Difference between revisions of "SBS Fall Protection Anchor in Wall"

Jump to: navigation, search

Difference between revisions of "SBS Fall Protection Anchor in Wall"

(Created page with "File:10.3.7.2.jpg === WORK INCLUDED === (1) <b>Conventional Roof Assembly</b> (2) <b>Metal Counter Flashing</b> (3) <b>Insulation</b> (4) <b>Membrane Flashing / Stripp...")
 
 
(30 intermediate revisions by the same user not shown)
Line 1: Line 1:
[[File:10.3.7.2.jpg]]
+
{{Template:RPM Info}}
  
=== WORK INCLUDED ===
+
{{DISPLAYTITLE:<span style="position: absolute; clip: rect(1px 1px 1px 1px); clip: rect(1px, 1px, 1px, 1px);">{{FULLPAGENAME}}</span>}}
(1) <b>Conventional Roof Assembly</b>
+
__NOTOC__
  
(2) <b>Metal Counter Flashing</b>
+
<big><big>Division D - Construction Details</big></big>
 +
<hr>
 +
<big><big><big><big><big>SBS | Fall Protection Anchor in Wall ([[SBS_Roof_Systems_Standard#12.3.2.1._General_Requirements_for_Flashing_Penetrations | Article 12.3.2.1.]])</big></big></big></big></big>
 +
{{Template:Construction Details Header}}
 +
<div class="panel panel-success">
 +
<div class="panel-heading"><big>'''SBS Details'''</big></div>
 +
<div class="panel-body">
 +
<div class="col-md-6">
 +
<div style="text-align:center; vertical-align:center">
 +
[[File:10.3.7.2.jpg| link=http://rpm.rcabc.org/images/9/9a/10.3.7.2.jpg | class=img-responsive]]
 +
</div>
 +
</div><!-- COL-MD-6 -->
  
(3) <b>Insulation</b>
+
<div class="col-md-6">
 +
=== WORK INCLUDED ===
 +
;(1) [[SBS Roof Systems Standard#PART_1|'''Conventional Roof Assembly''']]
 +
;(2) [[SBS Roof Systems Standard#PART_13|'''Metal Counter-flashing''']]
 +
;(3) [[SBS Roof Systems Standard#PART_7|'''Insulation''']]: See available insulation products in Division C of this ''Manual''.
 +
;(4) [[SBS Roof Systems Standard#PART_9|'''Primary Membrane''']] and [[SBS Roof Systems Standard#PART_10|'''Membrane Flashing''']].
  
(4) <b>Membrane Flashing / Stripping & Primary Membrane</b>
+
<hr>
  
 
=== RELATED WORK BY OTHERS ===
 
=== RELATED WORK BY OTHERS ===
(A) <b>Acceptable Deck</b>
+
;(A) [[SBS Roof Systems Standard#PART_2|'''Acceptable Deck''']]:
 
+
;(B) '''Wall Anchor''': Anchor selection and attachment details are the responsibility of the ''Design Authority''.
(B) <b>Wall Anchor</b> to CSA Z91-M90: Concrete slab shown, see anchor manufacturer&#8217;s attachment for other wall types and attachment methods
+
;(C) '''Anchor Eye'''
 
+
;(D) '''Anchor Placement''': Minimum 200 mm (8") above finished roof surface.
(C) <b>Anchor Eye</b> to CSA Z91-M90
+
;(E) '''Plywood''': 15.9 mm (5/8") treated where required.
 
+
</div><!-- COL-6-MD -->
(D) <b>Anchor Placement:</b> Minimum 200 mm (8") above finished roof surface.
+
</div><!-- PANEL BODY -->
 
+
</div><!-- PANEL -->
(E) <b>Plywood:</b> 15.9 mm (5/8") treated where required.
 
 
 
 
 
'''NOTE''': Refer to <i>RGC Guarantee Standards</i> for additional requirements.
 
  
 +
'''NOTE''': See the [[SBS Roof Systems Standard | '''Standard''']] for additional requirements.
  
 
<hr>
 
<hr>
  
 +
[[SBS Roof System Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''"SBS" Roof System Details'']]
  
 +
[[Main Page | <i class="fa fa-home fa"></i> Home]]
  
 
+
{{Tempate:RPM Page Footer with Copyright and Current Date}}
[[Section:D. Application: Low Slope Roofs|<i class="fa fa-chevron-circle-left fa-2x" ></i> Back to ''SBS Application'']]
 
 
 
[[SBS Construction Details|<i class="fa fa-chevron-circle-left fa-2x" ></i> Back to ''SBS Construction Details'']]
 
 
 
[[Section:G. Construction Details|<i class="fa fa-chevron-circle-left fa-2x" ></i> Back to ''Construction Details'']]
 

Latest revision as of 18:33, 27 June 2022



Division D - Construction Details


SBS | Fall Protection Anchor in Wall ( Article 12.3.2.1.)

Notice to Reader
Images used in a Construction Detail are representative and not prescriptive, and are not necessarily drawn to scale. They are intended to support the related Standard (Ref. Division A, Article 2.2.1.2.).

The reader may link to the related Article in the detail title, or link to the Standard as it relates to a specific element in the detail. All hyperlinks are displayed blue text.

SBS Details

10.3.7.2.jpg

1 WORK INCLUDED

(1) Conventional Roof Assembly
(2) Metal Counter-flashing
(3) Insulation
See available insulation products in Division C of this Manual.
(4) Primary Membrane and Membrane Flashing.

2 RELATED WORK BY OTHERS

(A) Acceptable Deck
(B) Wall Anchor
Anchor selection and attachment details are the responsibility of the Design Authority.
(C) Anchor Eye
(D) Anchor Placement
Minimum 200 mm (8") above finished roof surface.
(E) Plywood
15.9 mm (5/8") treated where required.

NOTE: See the Standard for additional requirements.


Back to "SBS" Roof System Details

Home

© RCABC 2024
RoofStarTM is a registered Trademark of the RCABC.
No reproduction of this material, in whole or in part, is lawful without the expressed permission of the RCABC Guarantee Corp.