Difference between revisions of "SBS Fall Protection Anchor in Wall"
Difference between revisions of "SBS Fall Protection Anchor in Wall"
m (James Klassen moved page SBS 11.3.5-2 Roof Anchors (conventional system) to SBS Fall Protection Anchor in Wall) |
|||
(7 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
{{Template:RPM Info}} | {{Template:RPM Info}} | ||
+ | |||
+ | {{DISPLAYTITLE:<span style="position: absolute; clip: rect(1px 1px 1px 1px); clip: rect(1px, 1px, 1px, 1px);">{{FULLPAGENAME}}</span>}} | ||
+ | __NOTOC__ | ||
+ | |||
+ | <big><big>Division D - Construction Details</big></big> | ||
<hr> | <hr> | ||
− | + | <big><big><big><big><big>SBS | Fall Protection Anchor in Wall ([[SBS_Roof_Systems_Standard#12.3.2.1._General_Requirements_for_Flashing_Penetrations | Article 12.3.2.1.]])</big></big></big></big></big> | |
− | + | {{Template:Construction Details Header}} | |
− | | | ||
− | |||
− | |||
<div class="panel panel-success"> | <div class="panel panel-success"> | ||
<div class="panel-heading"><big>'''SBS Details'''</big></div> | <div class="panel-heading"><big>'''SBS Details'''</big></div> | ||
Line 20: | Line 22: | ||
;(2) [[SBS Roof Systems Standard#PART_13|'''Metal Counter-flashing''']] | ;(2) [[SBS Roof Systems Standard#PART_13|'''Metal Counter-flashing''']] | ||
;(3) [[SBS Roof Systems Standard#PART_7|'''Insulation''']]: See available insulation products in Division C of this ''Manual''. | ;(3) [[SBS Roof Systems Standard#PART_7|'''Insulation''']]: See available insulation products in Division C of this ''Manual''. | ||
− | ;(4) [[SBS Roof Systems Standard#PART_9|'''Primary Membrane''']] and [[ | + | ;(4) [[SBS Roof Systems Standard#PART_9|'''Primary Membrane''']] and [[SBS Roof Systems Standard#PART_10|'''Membrane Flashing''']]. |
<hr> | <hr> |
Latest revision as of 18:33, 27 June 2022
Division D - Construction Details
SBS | Fall Protection Anchor in Wall ( Article 12.3.2.1.)
Notice to Reader | |
Images used in a Construction Detail are representative and not prescriptive, and are not necessarily drawn to scale. They are intended to support the related Standard (Ref. Division A, Article 2.2.1.2.).
The reader may link to the related Article in the detail title, or link to the Standard as it relates to a specific element in the detail. All hyperlinks are displayed blue text. |
SBS Details
1 WORK INCLUDED
- (1) Conventional Roof Assembly
- (2) Metal Counter-flashing
- (3) Insulation
- See available insulation products in Division C of this Manual.
- (4) Primary Membrane and Membrane Flashing.
2 RELATED WORK BY OTHERS
- (A) Acceptable Deck
- (B) Wall Anchor
- Anchor selection and attachment details are the responsibility of the Design Authority.
- (C) Anchor Eye
- (D) Anchor Placement
- Minimum 200 mm (8") above finished roof surface.
- (E) Plywood
- 15.9 mm (5/8") treated where required.
NOTE: See the Standard for additional requirements.
Back to "SBS" Roof System Details
© RCABC 2024
RoofStarTM is a registered Trademark of the RCABC.
No reproduction of this material, in whole or in part, is lawful without the expressed permission of the RCABC Guarantee Corp.