Difference between revisions of "All Standards:MATERIALS"
Difference between revisions of "All Standards:MATERIALS"
(Created page with "Materials to be covered by the Guarantee Program must be acceptable to RGC. A listing is published in the RCABC Roofing Practices Manual, Section ('''''Reference needed''''')....") |
|||
Line 14: | Line 14: | ||
* that are installed, but susceptible to moisture damage, must be made watertight by the end of each work day. | * that are installed, but susceptible to moisture damage, must be made watertight by the end of each work day. | ||
* must be supplied or accepted by the membrane manufacturer. | * must be supplied or accepted by the membrane manufacturer. | ||
+ | |||
+ | |||
+ | |||
+ | |||
+ | [[RoofStar Guarantee Standards for SBS Roof Systems|<i class="fa fa-chevron-circle-left fa-2x" ></i> Back to ''RoofStar Guarantee Standards for SBS Roof Systems'']] |
Latest revision as of 16:09, 6 January 2016
Materials to be covered by the Guarantee Program must be acceptable to RGC. A listing is published in the RCABC Roofing Practices Manual, Section (Reference needed).
All materials must be protected from weather by properly stacking above ground or roof surface and in factory packaging or other adequate covering until applied. All installed roofing materials that are susceptible to moisture damage must be made watertight by the end of each work day.
All roofing components must be supplied or accepted by the membrane manufacturer. See manufacturer component listings. (Sections reference here)
SUGGESTED REVISION:
Materials to be covered by the Guarantee Program must be acceptable to RGC. A listing is published in the RCABC Roofing Practices Manual, Section C. See also below in this Section, D1.4.
Materials covered by the Guarantee Program
- that are on site but uninstalled must be protected from weather by properly stacking above ground or roof surface and in factory packaging or other adequate covering until applied.
- that are installed, but susceptible to moisture damage, must be made watertight by the end of each work day.
- must be supplied or accepted by the membrane manufacturer.