
 +
[[File:7.3.2.2.16.jpg| link=http://rpm.rcabc.org/images/8/8d/7.3.2.2.16.jpg | class=img-responsive]]
 +
</div>
 +
</div><!-- COL-MD-6 -->
  
A mortar or mastic bedding should be applied to the tops of the concrete tile before flashing to prevent wind blown rain or vermin from entering.
+
<div class="col-md-6">
 +
=== WORK INCLUDED ===
 +
;(1) Linear metal flashings: ''Linear metal flashings'' bridge the gap between field areas and any protrusions such as pipes, vents, and adjoining walls. Because these items impede the flow of water, small deficiencies can cause high amounts of water to enter the building. Proper detail work will make the difference between a successful or problematic roof.Flashing for a wall termination should lap the tile by a minimum of 100 mm (4"). Material should be the 26-Ga. pre-painted galvanized with S locks or standing seams to join lengths.
 +
;(2) Mortar or mastic: A mortar or mastic bedding should be applied to the tops of the concrete tile before flashing to prevent wind blown rain or vermin from entering.
  
<hr>
+
</div><!-- COL-6-MD -->
 +
</div><!-- PANEL BODY -->
 +
</div><!-- PANEL -->
  
 +
'''NOTE''': See the [[Tile Systems Standard | '''Standard''']] for additional requirements.
  
 +
<hr>
  
[[Section:E. Application: Steep Slope Roofs|<i class="fa fa-chevron-circle-left fa-2x" ></i> Back to ''Slate Application'']]
+
[[Tile System Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''Tile System Details'']]
  
[[Tile and Slate Construction Details|<i class="fa fa-chevron-circle-left fa-2x" ></i> Back to ''Tile and Slate Construction Details'']]
+
[[Main Page | <i class="fa fa-home fa"></i> Home]]
  
[[Section:G. Construction Details|<i class="fa fa-chevron-circle-left fa-2x" ></i> Back to ''Construction Details'']]
+
{{Tempate:RPM Page Footer with Copyright and Current Date}}

Latest revision as of 21:08, 7 September 2021



Division D - Construction Details


TS Details:E4.7.4 (Tile - Roof/Wall Transition)

Notice to Reader
Images used in a Construction Detail are representative and not prescriptive. Nor are they necessarily drawn to scale. Rather, they are provided to visually convey the requirements of the Standard they represent. Unless otherwise required by the Standard, dimensions, the selection of materials and their application remains the responsibility of the Design Authority.

The full text of the referenced requirements in the Standard may be read by using the blue hyperlinks
Tile Roofing Details

7.3.2.2.16.jpg

1 WORK INCLUDED

(1) Linear metal flashings
Linear metal flashings bridge the gap between field areas and any protrusions such as pipes, vents, and adjoining walls. Because these items impede the flow of water, small deficiencies can cause high amounts of water to enter the building. Proper detail work will make the difference between a successful or problematic roof.Flashing for a wall termination should lap the tile by a minimum of 100 mm (4"). Material should be the 26-Ga. pre-painted galvanized with S locks or standing seams to join lengths.
(2) Mortar or mastic
A mortar or mastic bedding should be applied to the tops of the concrete tile before flashing to prevent wind blown rain or vermin from entering.

NOTE: See the Standard for additional requirements.


Back to Tile System Details

Home

© RCABC 2024
RoofStarTM is a registered Trademark of the RCABC.
No reproduction of this material, in whole or in part, is lawful without the expressed permission of the RCABC Guarantee Corp.