Difference between revisions of "Asphalt Shingles - Intersection with Waterproofing Roof (Upper)"
Difference between revisions of "Asphalt Shingles - Intersection with Waterproofing Roof (Upper)"
(21 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
− | + | {{Template:RPM Info}} | |
+ | {{DISPLAYTITLE:<span style="position: absolute; clip: rect(1px 1px 1px 1px); clip: rect(1px, 1px, 1px, 1px);">{{FULLPAGENAME}}</span>}} | ||
+ | __NOTOC__ | ||
− | ''' | + | <big><big>Division D - Construction Details</big></big> |
+ | <hr> | ||
+ | <big><big><big><big><big>Asphalt Shingles | Intersection with Waterproofing Roof (Upper) ([[Asphalt_Shingle_Systems_Standard#10.3.7.2. Intersections with Waterproofing Roof Systems | Article 10.3.7.2.]])</big></big></big></big></big> | ||
+ | {{Template:Construction Details Header}} | ||
+ | <div class="panel panel-success"> | ||
+ | <div class="panel-heading"><big>'''Asphalt Shingle Details'''</big></div> | ||
+ | <div class="panel-body"> | ||
+ | <div class="col-md-6"> | ||
+ | <div style="text-align:center; vertical-align:center"> | ||
+ | |||
+ | {| class="wikitable"; table style="background-color:white"; border="#A9A9A9;" | ||
+ | |+ Click on any image to expand it | ||
+ | |- | ||
+ | | [[File:ASh Intersection with Waterproofing Roof (Upper) 1.jpg | link=https://rpm.rcabc.org/images/b/b8/ASh_Intersection_with_Waterproofing_Roof_%28Upper%29_1.jpg | class=img-responsive]] | ||
+ | |- | ||
+ | | [[File:ASh Intersection with Waterproofing Roof (Upper) 2.jpg | link=https://rpm.rcabc.org/images/8/81/ASh_Intersection_with_Waterproofing_Roof_%28Upper%29_2.jpg | class=img-responsive]] | ||
+ | |} | ||
+ | </div> | ||
+ | </div><!-- COL-MD-6 --> | ||
+ | <div class="col-md-6"> | ||
+ | === WORK INCLUDED === | ||
+ | ;(1) [[Asphalt Shingle Systems Standard#AShUNDERLAYMENT|'''Underlayment''']]: Required, and installed to overlap the Valley Protection Membrane and the Valley Metal Flashing. Install ‘shingle-style’, following the requirements for side and end laps; use acceptable fasteners, or adhere (if a self-adhering membrane) in keeping with the manufacturer’s published requirements. | ||
+ | ;(2) [[Asphalt Shingle Systems Standard#AShEAVES|'''Eave Protection Membrane''']]: Applied beneath the metal valley flashing. | ||
+ | ;(3) [[Asphalt Shingle Systems Standard#AShPART9GEN-APPLICATION|'''Shingles (field)''']]: | ||
+ | ;(4) Metal Counterflashing/Headwall Flashing. | ||
+ | ;(5) Metal Edge Flashing: (refer to the related Membrane Standards, '''10.3.5.2 Metal Edge Terminations'''). | ||
+ | ;(6) Field Membrane: (refer to the related Membrane Standards, Part '''9 FIELD MEMBRANE''' and Part '''10 PERIMETERS and WALLS'''). | ||
<hr> | <hr> | ||
+ | === RELATED WORK BY OTHERS === | ||
+ | ;(A) [[Asphalt Shingle Systems Standard#AShDECK|'''Acceptable Deck''']] | ||
+ | </div><!-- COL-6-MD --> | ||
+ | </div><!-- PANEL BODY --> | ||
+ | </div><!-- PANEL --> | ||
+ | |||
+ | '''NOTE''': See the [[Asphalt Shingle Systems Standard | '''Standard''']] for additional requirements. | ||
+ | <hr> | ||
− | [[ | + | [[Asphalt Shingle System Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''Asphalt Shingle System Details'']] |
− | [[ | + | [[Main Page | <i class="fa fa-home fa"></i> Home]] |
− | + | {{Tempate:RPM Page Footer with Copyright and Current Date}} |
Latest revision as of 14:13, 5 October 2022
Division D - Construction Details
Asphalt Shingles | Intersection with Waterproofing Roof (Upper) ( Article 10.3.7.2.)
Notice to Reader | |
Images used in a Construction Detail are representative and not prescriptive, and are not necessarily drawn to scale. They are intended to support the related Standard (Ref. Division A, Article 2.2.1.2.).
The reader may link to the related Article in the detail title, or link to the Standard as it relates to a specific element in the detail. All hyperlinks are displayed blue text. |
Asphalt Shingle Details
1 WORK INCLUDED
- (1) Underlayment
- Required, and installed to overlap the Valley Protection Membrane and the Valley Metal Flashing. Install ‘shingle-style’, following the requirements for side and end laps; use acceptable fasteners, or adhere (if a self-adhering membrane) in keeping with the manufacturer’s published requirements.
- (2) Eave Protection Membrane
- Applied beneath the metal valley flashing.
- (3) Shingles (field)
- (4) Metal Counterflashing/Headwall Flashing.
- (5) Metal Edge Flashing
- (refer to the related Membrane Standards, 10.3.5.2 Metal Edge Terminations).
- (6) Field Membrane
- (refer to the related Membrane Standards, Part 9 FIELD MEMBRANE and Part 10 PERIMETERS and WALLS).
2 RELATED WORK BY OTHERS
- (A) Acceptable Deck
NOTE: See the Standard for additional requirements.
Back to Asphalt Shingle System Details
© RCABC 2024
No reproduction of this material, in whole or in part, is lawful without the expressed permission of the RCABC Guarantee Corp.