|
|
Line 1: |
Line 1: |
− | {| class="wikitable" | style="color: black; background-color: orange; width: 100%;text-align:center"
| |
− | | colspan="2" | <big>'''''Notice to Reader'''''</big>
| |
− | |-
| |
− | | style="color: black; background-color: #ffffcc; width: 100%;text-align:center" | Images used in a Construction Detail are representative and <u>not intended in their representation of an assembly to be prescriptive</u>. Nor are they necessarily drawn to scale. Rather, they are provided to visually convey the Standards, Guiding Principles and Recommendations of the '''RoofStar Guarantee Standards''' for a Waterproofing or Water-shedding System. Actual design with respect to dimensions, the selection of materials and their application remains the responsibility of the ''Design Authority''.<br><br>The full text of applicable '''''RoofStar Guarantee Standards''''' may be read by using the <span style="color:#6495ed">'''blue hyperlinks'''</span>
| |
− | |}
| |
− | <div class="panel panel-success">
| |
− | <div class="panel-heading"><big>'''ASM Details'''</big></div>
| |
− | <div class="panel-body">
| |
− | <div class="col-md-6">
| |
− | <div style="text-align:center; vertical-align:center">
| |
− | [[File:ASM 11.2.1 Curb, Split Panel.jpg|class=img-responsive | link=http://rpm.rcabc.org/images/4/40/ASM_11.2.1_Curb%2C_Split_Panel.jpg]]
| |
− | </div>
| |
| | | |
− | ::Click below for a printable version of this page (N/A)
| |
− |
| |
− | <div style="width:150px; text-align: left;">
| |
− | :[[File:Pdf.png|100 px|link=http://rpm.rcabc.org/images/5/52/D1.7.6-3_Print_Sheet.pdf|'''Print Sheet''']]
| |
− | </div>
| |
− |
| |
− |
| |
− | </div><!-- COL-MD-6 -->
| |
− |
| |
− | <div class="col-md-6">
| |
− | === WORK INCLUDED ===
| |
− | ;(1) [[RoofStar Guarantee Standards for Architectural Sheet Metal (ASM) Systems#ASMUNDERLAYMENT|'''Underlayment''']]: The type of underlay required is determined by roof slope.
| |
− | ;(2) [[RoofStar Guarantee Standards for ASM Roof Assemblies#ASMINSULALIGNMENT|'''Insulation''']]: Offset and stagger layers 300 mm (12").
| |
− | ;(3) [[RoofStar Guarantee Standards for ASM Roof Assemblies#ASMSEP-VENT|'''Separation layer''']]: Vapour-permeable layer over insulation, required on all insulated Architectural Sheet Metal Roof Systems. The material must be located between the insulation and metal panels (see [http://rpm.rcabc.org/index.php?title=RoofStar_Guarantee_Standards_for_Architectural_Sheet_Metal_(ASM)_Systems#Design_5 '''8.1.2 Design''']).
| |
− | ;(4) [[RoofStar Guarantee Standards for Architectural Sheet Metal (ASM) Systems#ASMSLIP|'''Ventilation layer''']]: Recommended over asphaltic underlays and / or as required in this Standard (see [http://rpm.rcabc.org/index.php?title=RoofStar_Guarantee_Standards_for_Architectural_Sheet_Metal_(ASM)_Systems#Design_5 '''8.1.2 Design''']).
| |
− | ;(5) [[RoofStar Guarantee Standards for Architectural Sheet Metal (ASM) Systems#ASMINSULLAYERING|'''Bearing plate''']]: Only thermally non-conductive clips or bars passing through the insulation assembly, or mechanically fastened bearing plates, may be used to secure and support insulation panels, or provide support for panel clips.
| |
− | ;(6) [[RoofStar Guarantee Standards for Architectural Sheet Metal (ASM) Systems#ASMCLIP |'''Architectural metal panel clip''']]
| |
− | ;(7) [[RoofStar Guarantee Standards for Architectural Sheet Metal (ASM) Systems#ASMPANEL |'''Architectural metal roof panel (lower)''']]: Lower, installed prior to the pipe flashing, cut hole large enough to allow for movement. Extend 400 mm (16") upslope beyond the pipe.
| |
− | ;(8) '''Spaced Cleat''': Cleats, set in accepted caulking, spaced 50 mm (2") and fastened with compatible non-corrosive flat head screws.
| |
− | ;(9) [[RoofStar Guarantee Standards for Architectural Sheet Metal (ASM) Systems#ASMSEALANT |'''Sealant''']]
| |
− | ;(10) Split panel
| |
− | ;(11) '''Backpan Flashing''': Required for curbs up to 900 mm (36") wide.
| |
− | ;(12) '''Metal Curb Flashing'''
| |
− | ;(13) [[RoofStar Guarantee Standards for Architectural Sheet Metal (ASM) Systems#ASMCOUNTER |'''Metal Counter Flashing''']]
| |
− | ;(14) '''Architectural metal roof panel (upper)''': Installed after penetration flashing. Cut hole for pipe penetration and turn lower panel end under to hook onto cleat.
| |
− |
| |
− | <hr>
| |
− |
| |
− | === RELATED WORK BY OTHERS ===
| |
− | ;(A) [[RoofStar Guarantee Standards for Architectural Sheet Metal (ASM) Systems#ASMDECK|'''Acceptable deck''']]
| |
− | </div><!-- COL-6-MD -->
| |
− | </div><!-- PANEL BODY -->
| |
− | </div><!-- PANEL -->
| |
− |
| |
− | '''NOTE''': Refer to '''''RoofStar Guarantee Standards''''' for additional requirements.
| |
− |
| |
− | <hr>
| |
− |
| |
− | [[RoofStar Guarantee Standards for Architectural Sheet Metal (ASM) Systems|<i class="fa fa-chevron-circle-right fa" ></i> RoofStar Guarantee Standards for Architectural Sheet Metal (ASM) Systems]]
| |
− |
| |
− | [[Architectural Sheet Metal Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''ASM Construction Details'']]
| |