Difference between revisions of "SBS Metal Edge Termination"
Difference between revisions of "SBS Metal Edge Termination"
(→WORK INCLUDED) |
|||
(14 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
{{Template:RPM Info}} | {{Template:RPM Info}} | ||
+ | |||
+ | {{DISPLAYTITLE:<span style="position: absolute; clip: rect(1px 1px 1px 1px); clip: rect(1px, 1px, 1px, 1px);">{{FULLPAGENAME}}</span>}} | ||
+ | __NOTOC__ | ||
+ | |||
+ | <big><big>Division D - Construction Details</big></big> | ||
<hr> | <hr> | ||
− | + | <big><big><big><big><big>SBS | Metal Edge Termination ([[SBS_Roof_Systems_Standard#10.3.4.2._Low_Profile_Edges | Article 10.3.4.2.]])</big></big></big></big></big> | |
− | + | {{Template:Construction Details Header}} | |
− | | | ||
− | |||
− | |||
<div class="panel panel-success"> | <div class="panel panel-success"> | ||
<div class="panel-heading"><big>'''SBS Details'''</big></div> | <div class="panel-heading"><big>'''SBS Details'''</big></div> | ||
Line 11: | Line 13: | ||
<div class="col-md-6"> | <div class="col-md-6"> | ||
<div style="text-align:center; vertical-align:center"> | <div style="text-align:center; vertical-align:center"> | ||
− | [[File:SBS 10.3.5.2 Metal Edge | + | [[File:SBS 10.3.5.2 Metal Edge.jpg|class=img-responsive | link=https://rpm.rcabc.org/images/2/2b/SBS_10.3.5.2_Metal_Edge.jpg]] |
</div> | </div> | ||
− | |||
− | |||
− | |||
− | |||
− | |||
</div><!-- COL-MD-6 --> | </div><!-- COL-MD-6 --> | ||
Line 24: | Line 21: | ||
=== WORK INCLUDED === | === WORK INCLUDED === | ||
;(1) Primer: For self-adhered or torch-applied base membranes, as required by the membrane manufacturer. | ;(1) Primer: For self-adhered or torch-applied base membranes, as required by the membrane manufacturer. | ||
− | ;(2) [[SBS Roof Systems Standard# | + | ;(2) [[SBS Roof Systems Standard#PART_9|'''Base Membrane (field)''']]: Torch-applied, adhered, self-adhered (as illustrated), or mechanically attached (subject to deck type and wind uplift design requirements). See Tables '''9.1''' and '''9.2''' for acceptable membrane types and securement options. See '''9.3''' for application requirements. |
− | ;(3) [[SBS Roof Systems Standard# | + | ;(3) [[SBS Roof Systems Standard#PART_10|'''Mastic''']]: Applied beneath metal edge flashing. Refer to [[SBS Roof Systems Standard#10.3.4.2. Low Profile Edges | Article 10.3.4.2.]] |
− | ;(4) [[SBS Roof Systems Standard# | + | ;(4) [[SBS Roof Systems Standard#PART_10|'''Metal Edge Flashing''']]: See '''13.3.2 Fabrication''' for manufacturing requirements. See also [[SBS Roof Systems Standard#10.3.4.2. Low Profile Edges | Article 10.3.4.2., "Low Profile Edges]] for application standards and securement. Hemmed edges are required; a kicked-out drip edge is optional but recommended (See [[SBS Roof Systems Standard#13.1.3.5. Fit and Finish | Article 13.1.3.5., "Fit and Finish"]]. |
− | ;(5) [[SBS Roof Systems Standard# | + | ;(5) [[SBS Roof Systems Standard#PART_10|'''Base Membrane (flashing)''']]: Applied to overlap metal flashing and the field base membrane. |
− | ;(6) [[SBS Roof Systems Standard# | + | ;(6) [[SBS Roof Systems Standard#PART_9|'''Cap Membrane (field)''']]: Installed according to '''Part 9''' requirements and sealed along the exposed edge with an un-tooled bead of membrane compatible sealant ([[SBS Roof Systems Standard#10.3.4.2. Low Profile Edges | Article 10.3.4.2.]]). |
<hr> | <hr> | ||
Line 43: | Line 40: | ||
<hr> | <hr> | ||
− | [[SBS Roof | + | [[SBS Roof System Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''"SBS" Roof System Details'']] |
− | [[ | + | [[Main Page | <i class="fa fa-home fa"></i> Home]] |
{{Tempate:RPM Page Footer with Copyright and Current Date}} | {{Tempate:RPM Page Footer with Copyright and Current Date}} |
Latest revision as of 17:55, 27 October 2023
Division D - Construction Details
SBS | Metal Edge Termination ( Article 10.3.4.2.)
Notice to Reader | |
Images used in a Construction Detail are representative and not prescriptive, and are not necessarily drawn to scale. They are intended to support the related Standard (Ref. Division A, Article 2.2.1.2.).
The reader may link to the related Article in the detail title, or link to the Standard as it relates to a specific element in the detail. All hyperlinks are displayed blue text. |
SBS Details
1 WORK INCLUDED
- (1) Primer
- For self-adhered or torch-applied base membranes, as required by the membrane manufacturer.
- (2) Base Membrane (field)
- Torch-applied, adhered, self-adhered (as illustrated), or mechanically attached (subject to deck type and wind uplift design requirements). See Tables 9.1 and 9.2 for acceptable membrane types and securement options. See 9.3 for application requirements.
- (3) Mastic
- Applied beneath metal edge flashing. Refer to Article 10.3.4.2.
- (4) Metal Edge Flashing
- See 13.3.2 Fabrication for manufacturing requirements. See also Article 10.3.4.2., "Low Profile Edges for application standards and securement. Hemmed edges are required; a kicked-out drip edge is optional but recommended (See Article 13.1.3.5., "Fit and Finish".
- (5) Base Membrane (flashing)
- Applied to overlap metal flashing and the field base membrane.
- (6) Cap Membrane (field)
- Installed according to Part 9 requirements and sealed along the exposed edge with an un-tooled bead of membrane compatible sealant ( Article 10.3.4.2.).
2 RELATED WORK BY OTHERS
- (A) Acceptable Substrate
- Representative
- (B) Wall Assembly
- Representative
NOTE: See the Standard for additional requirements.
Back to "SBS" Roof System Details
© RCABC 2024
RoofStarTM is a registered Trademark of the RCABC.
No reproduction of this material, in whole or in part, is lawful without the expressed permission of the RCABC Guarantee Corp.