Difference between revisions of "Asphalt Shingles - Diverter Flashing"
Difference between revisions of "Asphalt Shingles - Diverter Flashing"
m (James Klassen moved page Asphalt Shingles Diverter Flashing to Asphalt Shingles - Diverter Flashing) |
|||
(12 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
− | { | + | {{Template:RPM Info}} |
− | | | + | |
− | + | {{DISPLAYTITLE:<span style="position: absolute; clip: rect(1px 1px 1px 1px); clip: rect(1px, 1px, 1px, 1px);">{{FULLPAGENAME}}</span>}} | |
+ | __NOTOC__ | ||
+ | |||
+ | <big><big>Division D - Construction Details</big></big> | ||
+ | <hr> | ||
+ | <big><big><big><big><big>Asphalt Shingles | Diverter Flashing ([[Asphalt_Shingle_Systems_Standard#10.1.4.2. Eave and Rake Edges | Article 10.1.4.2.]])</big></big></big></big></big> | ||
+ | {{Template:Construction Details Header}} | ||
<div class="panel panel-success"> | <div class="panel panel-success"> | ||
<div class="panel-heading"><big>'''Asphalt Shingle Details'''</big></div> | <div class="panel-heading"><big>'''Asphalt Shingle Details'''</big></div> | ||
Line 7: | Line 13: | ||
<div class="col-md-6"> | <div class="col-md-6"> | ||
<div style="text-align:center; vertical-align:center"> | <div style="text-align:center; vertical-align:center"> | ||
− | |||
− | [[File: | + | {| class="wikitable"; table style="background-color:white"; border="#A9A9A9;" |
+ | |+ Click on any image to expand it | ||
+ | |- | ||
+ | | [[File:ASh 10.1.2-1 CD.jpg|class=img-responsive | link=http://rpm.rcabc.org/images/a/a9/ASh_10.1.2-1_CD.jpg]] || [[File:ASh 10.1.2-2 CD.jpg|class=img-responsive | link=http://rpm.rcabc.org/images/9/90/ASh_10.1.2-2_CD.jpg]] | ||
+ | |- | ||
+ | | [[File:ASh 10.1.2-3 CD.jpg|class=img-responsive | link=http://rpm.rcabc.org/images/2/25/ASh_10.1.2-3_CD.jpg]] || [[File:ASh 10.1.2-4 CD.jpg|class=img-responsive | link=http://rpm.rcabc.org/images/3/3b/ASh_10.1.2-4_CD.jpg]] | ||
+ | |} | ||
+ | |||
</div> | </div> | ||
</div><!-- COL-MD-6 --> | </div><!-- COL-MD-6 --> | ||
Line 15: | Line 27: | ||
<div class="col-md-6"> | <div class="col-md-6"> | ||
=== WORK INCLUDED === | === WORK INCLUDED === | ||
− | ;(1) [[ | + | ;(1) [[Asphalt Shingle Systems Standard#AShDIVERTER|'''Step 1''']]: Use a standard 225 mm (9”) long step flashing and scribe the fold lines as shown on the illustration. Note that the down-slope upstand is bent at a 110-degree angle to the slope. No cutting is needed or appropriate; the flashing is formed with folds, bread-pan style. |
− | ;(2) | + | ;(2) [[Asphalt Shingle Systems Standard#AShDIVERTER|'''Step 2''']]: Fold the bottom end of the flashing as illustrated, so that the bottom upstand aligns with the vertical bread-pan fold made in the next step. |
− | ;(3) [[ | + | ;(3) [[Asphalt Shingle Systems Standard#AShDIVERTER|'''Step 3''']]: Fold the back flap around and behind the main upstand, bread-pan style. |
− | ;(4 | + | ;(4) [[Asphalt Shingle Systems Standard#AShDIVERTER|'''Step 4''']]: If required or desirable, cut a capillary notch in the bottom upstand (illustrated), and trim the upstand to suit the aesthetics of the roof. |
− | |||
− | |||
− | |||
<hr> | <hr> | ||
=== RELATED WORK BY OTHERS === | === RELATED WORK BY OTHERS === | ||
− | ; | + | ;None |
</div><!-- COL-6-MD --> | </div><!-- COL-6-MD --> | ||
</div><!-- PANEL BODY --> | </div><!-- PANEL BODY --> | ||
</div><!-- PANEL --> | </div><!-- PANEL --> | ||
− | '''NOTE''': | + | '''NOTE''': See the [[Asphalt Shingle Systems Standard | '''Standard''']] for additional requirements. |
<hr> | <hr> | ||
+ | [[Asphalt Shingle System Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''Asphalt Shingle System Details'']] | ||
− | [[ | + | [[Main Page | <i class="fa fa-home fa"></i> Home]] |
− | |||
− | |||
− | + | {{Tempate:RPM Page Footer with Copyright and Current Date}} |
Latest revision as of 14:28, 30 June 2022
Division D - Construction Details
Asphalt Shingles | Diverter Flashing ( Article 10.1.4.2.)
Notice to Reader | |
Images used in a Construction Detail are representative and not prescriptive, and are not necessarily drawn to scale. They are intended to support the related Standard (Ref. Division A, Article 2.2.1.2.).
The reader may link to the related Article in the detail title, or link to the Standard as it relates to a specific element in the detail. All hyperlinks are displayed blue text. |
Asphalt Shingle Details
1 WORK INCLUDED
- (1) Step 1
- Use a standard 225 mm (9”) long step flashing and scribe the fold lines as shown on the illustration. Note that the down-slope upstand is bent at a 110-degree angle to the slope. No cutting is needed or appropriate; the flashing is formed with folds, bread-pan style.
- (2) Step 2
- Fold the bottom end of the flashing as illustrated, so that the bottom upstand aligns with the vertical bread-pan fold made in the next step.
- (3) Step 3
- Fold the back flap around and behind the main upstand, bread-pan style.
- (4) Step 4
- If required or desirable, cut a capillary notch in the bottom upstand (illustrated), and trim the upstand to suit the aesthetics of the roof.
2 RELATED WORK BY OTHERS
- None
NOTE: See the Standard for additional requirements.
Back to Asphalt Shingle System Details
© RCABC 2024
RoofStarTM is a registered Trademark of the RCABC.
No reproduction of this material, in whole or in part, is lawful without the expressed permission of the RCABC Guarantee Corp.