Difference between revisions of "SBS Flanged Insert Drain (Clamping Ring)"
Difference between revisions of "SBS Flanged Insert Drain (Clamping Ring)"
(Created page with "<hr> File:D1.7.5.jpg === WORK INCLUDED === ;(1) Gypsum Board: :Required when insulation is too thin to span flutes of steel decking or as thermal barrier when specified...") |
|||
(30 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
+ | {{Template:RPM Info}} | ||
+ | |||
+ | {{DISPLAYTITLE:<span style="position: absolute; clip: rect(1px 1px 1px 1px); clip: rect(1px, 1px, 1px, 1px);">{{FULLPAGENAME}}</span>}} | ||
+ | __NOTOC__ | ||
+ | |||
+ | <big><big>Division D - Construction Details</big></big> | ||
<hr> | <hr> | ||
− | [[File:D1.7. | + | <big><big><big><big><big>SBS | Flanged Insert Drain (Clamping Ring) ([[SBS_Roof_Systems_Standard#11.3.3.6._Flanged_Insert-type_Roof_Drains | Article 11.3.3.6.]])</big></big></big></big></big> |
+ | {{Template:Construction Details Header}} | ||
+ | <div class="panel panel-success"> | ||
+ | <div class="panel-heading"><big>'''SBS Details'''</big></div> | ||
+ | <div class="panel-body"> | ||
+ | <div class="col-md-6"> | ||
+ | <div style="text-align:center; vertical-align:center"> | ||
+ | [[File:D1.7.8-3.jpg| link=http://rpm.rcabc.org/images/a/a0/D1.7.8-3.jpg | class=img-responsive]] | ||
+ | </div> | ||
+ | |||
+ | </div><!-- COL-MD-6 --> | ||
+ | <div class="col-md-6"> | ||
=== WORK INCLUDED === | === WORK INCLUDED === | ||
− | ;(1) | + | ;(1) [[SBS Roof Systems Standard#PART_5|'''Supporting Deck Overlay''']]: Required when insulation is too thin to span flutes of steel decking or when required as thermal barrier by design authority. |
− | :Required when insulation is too thin to span flutes of steel decking or as thermal barrier | + | ;(2) [[SBS Roof Systems Standard#PART_6|'''Air or Vapour Control Layers''']]: If required by design authority. |
− | ;(2) | + | ;(3) [[SBS Roof Systems Standard#PART_7|'''Insulation''']]: Mechanically fastened. See available insulation products in the [[Division C| Accepted Materials]] Division of this ''Manual''. |
− | :If required by design authority. | + | ;(4) [[SBS Roof Systems Standard#PART_8|'''Insulation Overlay''']]: Asphalt adhered or mechanically fastened. Two layers required over heat-sensitive insulation. |
− | ;(3) Insulation | + | ;(5) [[SBS Roof Systems Standard#PART_9|'''Field Base Membrane''']]: Adhered to overlay board using asphalt, cold adhesive, self-adhered, mechanical attachment or torch applied according to manufacturer's specification and to <i>RoofStar Guarantee Standards</i>. Torching directly to wood surfaces is not permitted. |
− | :Mechanically fastened | + | ;(6) '''Mastic''': Compatible mastic accepted by the membrane manufacturer. |
− | ;(4) Overlay | + | ;(7) [[SBS Roof Systems Standard#PART_10|'''Base Membrane Flashing''']]: Adhered according to manufacturer's specifications and to <i>RoofStar Guarantee Standards.</i> |
− | :Asphalt adhered or mechanically fastened. Two layers required over heat-sensitive insulation. | + | ;(8) [[SBS Roof Systems Standard#PART_9|'''Field Cap Membrane''']]: Applied according to manufacturer's printed instructions and to <i>RoofStar Guarantee Standards</i>. |
− | ;(5) Base | ||
− | :Adhered to overlay board using asphalt, cold adhesive, self-adhered, mechanical attachment or torch applied according to manufacturer | ||
− | ;(6) Mastic | ||
− | :Compatible mastic accepted by the membrane manufacturer. | ||
− | ;(7) Base | ||
− | :Adhered according to manufacturer | ||
− | ;(8) Cap | ||
− | :Applied according to manufacturer | ||
+ | <hr> | ||
=== RELATED WORK BY OTHERS === | === RELATED WORK BY OTHERS === | ||
− | (A) Acceptable Deck | + | ;(A) [[SBS Roof Systems Standard#PART_2|'''Acceptable Supporting Deck Structure''']] |
− | (B) Clamping Copper Drain: | + | ;(B) [[SBS Roof Systems Standard#PART_11|'''Clamping Copper Drain''']]: Primed and mechanically fastened. Installed in bed of compatible mastic. |
− | Primed and mechanically fastened. Installed in bed of compatible mastic. | ||
− | + | * Leader size is determined by design authority using the calculation found in the BC Building Code at Appendix P.7.4.10 and Section 7.4.10.11 (Section 7.4.10.10 for gutters) in conjunction with the 15 minute rainfall value from the National Building Code, Appendix C. | |
− | + | </div><!-- COL-6-MD --> | |
− | + | </div><!-- PANEL BODY --> | |
+ | </div><!-- PANEL --> | ||
+ | |||
+ | '''NOTE''': See the [[SBS Roof Systems Standard | '''Standard''']] for additional requirements. | ||
<hr> | <hr> | ||
+ | [[SBS Roof System Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''"SBS" Roof System Details'']] | ||
+ | [[Main Page | <i class="fa fa-home fa"></i> Home]] | ||
− | + | {{Tempate:RPM Page Footer with Copyright and Current Date}} | |
− | |||
− | |||
− | |||
− |
Latest revision as of 18:14, 27 October 2023
Division D - Construction Details
SBS | Flanged Insert Drain (Clamping Ring) ( Article 11.3.3.6.)
Notice to Reader | |
Images used in a Construction Detail are representative and not prescriptive, and are not necessarily drawn to scale. They are intended to support the related Standard (Ref. Division A, Article 2.2.1.2.).
The reader may link to the related Article in the detail title, or link to the Standard as it relates to a specific element in the detail. All hyperlinks are displayed blue text. |
SBS Details
1 WORK INCLUDED
- (1) Supporting Deck Overlay
- Required when insulation is too thin to span flutes of steel decking or when required as thermal barrier by design authority.
- (2) Air or Vapour Control Layers
- If required by design authority.
- (3) Insulation
- Mechanically fastened. See available insulation products in the Accepted Materials Division of this Manual.
- (4) Insulation Overlay
- Asphalt adhered or mechanically fastened. Two layers required over heat-sensitive insulation.
- (5) Field Base Membrane
- Adhered to overlay board using asphalt, cold adhesive, self-adhered, mechanical attachment or torch applied according to manufacturer's specification and to RoofStar Guarantee Standards. Torching directly to wood surfaces is not permitted.
- (6) Mastic
- Compatible mastic accepted by the membrane manufacturer.
- (7) Base Membrane Flashing
- Adhered according to manufacturer's specifications and to RoofStar Guarantee Standards.
- (8) Field Cap Membrane
- Applied according to manufacturer's printed instructions and to RoofStar Guarantee Standards.
2 RELATED WORK BY OTHERS
- (A) Acceptable Supporting Deck Structure
- (B) Clamping Copper Drain
- Primed and mechanically fastened. Installed in bed of compatible mastic.
- Leader size is determined by design authority using the calculation found in the BC Building Code at Appendix P.7.4.10 and Section 7.4.10.11 (Section 7.4.10.10 for gutters) in conjunction with the 15 minute rainfall value from the National Building Code, Appendix C.
NOTE: See the Standard for additional requirements.
Back to "SBS" Roof System Details
© RCABC 2024
RoofStarTM is a registered Trademark of the RCABC.
No reproduction of this material, in whole or in part, is lawful without the expressed permission of the RCABC Guarantee Corp.