Difference between revisions of "Draft CD 14"

Jump to: navigation, search

Difference between revisions of "Draft CD 14"

(Blanked the page)
(Tag: Blanking)
Line 1: Line 1:
{| class="wikitable" | style="color: black; background-color: orange; width: 100%;text-align:center"
 
| colspan="2"  | <big>'''''Notice to Reader'''''</big>
 
|-
 
| style="color: black; background-color: #ffffcc; width: 100%;text-align:center" | Images used in a Construction Detail are representative and <u>not intended in their representation of an assembly to be prescriptive</u>.  Nor are they necessarily drawn to scale. Rather, they are provided to visually convey the Standards, Guiding Principles and Recommendations of the '''RoofStar Guarantee Standards''' for a Waterproofing or Water-shedding System. Actual design with respect to dimensions, the selection of materials and their application remains the responsibility of the ''Design Authority''.<br><br>The full text of applicable '''''RoofStar Guarantee Standards''''' may be read by using the <span style="color:#6495ed">'''blue hyperlinks'''</span>
 
|}
 
<div class="panel panel-success">
 
<div class="panel-heading"><big>'''ASM Details'''</big></div>
 
<div class="panel-body">
 
<div class="col-md-6">
 
<div style="text-align:center; vertical-align:center">
 
[[File:ASM 11.2.1 Curb, Split Panel.jpg|class=img-responsive | link=http://rpm.rcabc.org/images/4/40/ASM_11.2.1_Curb%2C_Split_Panel.jpg]]
 
</div>
 
  
::Click below for a printable version of this page (N/A)
 
 
<div style="width:150px; text-align: left;">
 
:[[File:Pdf.png|100 px|link=http://rpm.rcabc.org/images/5/52/D1.7.6-3_Print_Sheet.pdf|'''Print Sheet''']]
 
</div>
 
 
 
</div><!-- COL-MD-6 -->
 
 
<div class="col-md-6">
 
=== WORK INCLUDED ===
 
;(1) [[RoofStar Guarantee Standards for Architectural Sheet Metal (ASM) Systems#ASMUNDERLAYMENT|'''Underlayment''']]: The type of underlay required is determined by roof slope.
 
;(2) [[RoofStar Guarantee Standards for ASM Roof Assemblies#ASMINSULALIGNMENT|'''Insulation''']]: Offset and stagger layers 300 mm (12").
 
;(3) [[RoofStar Guarantee Standards for ASM Roof Assemblies#ASMSEP-VENT|'''Separation layer''']]: Vapour-permeable layer over insulation, required on all insulated Architectural Sheet Metal Roof Systems.  The material must be located between the insulation and metal panels (see [http://rpm.rcabc.org/index.php?title=RoofStar_Guarantee_Standards_for_Architectural_Sheet_Metal_(ASM)_Systems#Design_5 '''8.1.2 Design''']).
 
;(4) [[RoofStar Guarantee Standards for Architectural Sheet Metal (ASM) Systems#ASMSLIP|'''Ventilation layer''']]: Recommended over asphaltic underlays and / or as required in this Standard (see [http://rpm.rcabc.org/index.php?title=RoofStar_Guarantee_Standards_for_Architectural_Sheet_Metal_(ASM)_Systems#Design_5 '''8.1.2 Design''']).
 
;(5) [[RoofStar Guarantee Standards for Architectural Sheet Metal (ASM) Systems#ASMINSULLAYERING|'''Bearing plate''']]: Only thermally non-conductive clips or bars passing through the insulation assembly, or mechanically fastened bearing plates, may be used to secure and support insulation panels, or provide support for panel clips.
 
;(6) [[RoofStar Guarantee Standards for Architectural Sheet Metal (ASM) Systems#ASMCLIP |'''Architectural metal panel clip''']]
 
;(7) [[RoofStar Guarantee Standards for Architectural Sheet Metal (ASM) Systems#ASMPANEL |'''Architectural metal roof panel (lower)''']]: Lower, installed prior to the pipe flashing, cut hole large enough to allow for movement. Extend 400 mm (16") upslope beyond the pipe.
 
;(8) '''Spaced Cleat''': Cleats, set in accepted caulking, spaced 50 mm (2") and fastened with compatible non-corrosive flat head screws.
 
;(9) [[RoofStar Guarantee Standards for Architectural Sheet Metal (ASM) Systems#ASMSEALANT |'''Sealant''']]
 
;(10) Split panel
 
;(11) '''Backpan Flashing''': Required for curbs up to 900 mm (36") wide.
 
;(12) '''Metal Curb Flashing'''
 
;(13) [[RoofStar Guarantee Standards for Architectural Sheet Metal (ASM) Systems#ASMCOUNTER |'''Metal Counter Flashing''']]
 
;(14) '''Architectural metal roof panel (upper)''': Installed after penetration flashing.  Cut hole for pipe penetration and turn lower panel end under to hook onto cleat.
 
 
<hr>
 
 
=== RELATED WORK BY OTHERS ===
 
;(A) [[RoofStar Guarantee Standards for Architectural Sheet Metal (ASM) Systems#ASMDECK|'''Acceptable deck''']]
 
</div><!-- COL-6-MD -->
 
</div><!-- PANEL BODY -->
 
</div><!-- PANEL -->
 
 
'''NOTE''': Refer to '''''RoofStar Guarantee Standards''''' for additional requirements.
 
 
<hr>
 
 
[[RoofStar Guarantee Standards for Architectural Sheet Metal (ASM) Systems|<i class="fa fa-chevron-circle-right fa" ></i> RoofStar Guarantee Standards for Architectural Sheet Metal (ASM) Systems]]
 
 
[[Architectural Sheet Metal Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''ASM Construction Details'']]
 

Revision as of 22:08, 23 February 2024