<big><big><big><big><big>SBS | Fire Separation Joint ([[SBS_Roof_Systems_Standard#10.3.4.4. Fire Separation Walls | Article 10.3.4.4.]])</big></big></big></big></big> | <big><big><big><big><big>SBS | Fire Separation Joint ([[SBS_Roof_Systems_Standard#10.3.4.4. Fire Separation Walls | Article 10.3.4.4.]])</big></big></big></big></big> | ||
− | { | + | {{Template:Construction Details Header}} |
− | |||
− | |||
− | |||
− | |||
<div class="panel panel-success"> | <div class="panel panel-success"> | ||
<div class="panel-heading"><big>'''SBS Details'''</big></div> | <div class="panel-heading"><big>'''SBS Details'''</big></div> |
Revision as of 18:52, 27 June 2022
Division D - Construction Details
SBS | Fire Separation Joint ( Article 10.3.4.4.)
Notice to Reader | |
Images used in a Construction Detail are representative and not prescriptive, and are not necessarily drawn to scale. They are intended to support the related Standard (Ref. Division A, Article 2.2.1.2.).
The reader may link to the related Article in the detail title, or link to the Standard as it relates to a specific element in the detail. All hyperlinks are displayed blue text. |
SBS Details
1 WORK INCLUDED
- (1) Supporting Deck Overlay
- If required by design authority.
- (2) Air or Vapour Control Layers
- If required by design authority.
- (3) Insulation
- See available insulation products in the Accepted Materials section of this Manual.
- (4) Insulation Overlay
- Where required.
- (5) Primary Membrane and Membrane Protection
- (6) Membrane Flashing
- (7) Membrane Counter Flashing
- (8) Base Metal Flashing
- Mechanically fasten to top of plywood backing. Optional on flexible membrane systems. Required on assemblies using gravel ballast filter mats.
- (9) Metal Flashing / Cladding
- (10) Secondary Metal Cap Flashing
- Joints to be offset from Cap Flashing, OR Water Channeling Clip may be used (See inset in detail D1.7.19 Roof-Wall Transitions (Fire Separation Wall)), OR solder standing seam joints. Do NOT place combustible materials over top of firewall.
- (11) Metal Cap Flashing
- Standing seam joints required.
2 RELATED WORK BY OTHERS
- (A) Acceptable Supporting Deck Structure
- (B) Acceptable Wall Surface
- (C) Wood Blocking
- (D) Grouted Finish
- Sloped surface to promote drainage off cap flashing.
NOTE: See the Standard for additional requirements.
Back to "SBS" Roof System Details