Difference between revisions of "Draft CD 6"

Jump to: navigation, search

Difference between revisions of "Draft CD 6"

(Created page with "{| class="wikitable" | style="color: black; background-color: orange; width: 100%;text-align:center" | colspan="2" | <big>'''''RoofStar Guarantee Standards''''' are <span sty...")
 
(WORK INCLUDED)
 
(15 intermediate revisions by the same user not shown)
Line 1: Line 1:
{| class="wikitable" | style="color: black; background-color: orange; width: 100%;text-align:center"
+
 
| colspan="2| <big>'''''RoofStar Guarantee Standards''''' are <span style="color:#6495ed">'''blue-linked'''</span></big>
+
 
|}
+
{{DISPLAYTITLE:<span style="position: absolute; clip: rect(1px 1px 1px 1px); clip: rect(1px, 1px, 1px, 1px);">{{FULLPAGENAME}}</span>}}
 +
__NOTOC__
 +
 
 +
<big><big>Division D - Construction Details</big></big>
 +
<hr>
 +
<big><big><big><big><big>EPDM | Membrane Termination F (Wall) ([[EPDM_Roof_Systems_Standard#10.3.2.3._General_Application_Requirements_for_Perimeters_and_Walls | Article 10.3.2.3.]])</big></big></big></big></big>
 +
{{Template:Construction Details Header}}
 
<div class="panel panel-success">
 
<div class="panel panel-success">
<div class="panel-heading"><big>'''SBS Details'''</big></div>
+
<div class="panel-heading"><big>'''EPDM Details'''</big></div>
 
<div class="panel-body">
 
<div class="panel-body">
 
<div class="col-md-6">
 
<div class="col-md-6">
 
<div style="text-align:center; vertical-align:center">
 
<div style="text-align:center; vertical-align:center">
[[File:10.3.2.2.jpg|class=img-responsive]]
+
<br>
 +
[[File:10.3.2.3.-EPDM-F.png|class=img-responsive | link=https://rpm.rcabc.org/images/d/d3/10.3.2.3.-EPDM-F.png]]
 +
:Drawing NTS
 
</div>
 
</div>
 
+
</div><!-- COL-6-MD -->
 
 
 
 
::Click below for a printable version of this page.
 
 
 
<div style="width:150px; text-align: left;">
 
:[[File:Pdf.png|100 px|link=|'''Print Sheet''']]
 
</div>
 
</div><!-- COL-MD-6 -->
 
  
 
<div class="col-md-6">
 
<div class="col-md-6">
 
=== WORK INCLUDED ===
 
=== WORK INCLUDED ===
;(1) [[RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies#SBSAIRVAPOUR|'''Air or Vapour Control Layers''']]: If required by design authority
 
;(2) [[RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies#SBSINSULATION|'''Insulation''']]: See available insulation products in the [[Roof Deck Insulation|'''Accepted Materials''']] section of this Manual.
 
;(3) [[RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies#SBSINSULATIONOVERLAY|'''Insulation Overlay''']]: Where required.
 
;(4) [[RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies#SBSBASE|'''Primary Membrane''']] and [[RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies#SBSPROTECTION| '''Membrane Protection''']]: Mechanically fasten to outside face of fascia (C).
 
;(5) '''Mastic''': Trowel coating of compatible mastic.
 
;(6) [[RoofStar Guarantee Standards for SBS Modified Bitumen Membrane Systems#SBSEDGE|'''Metal Edge/Gravel-stop Flashing''']]: Flashing must have a minimum 100 mm (4") flange that extends onto roof base membrane.  A flush termination is permissible and more common than a "gravel stop" (see '''10.3.5.2 Metal Edge Terminations''' for application standards). Where a gravel-stop upstand is desirable (shown in the detail at left), it must not be higher than 25 mm (1") high. 
 
  
:Embed the flashing in mastic and mechanically fasten alternately between centre and edge of flange at 100 mm (4") O.CLengths of flashing may be joined end-to-end with an overlap no less than 100 mm (4").
+
;(1) [[EPDM Roof Systems Standard#PART_6|<big>Air/Vapour Control Layers</big>]]:
;(7) [[RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies#SBS-STRIPPING|'''Membrane Flashing''']]: Asphalt and gravel roofing systems, 2 overlapping plies of a minimum 2 mm reinforced SBS modified bitumen base sheet. For flexible membrane systems, refer to manufacturer&#8217;s application details and ''RoofStar Guarantee Standards''.
+
:As specified by the ''Design Authority'' and installed to provide continuity for optimal control.
;(8) '''Asphalt'''For asphalt and gravel built-up roofing systems only.
+
;(2) [[EPDM Roof Systems Standard#PART_7|<big>Insulation</big>]]:
;(9) '''Gravel''': For asphalt and gravel built-up roofing systems only.
+
:Installed in keeping with Section 7.3.  Multiple layering illustrated; layers must be offset and staggered at least 304.8 mm (12”) in each direction.
 +
;(3) [[EPDM Roof Systems Standard#PART_8|<big>Insulation Overlay Panel</big>]]:
 +
:Required for fully adhered membrane systems or when overburden is specified.  Panels must be offset and staggered from underlying insulation panels.
 +
;(4) [[EPDM Roof Systems Standard#PART_9|<big>Field Membrane</big>]]:
 +
:See Table 9.2. for permissible application methods and corresponding membrane propertiesMembrane must be installed according to the requirements in Section 9.3.
 +
;(5) [[EPDM Roof Systems Standard#PART_10|<big>Edge Securement</big>]]:
 +
:Proprietary to the membrane manufacturer.  Edge securement is required, irrespective of how the membrane is applied (i.e., adhered, self-adhered, mechanically fastened).
 +
;(6) [[EPDM Roof Systems Standard#PART_10|<big>Mechanical Fastening</big>]]:
 +
:Edge securement must be anchored to the roof structure to prevent membrane movement.
 +
;(7) [[EPDM Roof Systems Standard#PART_10|<big>Primer or Adhesive</big>]]:
 +
:Proprietary to the membrane manufacturer.  Primer may be required for self-adhered membranes; adhesive is required for all other applications.  All membranes applied to the vertical substrate must be fully adhered.
 +
;(8) [[EPDM Roof Systems Standard#PART_10|<big>Membrane Flashing</big>]]:
 +
:May be run continuously up the vertical substrate from the field or installed as separate flashing (see membrane manufacturer requirements).  Membrane shall be carried up the vertical substrate at least 203.2 mm (8”) above the ''finished roof system surface'', plus at least 76.2 mm (3”) for wall control layer overlap. In regions where heavy snow accumulation is possible, or to accommodate future roof membrane replacement, membrane should be carried at least 304.8 mm (12”) up the vertical substrate.
 +
;(9) [[EPDM Roof Systems Standard#PART_10|<big>Primary Surface Reglet Counter-flashing and Sealant</big>]]:
 +
:Surface reglet counter-flashing with tooled sealant shown at top edge of flashing. In this illustration, the linear metal flashing serves to secure the membrane.  All membranes applied to a vertical surface must be mechanically fastened.
 +
;(10) [[EPDM Roof Systems Standard#PART_10|<big>Secondary Surface Reglet Counter-flashing and Sealant</big>]]:
 +
:Surface reglet counter-flashing with bead of sealant applied in reglet cut.  This flashing provides secondary protection for the primary surface reglet/counter-flashing and safe-guards the sealant from weather-induced deterioration and mechanical damage.
  
<hr>
+
=== RELATED WORK BY OTHERS ===
 +
;(A) [[EPDM Roof Systems Standard#PART_2|<big>Acceptable Deck</big>]]
 +
:Illustrated deck is representative.  See Sub-section 2.1.5. for acceptable ''deck'' types and conditions.
 +
;(B) [[EPDM Roof Systems Standard#PART_2|<big>Wall Structure</big>]]
 +
:Illustrated wall is representative.  Wall control layers (i.e. water resistive barrier) must overlap ''roofing system'' to achieve ''continuity''.  See Sub-section 2.1.7. for wall conditions.
  
=== RELATED WORK BY OTHERS ===
 
;(A) [[RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies#SBSDECKS|'''Acceptable Supporting Deck Structure''']]
 
;(B) <b>Wood Blocking</b>
 
;(C) <b>Wood Fascia</b>
 
 
</div><!-- COL-6-MD -->
 
</div><!-- COL-6-MD -->
 
</div><!-- PANEL BODY -->
 
</div><!-- PANEL BODY -->
 
</div><!-- PANEL -->
 
</div><!-- PANEL -->
  
'''NOTE''': Refer to '''''RoofStar Guarantee Standards''''' for additional requirements.
+
'''NOTE''': See the [[EPDM Roof Systems Standard | '''EPDM Roof Systems Standard''']] for additional requirements.
 
 
  
 
<hr>
 
<hr>
  
 +
[[EPDM Roof System Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''EPDM Roof System Details'']]
  
[[RoofStar Guarantee Standards for SBS Modified Bitumen Membrane Systems |<i class="fa fa-chevron-circle-left fa" ></i> Back to ''RoofStar Guarantee Standards for SBS Modified Bitumen Membrane Systems'']]
+
[[Main Page | <i class="fa fa-home fa"></i> Home]]
 
 
[[SBS Modified Bitumen Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''SBS Modified Bitumen Construction Details'']]
 
  
[[Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''Construction Details'']]
+
{{Template:RPM Page Footer with Copyright and Current Date}}

Latest revision as of 15:47, 16 February 2024



Division D - Construction Details


EPDM | Membrane Termination F (Wall) ( Article 10.3.2.3.)

Notice to Reader
Images used in a Construction Detail are representative and not prescriptive, and are not necessarily drawn to scale. They are intended to support the related Standard (Ref. Division A, Article 2.2.1.2.).

The reader may link to the related Article in the detail title, or link to the Standard as it relates to a specific element in the detail. All hyperlinks are displayed blue text.

EPDM Details


10.3.2.3.-EPDM-F.png

Drawing NTS

1 WORK INCLUDED

(1) Air/Vapour Control Layers
As specified by the Design Authority and installed to provide continuity for optimal control.
(2) Insulation
Installed in keeping with Section 7.3. Multiple layering illustrated; layers must be offset and staggered at least 304.8 mm (12”) in each direction.
(3) Insulation Overlay Panel
Required for fully adhered membrane systems or when overburden is specified. Panels must be offset and staggered from underlying insulation panels.
(4) Field Membrane
See Table 9.2. for permissible application methods and corresponding membrane properties. Membrane must be installed according to the requirements in Section 9.3.
(5) Edge Securement
Proprietary to the membrane manufacturer. Edge securement is required, irrespective of how the membrane is applied (i.e., adhered, self-adhered, mechanically fastened).
(6) Mechanical Fastening
Edge securement must be anchored to the roof structure to prevent membrane movement.
(7) Primer or Adhesive
Proprietary to the membrane manufacturer. Primer may be required for self-adhered membranes; adhesive is required for all other applications. All membranes applied to the vertical substrate must be fully adhered.
(8) Membrane Flashing
May be run continuously up the vertical substrate from the field or installed as separate flashing (see membrane manufacturer requirements). Membrane shall be carried up the vertical substrate at least 203.2 mm (8”) above the finished roof system surface, plus at least 76.2 mm (3”) for wall control layer overlap. In regions where heavy snow accumulation is possible, or to accommodate future roof membrane replacement, membrane should be carried at least 304.8 mm (12”) up the vertical substrate.
(9) Primary Surface Reglet Counter-flashing and Sealant
Surface reglet counter-flashing with tooled sealant shown at top edge of flashing. In this illustration, the linear metal flashing serves to secure the membrane. All membranes applied to a vertical surface must be mechanically fastened.
(10) Secondary Surface Reglet Counter-flashing and Sealant
Surface reglet counter-flashing with bead of sealant applied in reglet cut. This flashing provides secondary protection for the primary surface reglet/counter-flashing and safe-guards the sealant from weather-induced deterioration and mechanical damage.

2 RELATED WORK BY OTHERS

(A) Acceptable Deck
Illustrated deck is representative. See Sub-section 2.1.5. for acceptable deck types and conditions.
(B) Wall Structure
Illustrated wall is representative. Wall control layers (i.e. water resistive barrier) must overlap roofing system to achieve continuity. See Sub-section 2.1.7. for wall conditions.

NOTE: See the EPDM Roof Systems Standard for additional requirements.


Back to EPDM Roof System Details

Home

© RCABC 2024
RoofStarTM is a registered Trademark of the RCABC.
No reproduction of this material, in whole or in part, is lawful without the expressed permission of the RCABC Guarantee Corp.