Difference between revisions of "TPO Roof System Details"
Difference between revisions of "TPO Roof System Details"
(→Part 10 - Perimeters and Walls) |
|||
(40 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
− | + | {{Template:RPM Info}} | |
− | + | __NONUMBEREDHEADINGS__ | |
+ | {{DISPLAYTITLE:<span style="position: absolute; clip: rect(1px 1px 1px 1px); clip: rect(1px, 1px, 1px, 1px);">{{FULLPAGENAME}}</span>}} | ||
+ | __NOTOC__ | ||
− | < | + | :<big><big>Division D - Construction Details</big></big> |
− | : | + | :<hr> |
− | : | + | :<big><big><big><big><big>Construction Details for TPO Membrane Roof Systems</big></big></big></big></big> |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | : | + | <div class="col-md-2"> |
+ | :[[File:TPO project (courtesy Carlisle Syntec).jpg| link=http://rpm.rcabc.org/images/5/58/TPO_project_%28courtesy_Carlisle_Syntec%29.jpg | 175 px]] | ||
+ | </div> | ||
− | + | <div class="col-md-10"> | |
− | : | + | :The drawings linked on this page are intended to represent a variety of TPO Membrane roof system applications while remaining generic with regards to manufacturers’ specific application specifications. They do not represent all possible ''manufacturer'' application roof system designs. Consult each ''manufacturer's'' specifications and the '''''RoofStar Guarantee Standards''''' to develop a system acceptable to both the manufacturer and the '''''RoofStar Guarantee Program'''''. |
− | + | ||
− | + | :For further information about TPO Membrane System designs and requirements, see the '''[https://rpm.rcabc.org/index.php?title=TPO_Roof_Systems_Standard Standard for TPO Membrane Roof Systems]'''. | |
− | : | ||
− | |||
− | |||
− | |||
</div> | </div> | ||
− | <div class="col-md- | + | |
− | + | <div class="col-md-12"> | |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
</div> | </div> | ||
+ | <div class="col-md-4"> | ||
+ | <hr> | ||
+ | ===Part 1 - General=== | ||
+ | ====='''Permitted Roof Systems''' ([[TPO_Roof_Systems_Standard#1.1.3.1._Permitted_Roof_Systems | Article 1.1.3.1.]])===== | ||
+ | <ol> | ||
+ | <li>[[TPO Conventionally Insulated System (Typical)| Conventionally Insulated System (Typical)]] | ||
+ | <li>[[TPO Conventionally Insulated System (Alternate) | Conventionally Insulated System (Alternate)]] | ||
+ | <li>[[TPO Protected Roof Assembly (Typical) | Protected Roof Assembly (Typical)]] | ||
+ | </li></ol> | ||
+ | ===Part 6 - Air and Vapour Controls=== | ||
+ | ====='''Continuity and Support''' ([[TPO_Roof_Systems_Standard#6.3.2.1._Continuity_and_Support | Article 6.3.2.1.]])===== | ||
+ | <ol> | ||
+ | <li>[[TPO Air and Vapour Controls (Field) | {{hilite | Air and Vapour Controls (Field)|| 2021-February-7 }}]] | ||
+ | </li></ol> | ||
+ | |||
+ | </div> | ||
+ | <div class="col-md-4"> | ||
<hr> | <hr> | ||
+ | ===Part 10 - Perimeters and Walls=== | ||
+ | ====='''General Application''' ([[TPO_Roof_Systems_Standard#10.3.2.3._General_Application_Requirements_for_Perimeters_and_Walls | Article 10.3.2.3.]])===== | ||
+ | <ol> | ||
+ | <li>[[TPO Membrane Termination A | Membrane Termination A]] | ||
+ | <li>[[TPO Membrane Termination B | Membrane Termination B]] | ||
+ | <li>[[TPO Membrane Termination C | Membrane Termination C]] | ||
+ | <li>[[TPO Membrane Termination D | Membrane Termination D]] | ||
+ | <li>[[TPO Membrane Termination E | Membrane Termination E]] | ||
+ | <li>[[TPO Membrane Termination F | Membrane Termination F]] | ||
+ | </li></ol> | ||
+ | |||
+ | ====='''Low-profile Edges''' ([[TPO_Roof_Systems_Standard#10.3.4.2._Low_Profile_Edges | Article 10.3.4.2.]])===== | ||
+ | <ol> | ||
+ | <li>[[TPO Metal Edge Termination | Metal Edge Termination]] | ||
+ | </li></ol> | ||
+ | ===Part 11 - Drainage=== | ||
+ | </div> | ||
+ | <div class="col-md-4"> | ||
+ | <hr> | ||
− | + | ===Part 12 - Penetrations and Curbs=== | |
− | [[ | + | ===Part 13 - Linear Metal Flashing=== |
+ | :See the separate page, [[Linear_Metal_Flashing_Details | Construction Details for Linear Metal Flashings]]. | ||
+ | |||
+ | ===Part 14 - The Roof as a Platform=== | ||
+ | |||
+ | </div> | ||
+ | |||
+ | <div class="col-md-12"> | ||
+ | <hr> | ||
+ | |||
+ | [[TPO Roof Systems Standard|<i class="fa fa-chevron-circle-left" ></i> ''Standard for TPO Membrane Roof Systems'']] | ||
+ | |||
+ | [[Main Page | <i class="fa fa-home fa"></i> Home]] | ||
+ | {{Template:RPM Page Footer with Copyright and Current Date}} | ||
+ | </div> |
Latest revision as of 16:39, 26 February 2024
- Division D - Construction Details
- Construction Details for TPO Membrane Roof Systems
- The drawings linked on this page are intended to represent a variety of TPO Membrane roof system applications while remaining generic with regards to manufacturers’ specific application specifications. They do not represent all possible manufacturer application roof system designs. Consult each manufacturer's specifications and the RoofStar Guarantee Standards to develop a system acceptable to both the manufacturer and the RoofStar Guarantee Program.
- For further information about TPO Membrane System designs and requirements, see the Standard for TPO Membrane Roof Systems.
Part 1 - General
Permitted Roof Systems ( Article 1.1.3.1.)
- Conventionally Insulated System (Typical)
- Conventionally Insulated System (Alternate)
- Protected Roof Assembly (Typical)
Part 6 - Air and Vapour Controls
Continuity and Support ( Article 6.3.2.1.)
Part 10 - Perimeters and Walls
General Application ( Article 10.3.2.3.)
- Membrane Termination A
- Membrane Termination B
- Membrane Termination C
- Membrane Termination D
- Membrane Termination E
- Membrane Termination F
Low-profile Edges ( Article 10.3.4.2.)
Part 11 - Drainage
Part 12 - Penetrations and Curbs
Part 13 - Linear Metal Flashing
- See the separate page, Construction Details for Linear Metal Flashings.
Part 14 - The Roof as a Platform
Standard for TPO Membrane Roof Systems
© RCABC 2024
RoofStarTM is a registered Trademark of the RCABC.
No reproduction of this material, in whole or in part, is lawful without the expressed permission of the RCABC Guarantee Corp.