Difference between revisions of "SBS Flanged Insert Drain"
Difference between revisions of "SBS Flanged Insert Drain"
m (James Klassen moved page SBS 11.3.2.4-1 Flange-style Drains (typical) to SBS Flanged Insert Drain) |
(→WORK INCLUDED) |
||
Line 21: | Line 21: | ||
;(1) [[SBS Roof Systems Standard#PART_5|'''Supporting Deck Overlay''']]: If required by design authority. | ;(1) [[SBS Roof Systems Standard#PART_5|'''Supporting Deck Overlay''']]: If required by design authority. | ||
;(2) [[SBS Roof Systems Standard#PART_6|'''Air or Vapour Control Layers''']]: If required by design authority. | ;(2) [[SBS Roof Systems Standard#PART_6|'''Air or Vapour Control Layers''']]: If required by design authority. | ||
− | ;(3) [[SBS Roof Systems Standard#PART_7|'''Insulation''']]: See available insulation products in the [[ | + | ;(3) [[SBS Roof Systems Standard#PART_7|'''Insulation''']]: See available insulation products in the [[Division C| Accepted Materials]] Division of this ''Manual''. |
;(4) [[SBS Roof Systems Standard#PART_8|'''Insulation Overlay''']]: Where required. | ;(4) [[SBS Roof Systems Standard#PART_8|'''Insulation Overlay''']]: Where required. | ||
;(5) [[SBS Roof Systems Standard#PART_9|'''Primary Membrane''']] and [[SBS Roof Systems Standard#PART_9| '''Membrane Protection''']] | ;(5) [[SBS Roof Systems Standard#PART_9|'''Primary Membrane''']] and [[SBS Roof Systems Standard#PART_9| '''Membrane Protection''']] | ||
;(6) '''Mastic''': As approved by manufacturer. | ;(6) '''Mastic''': As approved by manufacturer. | ||
− | ;(7) [[SBS Roof Systems Standard#PART_11|'''Roof Drain Membrane Flashing''']]: Onto primed drain flange or adhesive for non-bituminous flexible membrane systems. See also [[SBS Roof Systems Standard# | + | ;(7) [[SBS Roof Systems Standard#PART_11|'''Roof Drain Membrane Flashing''']]: Onto primed drain flange or adhesive for non-bituminous flexible membrane systems. See also [[SBS Roof Systems Standard#11.3.3.6. Flanged Insert-type Roof Drains | Article 11.3.3.6.]] |
<hr> | <hr> |
Latest revision as of 18:01, 27 October 2023
Division D - Construction Details
SBS | Flanged Insert Drain ( Article 11.3.3.6.)
Notice to Reader | |
Images used in a Construction Detail are representative and not prescriptive, and are not necessarily drawn to scale. They are intended to support the related Standard (Ref. Division A, Article 2.2.1.2.).
The reader may link to the related Article in the detail title, or link to the Standard as it relates to a specific element in the detail. All hyperlinks are displayed blue text. |
SBS Details
1 WORK INCLUDED
- (1) Supporting Deck Overlay
- If required by design authority.
- (2) Air or Vapour Control Layers
- If required by design authority.
- (3) Insulation
- See available insulation products in the Accepted Materials Division of this Manual.
- (4) Insulation Overlay
- Where required.
- (5) Primary Membrane and Membrane Protection
- (6) Mastic
- As approved by manufacturer.
- (7) Roof Drain Membrane Flashing
- Onto primed drain flange or adhesive for non-bituminous flexible membrane systems. See also Article 11.3.3.6.
2 RELATED WORK BY OTHERS
- Leader size is determined by using the calculation found in the BC Building Code at Appendix P.7.4.10 and Section 7.4.10.11 (Section 7.4.10.10 for gutters) in conjunction with the 15-minute rainfall value from the National Building Code, Appendix C.
NOTE: See the Standard for additional requirements.
Back to "SBS" Roof System Details
© RCABC 2024
RoofStarTM is a registered Trademark of the RCABC.
No reproduction of this material, in whole or in part, is lawful without the expressed permission of the RCABC Guarantee Corp.