Difference between revisions of "ASM Valley (Hooked)"
Difference between revisions of "ASM Valley (Hooked)"
Line 1: | Line 1: | ||
+ | <hr> | ||
[[File:8.1.4.5.1.jpg]] | [[File:8.1.4.5.1.jpg]] | ||
Line 32: | Line 33: | ||
+ | |||
+ | |||
+ | [[Section:E. Application: Steep Slope Roofs|<i class="fa fa-chevron-circle-left fa-2x" ></i> Back to ''ASM Application'']] | ||
+ | |||
+ | [[Architectural Sheet Metal Construction Details|<i class="fa fa-chevron-circle-left fa-2x" ></i> Back to ''ASM Construction Details'']] | ||
[[Section:G. Construction Details|<i class="fa fa-chevron-circle-left fa-2x" ></i> Back to ''Construction Details'']] | [[Section:G. Construction Details|<i class="fa fa-chevron-circle-left fa-2x" ></i> Back to ''Construction Details'']] |
Revision as of 22:43, 21 December 2015
1 WORK INCLUDED
(1) Valley Protection Membrane: Accepted self-adhered modified bituminous eave protection membrane.
(2) Underlayment: The type of underlay required is determined by roof slope (see Section 8.1.4.1 and Section 8.1.4.2).
(3) Slip Sheet: Recommended over asphaltic underlays and / or as required by metal roof panel manufacturer.
(4) Valley Metal Panel: Preformed with centre rib and built-in continuous lock.
(5) Fastening: Metal valley panels to be secured with compatible, non-corrosive, flat head fasteners 200 mm (8") o/c. Metal roof panel to metal valley panel overlap must be a minimum of 125 mm (5").
(6) Membrane Strip-In: Accepted self-adhered modified bituminous eave protection membrane.
(7) Architectural Metal Roof Panel
(8) Continuous Built-In Hook Strip
(9) Valley Panel Overlap : Set in two continuous rows of accepted caulking or sealant tape.
2 RELATED WORK BY OTHERS
(A) Acceptable Deck
NOTE: * Refer to RGC Guarantee Standards for additional requirements.