Difference between revisions of "Asphalt Shingles - Cylindrical Penetration (Lead Flashing)"

Jump to: navigation, search

Difference between revisions of "Asphalt Shingles - Cylindrical Penetration (Lead Flashing)"

 
(13 intermediate revisions by the same user not shown)
Line 1: Line 1:
[[File:7.1.5.8.jpg]]
+
{{Template:RPM Info}}
  
 +
{{DISPLAYTITLE:<span style="position: absolute; clip: rect(1px 1px 1px 1px); clip: rect(1px, 1px, 1px, 1px);">{{FULLPAGENAME}}</span>}}
 +
__NOTOC__
  
'''NOTE''': Refer to '''''RoofStar Guarantee Standards''''' for additional requirements.
+
<big><big>Division D - Construction Details</big></big>
 +
<hr>
 +
<big><big><big><big><big>Asphalt Shingles | Cylindrical Penetration (Lead Flashing) ([[Asphalt_Shingle_Systems_Standard#12.3.2.1. General Requirements for Flashing Penetrations | Article 12.3.2.1.]])</big></big></big></big></big>
 +
{{Template:Construction Details Header}}
 +
<div class="panel panel-success">
 +
<div class="panel-heading"><big>'''Asphalt Shingle Details'''</big></div>
 +
<div class="panel-body">
 +
<div class="col-md-6">
 +
<div style="text-align:center; vertical-align:center">
 +
[[File:ASh 11.1.2 CD.jpg| link=http://rpm.rcabc.org/images/1/12/ASh_11.1.2_CD.jpg | class=img-responsive]]
 +
</div>
 +
</div><!-- COL-MD-6 -->
  
 +
<div class="col-md-6">
  
<hr>
+
</div><!-- COL-6-MD -->
 +
</div><!-- PANEL BODY -->
 +
</div><!-- PANEL -->
  
 +
'''NOTE''': See the [[Asphalt Shingle Systems Standard | '''Standard''']] for additional requirements.
  
 +
<hr>
  
[[Section:E. Application: Steep Slope Roofs|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''Asphalt Shingle Application'']]
+
[[Asphalt Shingle System Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''Asphalt Shingle System Details'']]
  
[[Asphalt Shingles Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''Asphalt Shingles Construction Details'']]
+
[[Main Page | <i class="fa fa-home fa"></i> Home]]
  
[[Section:G. Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''Construction Details'']]
+
{{Tempate:RPM Page Footer with Copyright and Current Date}}

Latest revision as of 14:38, 30 June 2022



Division D - Construction Details


Asphalt Shingles | Cylindrical Penetration (Lead Flashing) ( Article 12.3.2.1.)

Notice to Reader
Images used in a Construction Detail are representative and not prescriptive, and are not necessarily drawn to scale. They are intended to support the related Standard (Ref. Division A, Article 2.2.1.2.).

The reader may link to the related Article in the detail title, or link to the Standard as it relates to a specific element in the detail. All hyperlinks are displayed blue text.

Asphalt Shingle Details

ASh 11.1.2 CD.jpg

NOTE: See the Standard for additional requirements.


Back to Asphalt Shingle System Details

Home

© RCABC 2024
RoofStarTM is a registered Trademark of the RCABC.
No reproduction of this material, in whole or in part, is lawful without the expressed permission of the RCABC Guarantee Corp.