Difference between revisions of "SBS Sealant Pocket"
Difference between revisions of "SBS Sealant Pocket"
(Created page with "File:10.3.5.4.jpg === WORK INCLUDED === (1) <b>Gypsum Overlay Board: </b>If required by design authority. (2) <b>Vapour Retarder:</b> If required by design authority. (...") |
m (James Klassen moved page SBS 11.3.3.4 Sealant Pocket to SBS Sealant Pocket) |
||
(29 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
− | + | {{Template:RPM Info}} | |
− | = | + | {{DISPLAYTITLE:<span style="position: absolute; clip: rect(1px 1px 1px 1px); clip: rect(1px, 1px, 1px, 1px);">{{FULLPAGENAME}}</span>}} |
− | ( | + | __NOTOC__ |
− | (2) < | + | <big><big>Division D - Construction Details</big></big> |
+ | <hr> | ||
+ | <big><big><big><big><big>SBS | Sealant Pocket ([[SBS_Roof_Systems_Standard#12.3.2.8._Sealant_Pockets | Article 12.3.2.8.]])</big></big></big></big></big> | ||
+ | {{Template:Construction Details Header}} | ||
+ | <div class="panel panel-success"> | ||
+ | <div class="panel-heading"><big>'''SBS Details'''</big></div> | ||
+ | <div class="panel-body"> | ||
+ | <div class="col-md-6"> | ||
+ | <div style="text-align:center; vertical-align:center"> | ||
+ | [[File:10.3.5.4.jpg| link=http://rpm.rcabc.org/images/1/1c/10.3.5.4.jpg | class=img-responsive]] | ||
+ | </div> | ||
+ | </div><!-- COL-MD-6 --> | ||
− | (3) | + | <div class="col-md-6"> |
+ | === WORK INCLUDED === | ||
+ | ;(1) [[SBS Roof Systems Standard#PART_5|'''Supporting Deck Overlay''']]: If required by design authority. | ||
+ | ;(2) [[SBS Roof Systems Standard#PART_6|'''Air or Vapour Control Layers''']]: If required by design authority | ||
+ | ;(3) [[SBS Roof Systems Standard#PART_7|'''Insulation''']]: Mechanically fastened. See available insulation products in Division C of this ''Manual''. | ||
+ | ;(4) [[SBS Roof Systems Standard#PART_8|'''Insulation Overlay''']]: As required. | ||
+ | ;(5) [[SBS Roof Systems Standard#PART_9|'''Primary Membrane''']] and [[SBS Roof Systems Standard#SBSPROTECTION| '''Membrane Protection''']] | ||
+ | ;(6) '''Compatible Mastic''': Use only the membrane manufacturer's approved sealant. | ||
+ | ;(7) [[SBS Roof Systems Standard#PART_11|'''Sealant Pocket''']]: Minimum 100 mm (4") flange onto roof membrane. All corners, with the exception of one job-site formed double standing seam corner joint and adjoining lapped flange joining, shall be closed and soldered. Minimum height of gum pan to be 100 mm (4"). | ||
+ | ;(8) [[SBS Roof Systems Standard#PART_10|'''Membrane Flashing''']]: Onto primed metal flashing flange. | ||
+ | ;(9) '''Packing''': To prevent displacement of compatible mastic. | ||
+ | ;(10) '''Structural Sealant''': Use only the membrane manufacturers’ approved proprietary polyurethane based structural sealant. | ||
+ | ;(11) '''Back-up Storm Collar''': To be installed whenever practical. Caulk at top of collar. | ||
− | + | <hr> | |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
=== RELATED WORK BY OTHERS === | === RELATED WORK BY OTHERS === | ||
− | (A) | + | ;(A) [[SBS Roof Systems Standard#PART_2|'''Acceptable Supporting Deck Structure''']] |
+ | ;(B) '''Protrusion''' | ||
+ | ;(C) '''Wood Blocking''' | ||
− | |||
− | + | *<b>WARNING: <u>DO NOT USE</u> THIS DETAIL WITH HOT PIPES.</b> | |
+ | *<b>AVOID THIS DETAIL:</b> Wherever possible use Flanged Metal Stack Flashing or Curbed Opening. | ||
+ | </div><!-- COL-6-MD --> | ||
+ | </div><!-- PANEL BODY --> | ||
+ | </div><!-- PANEL --> | ||
− | |||
− | |||
− | |||
− | |||
+ | '''NOTE''': See the [[SBS Roof Systems Standard | '''Standard''']] for additional requirements. | ||
<hr> | <hr> | ||
+ | [[SBS Roof System Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''"SBS" Roof System Details'']] | ||
+ | [[Main Page | <i class="fa fa-home fa"></i> Home]] | ||
− | + | {{Tempate:RPM Page Footer with Copyright and Current Date}} | |
− | |||
− | |||
− | |||
− | |||
− |
Latest revision as of 18:47, 27 June 2022
Division D - Construction Details
SBS | Sealant Pocket ( Article 12.3.2.8.)
Notice to Reader | |
Images used in a Construction Detail are representative and not prescriptive, and are not necessarily drawn to scale. They are intended to support the related Standard (Ref. Division A, Article 2.2.1.2.).
The reader may link to the related Article in the detail title, or link to the Standard as it relates to a specific element in the detail. All hyperlinks are displayed blue text. |
SBS Details
1 WORK INCLUDED
- (1) Supporting Deck Overlay
- If required by design authority.
- (2) Air or Vapour Control Layers
- If required by design authority
- (3) Insulation
- Mechanically fastened. See available insulation products in Division C of this Manual.
- (4) Insulation Overlay
- As required.
- (5) Primary Membrane and Membrane Protection
- (6) Compatible Mastic
- Use only the membrane manufacturer's approved sealant.
- (7) Sealant Pocket
- Minimum 100 mm (4") flange onto roof membrane. All corners, with the exception of one job-site formed double standing seam corner joint and adjoining lapped flange joining, shall be closed and soldered. Minimum height of gum pan to be 100 mm (4").
- (8) Membrane Flashing
- Onto primed metal flashing flange.
- (9) Packing
- To prevent displacement of compatible mastic.
- (10) Structural Sealant
- Use only the membrane manufacturers’ approved proprietary polyurethane based structural sealant.
- (11) Back-up Storm Collar
- To be installed whenever practical. Caulk at top of collar.
2 RELATED WORK BY OTHERS
- (A) Acceptable Supporting Deck Structure
- (B) Protrusion
- (C) Wood Blocking
- WARNING: DO NOT USE THIS DETAIL WITH HOT PIPES.
- AVOID THIS DETAIL: Wherever possible use Flanged Metal Stack Flashing or Curbed Opening.
NOTE: See the Standard for additional requirements.
Back to "SBS" Roof System Details
© RCABC 2024
RoofStarTM is a registered Trademark of the RCABC.
No reproduction of this material, in whole or in part, is lawful without the expressed permission of the RCABC Guarantee Corp.