Difference between revisions of "SBS Parapet-Wall Connection"
Difference between revisions of "SBS Parapet-Wall Connection"
(→RELATED WORK BY OTHERS) |
|||
(42 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
− | + | {{Template:RPM Info}} | |
− | = | + | {{DISPLAYTITLE:<span style="position: absolute; clip: rect(1px 1px 1px 1px); clip: rect(1px, 1px, 1px, 1px);">{{FULLPAGENAME}}</span>}} |
+ | __NOTOC__ | ||
− | (1) < | + | <big><big>Division D - Construction Details</big></big> |
+ | <hr> | ||
+ | <big><big><big><big><big>SBS | Parapet-Wall Connection ([[SBS_Roof_Systems_Standard#10.3.4.1._Parapets | Article 10.3.4.1.]])</big></big></big></big></big> | ||
+ | {{Template:Construction Details Header}} | ||
+ | <div class="panel panel-success"> | ||
+ | <div class="panel-heading"><big>'''SBS Details'''</big></div> | ||
+ | <div class="panel-body"> | ||
+ | <div class="col-md-6"> | ||
+ | <div style="text-align:center; vertical-align:center"> | ||
+ | [[File:10.3.1.4.jpg|class=img-responsive]] | ||
+ | </div> | ||
− | + | </div><!-- COL-MD-6 --> | |
− | + | <div class="col-md-6"> | |
+ | === WORK INCLUDED === | ||
− | (4) | + | ;(1) [[SBS Roof Systems Standard#PART_5|'''Supporting Deck Overlay''']]: If required by design authority. |
+ | ;(2) [[SBS Roof Systems Standard#PART_6|'''Air or Vapour Control Layers''']]:If required by design authority. | ||
+ | ;(3) [[SBS Roof Systems Standard#PART_7|'''Insulation''']]: | ||
+ | :See list of '''[[Division C: Accepted Materials|Accepted Materials]]'''. | ||
+ | ;(4) [[SBS Roof Systems Standard#PART_8|'''Insulation Overlay''']]: | ||
+ | :As required. | ||
+ | ;(5) [[SBS Roof Systems Standard#PART_9|'''Primary Membrane''']] and [[RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies#SBSPROTECTION| '''Membrane Protection''']]: | ||
+ | ;(6) [[SBS Roof Systems Standard#PART_10|'''Membrane Flashing (attachment & termination)''']]: Mechanically fasten at terminations. At least one ply must extend over outside edge. | ||
+ | ;(7) [[SBS Roof Systems Standard#PART_13|'''Metal Base Flashing''']]: Optional on flexible membrane systems. Required on assemblies using gravel ballast filter mats. | ||
+ | ;(8) [[SBS Roof Systems Standard#PART_13|'''Metal Cap Flashing''']]: Must overlap exterior wall finish. Fasten with concealed clip-type fasteners <b>or</b> cladding screws evenly spaced between seams. | ||
+ | ;(9) [[SBS Roof Systems Standard#PART_10|'''Wall Tie-in''']]: Minimum 2 mm (0.078") self-adhered modified bitumen or flexible membrane manufacturers approved detail. | ||
+ | ;(10)[[SBS Roof Systems Standard#PART_13|'''Metal Counter-flashing''']]: | ||
− | + | <hr> | |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
=== RELATED WORK BY OTHERS === | === RELATED WORK BY OTHERS === | ||
− | (A) | + | ;(A) [[SBS Roof Systems Standard#PART_2|'''Acceptable Supporting Deck Structure''']] |
− | + | ;(B) [[SBS Roof Systems Standard#PART_6|'''Air and Vapour Control Layer Seal''']] | |
− | (B) | + | ;(C) [[SBS Roof Systems Standard#PART_2|'''Acceptable Wall Surface''']] |
− | + | ;(D) [[SBS Roof Systems Standard#PART_10|'''Wood Blocking''']] | |
− | (C) | + | ;(E) [[SBS Roof Systems Standard#PART_10|'''Sloped Wood Blocking''']] |
− | + | :Required over 100 mm (4") parapet width. | |
− | (D) | + | ;(F) [[SBS Roof Systems Standard#PART_10|'''Wall Sheathing Membrane''']]: Minimum 1 mm (0.040") self-adhered modified bitumen. |
− | + | ;(G) <b>Wall Cladding</b> | |
− | (E) | + | </div><!-- COL-6-MD --> |
− | + | </div><!-- PANEL BODY --> | |
− | (F) | + | </div><!-- PANEL --> |
− | |||
− | (G) <b>Wall Cladding</b> | ||
− | |||
− | |||
− | |||
+ | '''NOTE''': See the [[SBS Roof Systems Standard | '''Standard''']] for additional requirements. | ||
<hr> | <hr> | ||
+ | [[SBS Roof System Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''"SBS" Roof System Details'']] | ||
+ | [[Main Page | <i class="fa fa-home fa"></i> Home]] | ||
− | + | {{Tempate:RPM Page Footer with Copyright and Current Date}} | |
− | |||
− | |||
− | |||
− | |||
− |
Latest revision as of 17:50, 27 October 2023
Division D - Construction Details
SBS | Parapet-Wall Connection ( Article 10.3.4.1.)
Notice to Reader | |
Images used in a Construction Detail are representative and not prescriptive, and are not necessarily drawn to scale. They are intended to support the related Standard (Ref. Division A, Article 2.2.1.2.).
The reader may link to the related Article in the detail title, or link to the Standard as it relates to a specific element in the detail. All hyperlinks are displayed blue text. |
SBS Details
1 WORK INCLUDED
- (1) Supporting Deck Overlay
- If required by design authority.
- (2) Air or Vapour Control Layers
- If required by design authority.
- (3) Insulation
- See list of Accepted Materials.
- (4) Insulation Overlay
- As required.
- (5) Primary Membrane and Membrane Protection
- (6) Membrane Flashing (attachment & termination)
- Mechanically fasten at terminations. At least one ply must extend over outside edge.
- (7) Metal Base Flashing
- Optional on flexible membrane systems. Required on assemblies using gravel ballast filter mats.
- (8) Metal Cap Flashing
- Must overlap exterior wall finish. Fasten with concealed clip-type fasteners or cladding screws evenly spaced between seams.
- (9) Wall Tie-in
- Minimum 2 mm (0.078") self-adhered modified bitumen or flexible membrane manufacturers approved detail.
- (10)Metal Counter-flashing
2 RELATED WORK BY OTHERS
- (A) Acceptable Supporting Deck Structure
- (B) Air and Vapour Control Layer Seal
- (C) Acceptable Wall Surface
- (D) Wood Blocking
- (E) Sloped Wood Blocking
- Required over 100 mm (4") parapet width.
- (F) Wall Sheathing Membrane
- Minimum 1 mm (0.040") self-adhered modified bitumen.
- (G) Wall Cladding
NOTE: See the Standard for additional requirements.
Back to "SBS" Roof System Details
© RCABC 2024
RoofStarTM is a registered Trademark of the RCABC.
No reproduction of this material, in whole or in part, is lawful without the expressed permission of the RCABC Guarantee Corp.