Difference between revisions of "SBS Fire Separation Joint"

Jump to: navigation, search

Difference between revisions of "SBS Fire Separation Joint"

(WORK INCLUDED)
 
(2 intermediate revisions by the same user not shown)
Line 7: Line 7:
 
<hr>
 
<hr>
 
<big><big><big><big><big>SBS | Fire Separation Joint ([[SBS_Roof_Systems_Standard#10.3.4.4. Fire Separation Walls | Article 10.3.4.4.]])</big></big></big></big></big>
 
<big><big><big><big><big>SBS | Fire Separation Joint ([[SBS_Roof_Systems_Standard#10.3.4.4. Fire Separation Walls | Article 10.3.4.4.]])</big></big></big></big></big>
{| class="wikitable" | style="color: black; background-color: orange; width: 100%;text-align:center"
+
{{Template:Construction Details Header}}
| colspan="2"  | <big>'''''Notice to Reader'''''</big>
 
|-
 
| style="color: black; background-color: #ffffcc; width: 100%;text-align:center" | Images used in a Construction Detail are representative and not prescriptive.  Nor are they necessarily drawn to scale. Rather, they are provided to visually convey the requirements of the Standard they represent. Unless otherwise required by the Standard, dimensions, the selection of materials and their application remains the responsibility of the ''Design Authority''.<br><br>The full text of the referenced requirements in the [[SBS Roof Systems Standard | '''Standard''']] may be read by using the <span style="color:#6495ed">'''blue hyperlinks'''</span>
 
|}
 
 
<div class="panel panel-success">
 
<div class="panel panel-success">
 
<div class="panel-heading"><big>'''SBS Details'''</big></div>
 
<div class="panel-heading"><big>'''SBS Details'''</big></div>
Line 25: Line 21:
 
;(1) [[SBS Roof Systems Standard#PART_5|'''Supporting Deck Overlay''']]: If required by design authority.
 
;(1) [[SBS Roof Systems Standard#PART_5|'''Supporting Deck Overlay''']]: If required by design authority.
 
;(2) [[SBS Roof Systems Standard#PART_6|'''Air or Vapour Control Layers''']]: If required by design authority.
 
;(2) [[SBS Roof Systems Standard#PART_6|'''Air or Vapour Control Layers''']]: If required by design authority.
;(3) [[SBS Roof Systems Standard#PART_7|'''Insulation''']]: See available insulation products in the [[Roof Deck Insulation|'''Accepted Materials''']] section of this Manual.
+
;(3) [[SBS Roof Systems Standard#PART_7|'''Insulation''']]: See available insulation products in the [[Division C|'''Accepted Materials''']] section of this Manual.
 
;(4) [[SBS Roof Systems Standard#PART_8|'''Insulation Overlay''']]: Where required.
 
;(4) [[SBS Roof Systems Standard#PART_8|'''Insulation Overlay''']]: Where required.
 
;(5) [[SBS Roof Systems Standard#PART_9|'''Primary Membrane''']] and [[SBS Roof Systems Standard#PART_9| '''Membrane Protection''']]
 
;(5) [[SBS Roof Systems Standard#PART_9|'''Primary Membrane''']] and [[SBS Roof Systems Standard#PART_9| '''Membrane Protection''']]
Line 32: Line 28:
 
;(8) [[SBS Roof Systems Standard#PART_10|'''Base Metal Flashing''']]: Mechanically fasten to top of plywood backing. Optional on flexible membrane systems. Required on assemblies using gravel ballast filter mats.
 
;(8) [[SBS Roof Systems Standard#PART_10|'''Base Metal Flashing''']]: Mechanically fasten to top of plywood backing. Optional on flexible membrane systems. Required on assemblies using gravel ballast filter mats.
 
;(9) <b>Metal Flashing / Cladding</b>
 
;(9) <b>Metal Flashing / Cladding</b>
;(10)  '''Secondary Metal Cap Flashing''': Joints to be offset from Cap Flashing, <b>OR</b> Water Channeling Clip may be used (See inset in detail [[SBS Details:D1.7.19 Roof-Wall Transitions (Fire Separation Wall)|'''D1.7.19 Roof-Wall Transitions (Fire Separation Wall)''']]), <b>OR</b> solder standing seam joints. Do <b><u>NOT</u></b> place combustible materials over top of firewall.
+
;(10)  '''Secondary Metal Cap Flashing''': Joints to be offset from Cap Flashing, <b>OR</b> Water Channeling Clip may be used (See inset in detail [[SBS Fire Separation Wall| SBS | Separation Wall]]), <b>OR</b> solder standing seam joints. Do <b><u>NOT</u></b> place combustible materials over top of firewall.
 
;(11) [[SBS Roof Systems Standard#PART_13|'''Metal Cap Flashing''']]: Standing seam joints required.
 
;(11) [[SBS Roof Systems Standard#PART_13|'''Metal Cap Flashing''']]: Standing seam joints required.
  

Latest revision as of 21:52, 16 September 2022



Division D - Construction Details


SBS | Fire Separation Joint ( Article 10.3.4.4.)

Notice to Reader
Images used in a Construction Detail are representative and not prescriptive, and are not necessarily drawn to scale. They are intended to support the related Standard (Ref. Division A, Article 2.2.1.2.).

The reader may link to the related Article in the detail title, or link to the Standard as it relates to a specific element in the detail. All hyperlinks are displayed blue text.

SBS Details

10.3.4.3.jpg

1 WORK INCLUDED

(1) Supporting Deck Overlay
If required by design authority.
(2) Air or Vapour Control Layers
If required by design authority.
(3) Insulation
See available insulation products in the Accepted Materials section of this Manual.
(4) Insulation Overlay
Where required.
(5) Primary Membrane and Membrane Protection
(6) Membrane Flashing
(7) Membrane Counter Flashing
(8) Base Metal Flashing
Mechanically fasten to top of plywood backing. Optional on flexible membrane systems. Required on assemblies using gravel ballast filter mats.
(9) Metal Flashing / Cladding
(10) Secondary Metal Cap Flashing
Joints to be offset from Cap Flashing, OR Water Channeling Clip may be used (See inset in detail SBS | Separation Wall), OR solder standing seam joints. Do NOT place combustible materials over top of firewall.
(11) Metal Cap Flashing
Standing seam joints required.

2 RELATED WORK BY OTHERS

(A) Acceptable Supporting Deck Structure
(B) Acceptable Wall Surface
(C) Wood Blocking
(D) Grouted Finish
Sloped surface to promote drainage off cap flashing.

NOTE: See the Standard for additional requirements.


Back to "SBS" Roof System Details

Home

© RCABC 2024
RoofStarTM is a registered Trademark of the RCABC.
No reproduction of this material, in whole or in part, is lawful without the expressed permission of the RCABC Guarantee Corp.