Difference between revisions of "SBS Tall Parapet"
Difference between revisions of "SBS Tall Parapet"
(→WORK INCLUDED) |
|||
(42 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
{{Template:RPM Info}} | {{Template:RPM Info}} | ||
− | { | + | {{DISPLAYTITLE:<span style="position: absolute; clip: rect(1px 1px 1px 1px); clip: rect(1px, 1px, 1px, 1px);">{{FULLPAGENAME}}</span>}} |
− | | | + | __NOTOC__ |
− | + | ||
+ | <big><big>Division D - Construction Details</big></big> | ||
+ | <hr> | ||
+ | <big><big><big><big><big>SBS | Tall Parapet ([[SBS_Roof_Systems_Standard#10.3.4.1._Parapets | Article 10.3.4.1.]])</big></big></big></big></big> | ||
+ | {{Template:Construction Details Header}} | ||
<div class="panel panel-success"> | <div class="panel panel-success"> | ||
<div class="panel-heading"><big>'''SBS Details'''</big></div> | <div class="panel-heading"><big>'''SBS Details'''</big></div> | ||
Line 11: | Line 15: | ||
[[File:10.3.1.3.jpg|class=img-responsive]] | [[File:10.3.1.3.jpg|class=img-responsive]] | ||
</div> | </div> | ||
− | |||
− | |||
::Click below for a printable version of this page. | ::Click below for a printable version of this page. | ||
Line 24: | Line 26: | ||
=== WORK INCLUDED === | === WORK INCLUDED === | ||
− | ;(1) [[SBS Roof Systems Standard# | + | ;(1) [[SBS Roof Systems Standard#PART_5|'''Supporting Deck Overlay''']]: If required by ''Design Authority''. |
− | ;(2) [[SBS Roof Systems Standard# | + | ;(2) [[SBS Roof Systems Standard#PART_6|'''Air or Vapour Control Layers''']]: If required by ''Design Authority''. |
− | ;(3) [[SBS Roof Systems Standard# | + | ;(3) [[SBS Roof Systems Standard#PART_7|'''Insulation''']]: See available insulation products in the [[Division C| Accepted Materials]] Division of this ''Manual''. |
− | ;(4) [[SBS Roof Systems Standard# | + | ;(4) [[SBS Roof Systems Standard#PART_8|'''Insulation Overlay''']]: As required. |
− | ;(5) [[SBS Roof Systems Standard# | + | ;(5) [[SBS Roof Systems Standard#PART_9|'''Primary Membrane''']]: and membrane protection (See [[SBS Roof Systems Standard#9.1.3.4. Membrane Protection | Article 9.1.3.4.]]). |
− | ;(6) [[SBS Roof Systems Standard# | + | ;(6) [[SBS Roof Systems Standard#PART_10|'''Base Membrane Flashing''']]: Mechanically fasten to parapet at termination. |
− | ;(7) [[SBS Roof Systems Standard# | + | ;(7) [[SBS Roof Systems Standard#PART_13|'''Base Metal Flashing''']]: Optional on flexible membrane systems. Required on assemblies using gravel ballast filter mats. See [[SBS Roof Systems Standard#13.3.2.3. Cap Flashing, Counter-flashing, and Reglet Flashing | Article 13.3.2.3.]] |
− | ;(8) [[SBS Roof Systems Standard# | + | ;(8) [[SBS Roof Systems Standard#PART_13|'''Metal Counter Flashing''']]: Minimum 25 mm (1") above roof surface. |
− | ;(9) [[SBS Roof Systems Standard# | + | ;(9) [[SBS Roof Systems Standard#PART_13|'''Metal Cap Flashing''']]: Required whenever the primary roof membrane flashing/stripping is carried over the top of parapet walls. See [[SBS Roof Systems Standard#13.3.2.3. Cap Flashing, Counter-flashing, and Reglet Flashing | Article 13.3.2.3.]] |
<hr> | <hr> | ||
Line 38: | Line 40: | ||
=== RELATED WORK BY OTHERS === | === RELATED WORK BY OTHERS === | ||
− | ;(A) [[SBS Roof Systems Standard# | + | ;(A) [[SBS Roof Systems Standard#PART_2|'''Acceptable Supporting Deck Structure''']] |
;(B) '''Air / Vapour Seal''' | ;(B) '''Air / Vapour Seal''' | ||
− | ;(C) [[SBS Roof Systems Standard# | + | ;(C) [[SBS Roof Systems Standard#PART_2|'''Acceptable Wall Surface''']] |
;(D) '''Wood Blocking''' | ;(D) '''Wood Blocking''' | ||
− | ;(E) [[SBS Roof Systems Standard# | + | ;(E) [[SBS Roof Systems Standard#PART_10|'''Sloped Wood Blocking''']]: Required over 100 mm (4") parapet width. |
− | ;(F) [[SBS Roof Systems Standard# | + | ;(F) [[SBS Roof Systems Standard#PART_6|'''Wall Sheathing Membrane''']]: Minimum 1 mm (0.040") self-adhered modified bitumen. |
;(G) '''Exterior Wall Finish''' | ;(G) '''Exterior Wall Finish''' | ||
− | ;(H) [[SBS Roof Systems Standard# | + | ;(H) [[SBS Roof Systems Standard#PART_13|'''Metal Cap Flashing''']]: Required by others whenever the primary roof membrane is not carried over top of the parapet and/or when the wall finish is by others. (Unless specified otherwise). |
− | ;(I) [[SBS Roof Systems Standard# | + | ;(I) [[SBS Roof Systems Standard#10|'''Cap Flashing Underlay''']]:Minimum 1 mm (0.040" or 40 mil) self-adhered modified bitumen. |
</div><!-- COL-6-MD --> | </div><!-- COL-6-MD --> | ||
</div><!-- PANEL BODY --> | </div><!-- PANEL BODY --> | ||
</div><!-- PANEL --> | </div><!-- PANEL --> | ||
− | '''NOTE''': | + | '''NOTE''': See the [[SBS Roof Systems Standard | '''Standard''']] for additional requirements. |
− | |||
<hr> | <hr> | ||
− | [[SBS Roof | + | [[SBS Roof System Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''"SBS" Roof System Details'']] |
− | [[ | + | [[Main Page | <i class="fa fa-home fa"></i> Home]] |
− | + | {{Tempate:RPM Page Footer with Copyright and Current Date}} |
Latest revision as of 17:59, 27 October 2023
Division D - Construction Details
SBS | Tall Parapet ( Article 10.3.4.1.)
Notice to Reader | |
Images used in a Construction Detail are representative and not prescriptive, and are not necessarily drawn to scale. They are intended to support the related Standard (Ref. Division A, Article 2.2.1.2.).
The reader may link to the related Article in the detail title, or link to the Standard as it relates to a specific element in the detail. All hyperlinks are displayed blue text. |
SBS Details
1 WORK INCLUDED
- (1) Supporting Deck Overlay
- If required by Design Authority.
- (2) Air or Vapour Control Layers
- If required by Design Authority.
- (3) Insulation
- See available insulation products in the Accepted Materials Division of this Manual.
- (4) Insulation Overlay
- As required.
- (5) Primary Membrane
- and membrane protection (See Article 9.1.3.4.).
- (6) Base Membrane Flashing
- Mechanically fasten to parapet at termination.
- (7) Base Metal Flashing
- Optional on flexible membrane systems. Required on assemblies using gravel ballast filter mats. See Article 13.3.2.3.
- (8) Metal Counter Flashing
- Minimum 25 mm (1") above roof surface.
- (9) Metal Cap Flashing
- Required whenever the primary roof membrane flashing/stripping is carried over the top of parapet walls. See Article 13.3.2.3.
2 RELATED WORK BY OTHERS
- (A) Acceptable Supporting Deck Structure
- (B) Air / Vapour Seal
- (C) Acceptable Wall Surface
- (D) Wood Blocking
- (E) Sloped Wood Blocking
- Required over 100 mm (4") parapet width.
- (F) Wall Sheathing Membrane
- Minimum 1 mm (0.040") self-adhered modified bitumen.
- (G) Exterior Wall Finish
- (H) Metal Cap Flashing
- Required by others whenever the primary roof membrane is not carried over top of the parapet and/or when the wall finish is by others. (Unless specified otherwise).
- (I) Cap Flashing Underlay
- Minimum 1 mm (0.040" or 40 mil) self-adhered modified bitumen.
NOTE: See the Standard for additional requirements.
Back to "SBS" Roof System Details
© RCABC 2024
RoofStarTM is a registered Trademark of the RCABC.
No reproduction of this material, in whole or in part, is lawful without the expressed permission of the RCABC Guarantee Corp.