Difference between revisions of "SBS Equipment Sleeper"
Difference between revisions of "SBS Equipment Sleeper"
(→WORK INCLUDED) |
|||
(5 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
{{Template:RPM Info}} | {{Template:RPM Info}} | ||
+ | |||
+ | {{DISPLAYTITLE:<span style="position: absolute; clip: rect(1px 1px 1px 1px); clip: rect(1px, 1px, 1px, 1px);">{{FULLPAGENAME}}</span>}} | ||
+ | __NOTOC__ | ||
+ | |||
+ | <big><big>Division D - Construction Details</big></big> | ||
<hr> | <hr> | ||
− | + | <big><big><big><big><big>SBS | Equipment Sleeper ([[SBS_Roof_Systems_Standard#12.3.2.4._Curbs.2C_Sleepers.2C_and_Equipment_Pads | Article 12.3.2.4.]])</big></big></big></big></big> | |
− | + | {{Template:Construction Details Header}} | |
− | | | ||
− | |||
− | |||
<div class="panel panel-success"> | <div class="panel panel-success"> | ||
<div class="panel-heading"><big>'''SBS Details'''</big></div> | <div class="panel-heading"><big>'''SBS Details'''</big></div> | ||
Line 17: | Line 19: | ||
<div class="col-md-6"> | <div class="col-md-6"> | ||
=== WORK INCLUDED === | === WORK INCLUDED === | ||
− | ;(1) [[SBS Roof Systems Standard# | + | ;(1) [[SBS Roof Systems Standard#PART_5|'''Supporting Deck Overlay''']]: If required by design authority. |
− | ;(2) [[SBS Roof Systems Standard# | + | ;(2) [[SBS Roof Systems Standard#PART_6|'''Air or Vapour Control Layers''']]: If required by design authority. |
− | ;(3) [[SBS Roof Systems Standard# | + | ;(3) [[SBS Roof Systems Standard#PART_7|'''Insulation''']]: See available insulation products in the [[Division C| Accepted Materials]] Division of this ''Manual''. |
− | ;(4) [[SBS Roof Systems Standard# | + | ;(4) [[SBS Roof Systems Standard#PART_8|'''Insulation Overlay''']]: As required. |
− | ;(5) [[SBS Roof Systems Standard# | + | ;(5) [[SBS Roof Systems Standard#PART_9|'''Primary Membrane''']]: Also see membrane protection in [[SBS Roof Systems Standard#9.3.2.7. Protection of Membranes| Article 9.3.2.7.]] |
− | ;(6) [[SBS Roof Systems Standard# | + | ;(6) [[SBS Roof Systems Standard#PART_10|'''Membrane Flashing''']]: Lap one ply from each side over top of sleeper (C) and mechanically fasten. |
;(7) '''Alternate Cap Flashing''': May be used instead of lapping membrane flashing over sleeper. | ;(7) '''Alternate Cap Flashing''': May be used instead of lapping membrane flashing over sleeper. | ||
− | ;(8) [[SBS Roof Systems Standard# | + | ;(8) [[SBS Roof Systems Standard#PART_13|'''Metal Base Flashing''']]: Mechanically fasten to top of wood blocking, standing seam at corners, optional on flexible membrane systems.<b> </b>Optional on flexible membrane systems. Required on assemblies using gravel ballast filter mats. |
− | ;(9) [[SBS Roof Systems Standard# | + | ;(9) [[SBS Roof Systems Standard#PART_13|'''Metal Cap Flashing''']] |
:NOTE: (8) and (9) may be one piece. | :NOTE: (8) and (9) may be one piece. | ||
Line 31: | Line 33: | ||
=== RELATED WORK BY OTHERS === | === RELATED WORK BY OTHERS === | ||
− | ;(A) [[SBS Roof Systems Standard# | + | ;(A) [[SBS Roof Systems Standard#PART_2|'''Acceptable Supporting Deck Structure''']] |
− | ;(B) [[SBS Roof Systems Standard# | + | ;(B) [[SBS Roof Systems Standard#PART_6|'''Air and Vapour Control Layer Seal''']] |
− | ;(C) [[SBS Roof Systems Standard# | + | ;(C) [[SBS Roof Systems Standard#PART_11|'''Wood Blocking/Sleeper''']]: Minimum 150 mm (6") thick, minimum 100 mm (4") above finished roof surface. |
</div><!-- COL-6-MD --> | </div><!-- COL-6-MD --> | ||
</div><!-- PANEL BODY --> | </div><!-- PANEL BODY --> |
Latest revision as of 18:21, 27 October 2023
Division D - Construction Details
SBS | Equipment Sleeper ( Article 12.3.2.4.)
Notice to Reader | |
Images used in a Construction Detail are representative and not prescriptive, and are not necessarily drawn to scale. They are intended to support the related Standard (Ref. Division A, Article 2.2.1.2.).
The reader may link to the related Article in the detail title, or link to the Standard as it relates to a specific element in the detail. All hyperlinks are displayed blue text. |
SBS Details
1 WORK INCLUDED
- (1) Supporting Deck Overlay
- If required by design authority.
- (2) Air or Vapour Control Layers
- If required by design authority.
- (3) Insulation
- See available insulation products in the Accepted Materials Division of this Manual.
- (4) Insulation Overlay
- As required.
- (5) Primary Membrane
- Also see membrane protection in Article 9.3.2.7.
- (6) Membrane Flashing
- Lap one ply from each side over top of sleeper (C) and mechanically fasten.
- (7) Alternate Cap Flashing
- May be used instead of lapping membrane flashing over sleeper.
- (8) Metal Base Flashing
- Mechanically fasten to top of wood blocking, standing seam at corners, optional on flexible membrane systems. Optional on flexible membrane systems. Required on assemblies using gravel ballast filter mats.
- (9) Metal Cap Flashing
- NOTE: (8) and (9) may be one piece.
2 RELATED WORK BY OTHERS
- (A) Acceptable Supporting Deck Structure
- (B) Air and Vapour Control Layer Seal
- (C) Wood Blocking/Sleeper
- Minimum 150 mm (6") thick, minimum 100 mm (4") above finished roof surface.
NOTE: See the Standard for additional requirements.
Back to "SBS" Roof System Details
© RCABC 2024
RoofStarTM is a registered Trademark of the RCABC.
No reproduction of this material, in whole or in part, is lawful without the expressed permission of the RCABC Guarantee Corp.