Difference between revisions of "TS Details:E4.7.9 (Slate - Hips)"
Difference between revisions of "TS Details:E4.7.9 (Slate - Hips)"
(Created page with "<hr> Hips on a slate roof can be either mitred, saddled or have a metal flashing. Saddled hips require a lathe nailer on both sides thick enough to support the hip tiles from...") |
|||
(6 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
+ | {{Template:RPM Info}} | ||
+ | |||
+ | {{DISPLAYTITLE:<span style="position: absolute; clip: rect(1px 1px 1px 1px); clip: rect(1px, 1px, 1px, 1px);">{{FULLPAGENAME}}</span>}} | ||
+ | __NOTOC__ | ||
+ | |||
+ | <big><big>Division D - Construction Details</big></big> | ||
<hr> | <hr> | ||
+ | <big><big><big><big><big> TS Details:E4.7.9 (Slate - Hips)</big></big></big></big></big> | ||
+ | {| class="wikitable" | style="color: black; background-color: orange; width: 100%;text-align:center" | ||
+ | | colspan="2" | <big>'''''Notice to Reader'''''</big> | ||
+ | |- | ||
+ | | style="color: black; background-color: #ffffcc; width: 100%;text-align:center" | Images used in a Construction Detail are representative and not prescriptive. Nor are they necessarily drawn to scale. Rather, they are provided to visually convey the requirements of the Standard they represent. Unless otherwise required by the Standard, dimensions, the selection of materials and their application remains the responsibility of the ''Design Authority''.<br><br>The full text of the referenced requirements in the [[Slate Systems Standard | '''Standard''']] may be read by using the <span style="color:#6495ed">'''blue hyperlinks'''</span> | ||
+ | |} | ||
+ | |||
+ | <div class="panel panel-success"> | ||
+ | <div class="panel-heading"><big>'''Slate Roofing Details'''</big></div> | ||
+ | <div class="panel-body"> | ||
+ | <div class="col-md-6"> | ||
+ | <div style="text-align:center; vertical-align:center"> | ||
+ | [[File:7.4.1.2.6.jpg| link=http://rpm.rcabc.org/images/9/93/7.4.1.2.6.jpg | class=img-responsive]] | ||
+ | |||
+ | [[File:7.4.1.2.7.jpg| link=http://rpm.rcabc.org/images/6/62/7.4.1.2.7.jpg | class=img-responsive]] | ||
+ | </div> | ||
+ | </div><!-- COL-MD-6 --> | ||
+ | |||
+ | <div class="col-md-6"> | ||
+ | |||
Hips on a slate roof can be either mitred, saddled or have a metal flashing. | Hips on a slate roof can be either mitred, saddled or have a metal flashing. | ||
Saddled hips require a lathe nailer on both sides thick enough to support the hip tiles from the field tiles. The width should allow nailing and keep a 75 mm (3") lap over field tiles. Nail heads should be covered with elastic cement between successive tiles. | Saddled hips require a lathe nailer on both sides thick enough to support the hip tiles from the field tiles. The width should allow nailing and keep a 75 mm (3") lap over field tiles. Nail heads should be covered with elastic cement between successive tiles. | ||
− | |||
− | |||
On mitred hips, field slates are cut flush at the apex to match slates on the other side. The unexposed portion of these slates is covered with a metal flashing which should extend 50 mm up from the tiles being covered. | On mitred hips, field slates are cut flush at the apex to match slates on the other side. The unexposed portion of these slates is covered with a metal flashing which should extend 50 mm up from the tiles being covered. | ||
+ | </div><!-- COL-6-MD --> | ||
+ | </div><!-- PANEL BODY --> | ||
+ | </div><!-- PANEL --> | ||
− | [[ | + | '''NOTE''': See the [[Slate Systems Standard | '''Standard''']] for additional requirements. |
<hr> | <hr> | ||
+ | [[Slate System Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''Slate System Details'']] | ||
+ | [[Main Page | <i class="fa fa-home fa"></i> Home]] | ||
− | + | {{Tempate:RPM Page Footer with Copyright and Current Date}} | |
− | |||
− | |||
− | |||
− |
Latest revision as of 21:10, 7 September 2021
Division D - Construction Details
TS Details:E4.7.9 (Slate - Hips)
Notice to Reader | |
Images used in a Construction Detail are representative and not prescriptive. Nor are they necessarily drawn to scale. Rather, they are provided to visually convey the requirements of the Standard they represent. Unless otherwise required by the Standard, dimensions, the selection of materials and their application remains the responsibility of the Design Authority. The full text of the referenced requirements in the Standard may be read by using the blue hyperlinks |
Hips on a slate roof can be either mitred, saddled or have a metal flashing.
Saddled hips require a lathe nailer on both sides thick enough to support the hip tiles from the field tiles. The width should allow nailing and keep a 75 mm (3") lap over field tiles. Nail heads should be covered with elastic cement between successive tiles.
On mitred hips, field slates are cut flush at the apex to match slates on the other side. The unexposed portion of these slates is covered with a metal flashing which should extend 50 mm up from the tiles being covered.
NOTE: See the Standard for additional requirements.
© RCABC 2024
RoofStarTM is a registered Trademark of the RCABC.
No reproduction of this material, in whole or in part, is lawful without the expressed permission of the RCABC Guarantee Corp.