Difference between revisions of "Asphalt Shingles - Membrane Gutter (Design Elements)"
Difference between revisions of "Asphalt Shingles - Membrane Gutter (Design Elements)"
m (James Klassen moved page ASh 12.2.1 Built-in Gutter (Design) to Asphalt Shingles - Membrane Gutter (Design Elements)) |
|||
(7 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
− | { | + | {{Template:RPM Info}} |
− | | | + | |
− | + | {{DISPLAYTITLE:<span style="position: absolute; clip: rect(1px 1px 1px 1px); clip: rect(1px, 1px, 1px, 1px);">{{FULLPAGENAME}}</span>}} | |
+ | __NOTOC__ | ||
+ | |||
+ | <big><big>Division D - Construction Details</big></big> | ||
+ | <hr> | ||
+ | <big><big><big><big><big>Asphalt Shingles | Membrane Gutter (Design Elements) ([[Asphalt_Shingle_Systems_Standard#11.3.3.8. Membrane Gutters | Article 11.3.3.8.]])</big></big></big></big></big> | ||
+ | {{Template:Construction Details Header}} | ||
<div class="panel panel-success"> | <div class="panel panel-success"> | ||
<div class="panel-heading"><big>'''ASM Details'''</big></div> | <div class="panel-heading"><big>'''ASM Details'''</big></div> | ||
Line 7: | Line 13: | ||
<div class="col-md-6"> | <div class="col-md-6"> | ||
<div style="text-align:center; vertical-align:center"> | <div style="text-align:center; vertical-align:center"> | ||
− | [[File:8.3.1.jpg|class=img-responsive]] | + | [[File:8.3.1.jpg| link=http://rpm.rcabc.org/images/d/d7/8.3.1.jpg | class=img-responsive]] |
</div> | </div> | ||
</div><!-- COL-MD-6 --> | </div><!-- COL-MD-6 --> | ||
Line 16: | Line 22: | ||
;(2) '''Adhesion''': Membranes must be fully adhered, where exposed, and mechanically fastened at terminations 300 mm (12") o/c | ;(2) '''Adhesion''': Membranes must be fully adhered, where exposed, and mechanically fastened at terminations 300 mm (12") o/c | ||
;(3) '''Height''': The minimum vertical sealed height above the maximum water level is 150 mm (6"). The membrane run up the slope will vary with roof pitch. Increase height in heavy snow regions. | ;(3) '''Height''': The minimum vertical sealed height above the maximum water level is 150 mm (6"). The membrane run up the slope will vary with roof pitch. Increase height in heavy snow regions. | ||
− | ;(4) [[ | + | ;(4) [[Asphalt Shingle Systems Standard#ASEave|'''Eave Protection and Underlay''']]: Built-in gutter membranes can be extended to act as an eave protection membrane. Underlay or eave protection membrane must overlap built-in gutter membrane by a minimum of 200 mm (8") and be installed in shingle fashion (not shown for clarity). |
<hr> | <hr> | ||
Line 27: | Line 33: | ||
</div><!-- PANEL --> | </div><!-- PANEL --> | ||
− | '''NOTE''': | + | '''NOTE''': See the [[Asphalt Shingle Systems Standard | '''Standard''']] for additional requirements. |
<hr> | <hr> | ||
+ | [[Asphalt Shingle System Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''Asphalt Shingle System Details'']] | ||
− | [[ | + | [[Main Page | <i class="fa fa-home fa"></i> Home]] |
− | |||
− | |||
− | + | {{Tempate:RPM Page Footer with Copyright and Current Date}} |
Latest revision as of 14:32, 30 June 2022
Division D - Construction Details
Asphalt Shingles | Membrane Gutter (Design Elements) ( Article 11.3.3.8.)
Notice to Reader | |
Images used in a Construction Detail are representative and not prescriptive, and are not necessarily drawn to scale. They are intended to support the related Standard (Ref. Division A, Article 2.2.1.2.).
The reader may link to the related Article in the detail title, or link to the Standard as it relates to a specific element in the detail. All hyperlinks are displayed blue text. |
ASM Details
1 WORK INCLUDED
- (1) Membranes
- Membranes must be installed to RoofStar Guarantee Standards and the manufacturer's printed instructions (NOTE: Fasteners shall be installed 4” or more above the maximum water line, and gutters must include a scupper overflow drain.). Also refer to 9 Built-in Gutters in the RoofStar Guarantee Standards for ASM Roof Systems.
- (2) Adhesion
- Membranes must be fully adhered, where exposed, and mechanically fastened at terminations 300 mm (12") o/c
- (3) Height
- The minimum vertical sealed height above the maximum water level is 150 mm (6"). The membrane run up the slope will vary with roof pitch. Increase height in heavy snow regions.
- (4) Eave Protection and Underlay
- Built-in gutter membranes can be extended to act as an eave protection membrane. Underlay or eave protection membrane must overlap built-in gutter membrane by a minimum of 200 mm (8") and be installed in shingle fashion (not shown for clarity).
2 RELATED WORK BY OTHERS
- (A) Dimension
- Dimensions of parapets, cants and water loading of gutters are variable and should be determined by design authority
- (B) Acceptable Deck
NOTE: See the Standard for additional requirements.
Back to Asphalt Shingle System Details
© RCABC 2024
RoofStarTM is a registered Trademark of the RCABC.
No reproduction of this material, in whole or in part, is lawful without the expressed permission of the RCABC Guarantee Corp.