Difference between revisions of "SBS Fall Protection Anchor in Roof"

Jump to: navigation, search

Difference between revisions of "SBS Fall Protection Anchor in Roof"

(WORK INCLUDED)
 
(7 intermediate revisions by the same user not shown)
Line 1: Line 1:
 
{{Template:RPM Info}}
 
{{Template:RPM Info}}
 +
 +
{{DISPLAYTITLE:<span style="position: absolute; clip: rect(1px 1px 1px 1px); clip: rect(1px, 1px, 1px, 1px);">{{FULLPAGENAME}}</span>}}
 +
__NOTOC__
 +
 +
<big><big>Division D - Construction Details</big></big>
 
<hr>
 
<hr>
{| class="wikitable" | style="color: black; background-color: orange; width: 100%;text-align:center"
+
<big><big><big><big><big>SBS | Fall Protection Anchor in Roof ([[SBS_Roof_Systems_Standard#12.3.2.1._General_Requirements_for_Flashing_Penetrations | Article 12.3.2.1.]])</big></big></big></big></big>
| colspan="2"  | <big>'''''Notice to Reader'''''</big>
+
{{Template:Construction Details Header}}
|-
+
 
| style="color: black; background-color: #ffffcc; width: 100%;text-align:center" | Images used in a Construction Detail are representative and not prescriptive. Nor are they necessarily drawn to scale. Rather, they are provided to visually convey the requirements of the Standard they represent. Unless otherwise required by the Standard, dimensions, the selection of materials and their application remains the responsibility of the ''Design Authority''.<br><br>The full text of the referenced requirements in the [[SBS Roof Systems Standard | '''Standard''']] may be read by using the <span style="color:#6495ed">'''blue hyperlinks'''</span>
 
|}
 
 
<div class="panel panel-success">
 
<div class="panel panel-success">
 
<div class="panel-heading"><big>'''SBS Details'''</big></div>
 
<div class="panel-heading"><big>'''SBS Details'''</big></div>
Line 11: Line 14:
 
<div class="col-md-6">
 
<div class="col-md-6">
 
<div style="text-align:center; vertical-align:center">
 
<div style="text-align:center; vertical-align:center">
[[File:10.3.7.1.jpg|class=img-responsive]]
+
[[File:10.3.7.1.jpg| link=http://rpm.rcabc.org/images/a/a0/10.3.7.1.jpg | class=img-responsive]]
 
</div>
 
</div>
 
</div><!-- COL-MD-6 -->
 
</div><!-- COL-MD-6 -->
Line 19: Line 22:
 
;(1) '''Flashing''': 0.08 mm (0.032", 20 gauge) Aluminum or 0.56 mm (16 oz) copper to CSA B272-93 flashing supplied by anchor manufacturer with flanges sealed by roofer.
 
;(1) '''Flashing''': 0.08 mm (0.032", 20 gauge) Aluminum or 0.56 mm (16 oz) copper to CSA B272-93 flashing supplied by anchor manufacturer with flanges sealed by roofer.
 
;(2) '''Flashing Flange''': minimum 100 mm (4") flange set in coating of compatible sealant.
 
;(2) '''Flashing Flange''': minimum 100 mm (4") flange set in coating of compatible sealant.
;(3) [[SBS Roof Systems Standard#SBSBASE|'''Primary Membrane''']] and [[RoofStar Guarantee Standards for SBS Roof Systems#SBSSTRIPFLASH|'''Membrane Flashing''']].
+
;(3) [[SBS Roof Systems Standard#PART_9|'''Primary Membrane''']] and [[RoofStar Guarantee Standards for SBS Roof Systems#SBSSTRIPFLASH|'''Membrane Flashing''']].
;(4) [[SBS Roof Systems Standard#SBSPMRA|'''Protected Membrane Roof Assembly''']]: Flashing to extend a minimum 200 mm (8") above finished roof surface (pavers, ballast, or walkways).  See [[SBS Roof Systems Standard#SBSPMRAMEMBRANE | '''12.1.3.2 Membranes''' for specific Application requirements.
+
;(4) [[SBS Roof Systems Standard#PART_12|'''Protected Membrane Roof Assembly''']]: Flashing to extend a minimum 200 mm (8") above finished roof surface (pavers, ballast, or walkways).  See [[SBS Roof Systems Standard#PART_12 | '''12.1.3.2 Membranes''' for specific Application requirements.
;(5) [[SBS Roof Systems Standard#SBSCONVENTIONAL|'''Conventional Roof Assembly''']]: Flashing to extend a minimum 200 mm (8") above finished roof surface.  See membrane flashing requirements under [[RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies#SBS-STRIPPING|'''10.3 Application''']].
+
;(5) [[SBS Roof Systems Standard#PART_1|'''Conventional Roof Assembly''']]: Flashing to extend a minimum 200 mm (8") above finished roof surface.  See membrane flashing requirements under [[RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies#PART_10|'''10.3 Application''']].
;(6) [[SBS Roof Systems Standard#SBSINSULATION|'''Insulation''']]: See available insulation products in the [[Roof Deck Insulation|'''Accepted Materials''']] section of this Manual.
+
;(6) [[SBS Roof Systems Standard#PART_7|'''Insulation''']]: See available insulation products in the [[Division C| Accepted Materials]] Division of this ''Manual''.
  
 
<hr>
 
<hr>
  
 
=== WORK BY OTHERS ===
 
=== WORK BY OTHERS ===
;(A) [[SBS Roof Systems Standard#SBSDECKS|'''Acceptable Supporting Deck Structure''']]: Concrete slab shown, see anchor manufacturer's attachment details for other deck types.
+
;(A) [[SBS Roof Systems Standard#PART_2|'''Acceptable Supporting Deck Structure''']]: Concrete slab shown, see anchor manufacturer's attachment details for other deck types.
 
;(B) '''Roof Anchor''': Anchor selection and attachment details are the responsibility of the Design Authority
 
;(B) '''Roof Anchor''': Anchor selection and attachment details are the responsibility of the Design Authority
 
;(C) '''Anchor Eye'''
 
;(C) '''Anchor Eye'''
Line 39: Line 42:
 
<hr>
 
<hr>
  
[[SBS Roof System Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''SBS-modified Bitumen Membrane Roof System Details'']]
+
[[SBS Roof System Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''"SBS" Roof System Details'']]
  
 
[[Main Page | <i class="fa fa-home fa"></i> Home]]
 
[[Main Page | <i class="fa fa-home fa"></i> Home]]
  
 
{{Tempate:RPM Page Footer with Copyright and Current Date}}
 
{{Tempate:RPM Page Footer with Copyright and Current Date}}

Latest revision as of 18:16, 27 October 2023



Division D - Construction Details


SBS | Fall Protection Anchor in Roof ( Article 12.3.2.1.)

Notice to Reader
Images used in a Construction Detail are representative and not prescriptive, and are not necessarily drawn to scale. They are intended to support the related Standard (Ref. Division A, Article 2.2.1.2.).

The reader may link to the related Article in the detail title, or link to the Standard as it relates to a specific element in the detail. All hyperlinks are displayed blue text.

SBS Details

10.3.7.1.jpg

1 WORK INCLUDED

(1) Flashing
0.08 mm (0.032", 20 gauge) Aluminum or 0.56 mm (16 oz) copper to CSA B272-93 flashing supplied by anchor manufacturer with flanges sealed by roofer.
(2) Flashing Flange
minimum 100 mm (4") flange set in coating of compatible sealant.
(3) Primary Membrane and Membrane Flashing.
(4) Protected Membrane Roof Assembly
Flashing to extend a minimum 200 mm (8") above finished roof surface (pavers, ballast, or walkways). See [[SBS Roof Systems Standard#PART_12 | 12.1.3.2 Membranes for specific Application requirements.
(5) Conventional Roof Assembly
Flashing to extend a minimum 200 mm (8") above finished roof surface. See membrane flashing requirements under 10.3 Application.
(6) Insulation
See available insulation products in the Accepted Materials Division of this Manual.

2 WORK BY OTHERS

(A) Acceptable Supporting Deck Structure
Concrete slab shown, see anchor manufacturer's attachment details for other deck types.
(B) Roof Anchor
Anchor selection and attachment details are the responsibility of the Design Authority
(C) Anchor Eye
(D) Water Tight Cap

NOTE: See the Standard for additional requirements.


Back to "SBS" Roof System Details

Home

© RCABC 2024
RoofStarTM is a registered Trademark of the RCABC.
No reproduction of this material, in whole or in part, is lawful without the expressed permission of the RCABC Guarantee Corp.