Difference between revisions of "SBS Structural Planter"
Difference between revisions of "SBS Structural Planter"
(→RELATED WORK BY OTHERS) |
|||
(27 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
− | { | + | {{Template:RPM Info}} |
− | | | + | |
− | + | {{DISPLAYTITLE:<span style="position: absolute; clip: rect(1px 1px 1px 1px); clip: rect(1px, 1px, 1px, 1px);">{{FULLPAGENAME}}</span>}} | |
+ | __NOTOC__ | ||
+ | |||
+ | <big><big>Division D - Construction Details</big></big> | ||
+ | <hr> | ||
+ | <big><big><big><big><big>SBS | Structural Planter ([[SBS_Roof_Systems_Standard#14.3.2.7._Structures_and_Equipment | Article 14.3.2.7.]])</big></big></big></big></big> | ||
+ | {{Template:Construction Details Header}} | ||
<div class="panel panel-success"> | <div class="panel panel-success"> | ||
<div class="panel-heading"><big>'''SBS Details'''</big></div> | <div class="panel-heading"><big>'''SBS Details'''</big></div> | ||
Line 7: | Line 13: | ||
<div class="col-md-6"> | <div class="col-md-6"> | ||
<div style="text-align:center; vertical-align:center"> | <div style="text-align:center; vertical-align:center"> | ||
− | [[File:D1.7. | + | [[File:D1.7.6-5 (1).jpg| link=http://rpm.rcabc.org/images/5/51/D1.7.6-5_%281%29.jpg | class=img-responsive]] |
− | [[File:D1.7. | + | [[File:D1.7.6-5 (2).jpg| link=http://rpm.rcabc.org/images/c/ca/D1.7.6-5_%282%29.jpg | class=img-responsive]] |
</div> | </div> | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
</div><!-- COL-MD-6 --> | </div><!-- COL-MD-6 --> | ||
Line 26: | Line 23: | ||
=== WORK INCLUDED === | === WORK INCLUDED === | ||
;(1) '''Primer''': Application method and coverage rate as approved by Primary Membrane Manufacturer. | ;(1) '''Primer''': Application method and coverage rate as approved by Primary Membrane Manufacturer. | ||
− | ;(2) [[ | + | ;(2) [[SBS Roof Systems Standard#PART_9|'''Primary Roof Membrane''']]: Modified Bituminous base and cap sheet membranes installed as per manufacturer's published application specifications. |
− | ;(3) [[ | + | ;(3) [[SBS Roof Systems Standard#PART_14|'''Pre-Curb (Start-Up Curb) Membrane Flashing''']]: Modified Bituminous base and cap sheet membrane flashing installed as per manufacturer's published application specifications. |
− | ;(4) | + | ;(4) [[SBS Roof Systems Standard#PART_10|'''Proprietary Liquid Membrane Flashing''']]: RoofStar Guarantee Program accepted Liquid Membrane Flashing System(s) or hot melt SBS modified bitumen. (NOTE: Refer to '''Liquid Membrane Flashing Systems''' in Division C of this Manual). Install as per Manufacturer's published instructions. |
− | ;(5) [[ | + | ;(5) [[SBS Roof Systems Standard#PART_14|'''Inside Planter Wall Membrane Flashing''']]: Adhered according to manufacturer's specifications using cold adhesive, self-adhered or torch-applied membrane. Torching directly to wood surfaces is not permitted. Carry membrane flashing plies to reglet termination near top of planter wall (stagger membrane seal minimum 300mm (6"). |
− | ;(6) [[ | + | ;(6) [[SBS Roof Systems Standard#PART_13|'''Reglet - Metal Counter Flashing''']]: As required by the ''RoofStar Guarantee Standards''. Note that a coping flashing may be paired with the reglet flashing, as illustrated. |
;(7) '''Plaza Deck / Planter Interior Assembly''': Extruded polystyrene insulation and filter mat over primary roof membranes. Concrete pavers placed above pre-curb membrane flashing height, on proprietary pedestals. Note: membrane flashing is not permitted above pre-curb membrane flashing on plaza deck side of planter walls. | ;(7) '''Plaza Deck / Planter Interior Assembly''': Extruded polystyrene insulation and filter mat over primary roof membranes. Concrete pavers placed above pre-curb membrane flashing height, on proprietary pedestals. Note: membrane flashing is not permitted above pre-curb membrane flashing on plaza deck side of planter walls. | ||
Line 36: | Line 33: | ||
=== RELATED WORK BY OTHERS === | === RELATED WORK BY OTHERS === | ||
− | ;(A) [[ | + | ;(A) [[SBS Roof Systems Standard#PART_2|'''Acceptable Supporting Deck Structure''']]: Concrete slab shown. Each planter area must have a drain through the roof deck. |
;(B) '''Pre-Curb''': Minimum of 100mm (4") in height above concrete deck, smooth dry and clean. | ;(B) '''Pre-Curb''': Minimum of 100mm (4") in height above concrete deck, smooth dry and clean. | ||
;(C) '''Cast over Concrete Planter Wall''': Form on top of membrane sealed Pre-curbs or Start-up curbs. | ;(C) '''Cast over Concrete Planter Wall''': Form on top of membrane sealed Pre-curbs or Start-up curbs. | ||
− | ;(D) '''Re-Bar''': Placed | + | ;(D) '''Re-Bar''': Placed at centre of Pre-curb. |
− | ;(E) [[ | + | ;(E) [[SBS Roof Systems Standard#PART_13|'''Reglet''']]: Premanufactured purpose-made reglet cast in concrete wall or saw-cut. |
;(F) '''Alternate Termination''': Horizontal Reglet alternative to pre-manufactured purpose-made reglet, cast in concrete wall or saw-cut on vertical surface of inside planter walls. | ;(F) '''Alternate Termination''': Horizontal Reglet alternative to pre-manufactured purpose-made reglet, cast in concrete wall or saw-cut on vertical surface of inside planter walls. | ||
</div><!-- COL-6-MD --> | </div><!-- COL-6-MD --> | ||
Line 46: | Line 43: | ||
</div><!-- PANEL --> | </div><!-- PANEL --> | ||
− | '''NOTE''': | + | '''NOTE''': See the [[SBS Roof Systems Standard | '''Standard''']] for additional requirements. |
− | |||
<hr> | <hr> | ||
+ | [[SBS Roof System Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''"SBS" Roof System Details'']] | ||
− | [[ | + | [[Main Page | <i class="fa fa-home fa"></i> Home]] |
− | |||
− | |||
− | + | {{Tempate:RPM Page Footer with Copyright and Current Date}} |
Latest revision as of 18:21, 27 October 2023
Division D - Construction Details
SBS | Structural Planter ( Article 14.3.2.7.)
Notice to Reader | |
Images used in a Construction Detail are representative and not prescriptive, and are not necessarily drawn to scale. They are intended to support the related Standard (Ref. Division A, Article 2.2.1.2.).
The reader may link to the related Article in the detail title, or link to the Standard as it relates to a specific element in the detail. All hyperlinks are displayed blue text. |
SBS Details
1 WORK INCLUDED
- (1) Primer
- Application method and coverage rate as approved by Primary Membrane Manufacturer.
- (2) Primary Roof Membrane
- Modified Bituminous base and cap sheet membranes installed as per manufacturer's published application specifications.
- (3) Pre-Curb (Start-Up Curb) Membrane Flashing
- Modified Bituminous base and cap sheet membrane flashing installed as per manufacturer's published application specifications.
- (4) Proprietary Liquid Membrane Flashing
- RoofStar Guarantee Program accepted Liquid Membrane Flashing System(s) or hot melt SBS modified bitumen. (NOTE: Refer to Liquid Membrane Flashing Systems in Division C of this Manual). Install as per Manufacturer's published instructions.
- (5) Inside Planter Wall Membrane Flashing
- Adhered according to manufacturer's specifications using cold adhesive, self-adhered or torch-applied membrane. Torching directly to wood surfaces is not permitted. Carry membrane flashing plies to reglet termination near top of planter wall (stagger membrane seal minimum 300mm (6").
- (6) Reglet - Metal Counter Flashing
- As required by the RoofStar Guarantee Standards. Note that a coping flashing may be paired with the reglet flashing, as illustrated.
- (7) Plaza Deck / Planter Interior Assembly
- Extruded polystyrene insulation and filter mat over primary roof membranes. Concrete pavers placed above pre-curb membrane flashing height, on proprietary pedestals. Note: membrane flashing is not permitted above pre-curb membrane flashing on plaza deck side of planter walls.
2 RELATED WORK BY OTHERS
- (A) Acceptable Supporting Deck Structure
- Concrete slab shown. Each planter area must have a drain through the roof deck.
- (B) Pre-Curb
- Minimum of 100mm (4") in height above concrete deck, smooth dry and clean.
- (C) Cast over Concrete Planter Wall
- Form on top of membrane sealed Pre-curbs or Start-up curbs.
- (D) Re-Bar
- Placed at centre of Pre-curb.
- (E) Reglet
- Premanufactured purpose-made reglet cast in concrete wall or saw-cut.
- (F) Alternate Termination
- Horizontal Reglet alternative to pre-manufactured purpose-made reglet, cast in concrete wall or saw-cut on vertical surface of inside planter walls.
NOTE: See the Standard for additional requirements.
Back to "SBS" Roof System Details
© RCABC 2024
RoofStarTM is a registered Trademark of the RCABC.
No reproduction of this material, in whole or in part, is lawful without the expressed permission of the RCABC Guarantee Corp.