|
|
(2 intermediate revisions by the same user not shown) |
Line 1: |
Line 1: |
| | | |
− | {{DISPLAYTITLE:<span style="position: absolute; clip: rect(1px 1px 1px 1px); clip: rect(1px, 1px, 1px, 1px);">{{FULLPAGENAME}}</span>}}
| |
− | __NONUMBEREDHEADINGS__
| |
− | <div class="row">
| |
− |
| |
− | <div class="col-md-3" style="float:right;" id="tocDiv">
| |
− | <div class="noautonum">__TOC__</div>
| |
− | </div> <!-- tocDiv -->
| |
− |
| |
− | <div class="col-md-9" id="mainBodyDiv">
| |
− |
| |
− | <big><big>Division A - Scope, Use of Standards, and Guarantee </big></big>
| |
− | <hr>
| |
− | <big><big><big><big><big>Part 1 - Scope of RPM and Standards</big></big></big></big></big>
| |
− | ===Section 1.1. Roofing Practices Manual and Standards===
| |
− | ====1.1.1. Scope====
| |
− | =====<big>1.1.1.1. Scope of Roofing Practices Manual</big>=====
| |
− | <ol>
| |
− | <li>This ''Manual'' and the Standards were instituted as a guide to support the '''''RoofStar Guarantee Program''''' developed by the RCABC Guarantee Corporation (RGC) ("RGC", "Guarantor"). Consequently, both the ''Manual'' and the Standards are limited in their scope and must not be considered a comprehensive resource for roofing, {{strike| and || 2024-October-21 }} waterproofing at grade, {{hilite | or ''vegetated roofing'' || 2025-October-25 }}. Rather, all Standards must be read in conjunction with the installation requirements published variously by ''manufacturers'', {{hilite | suppliers of ''vegetated roof systems'' || 2025-October-25 }}, or testing authorities.
| |
− | <li>{{hilite | The '''RGC Roofing Practices Manual''' (used interchangeably with "RPM" and ''Manual'') {{strike| and its Standards are || 2024-October-21 }} is || 2025-October-25 }} freely accessible to anyone (the “reader”). {{hilite | However, the ''Manual and its Standards are || 2025-October-25 }} {{strike| but are || 2024-October-21 }} intended solely for the purpose of qualifying a ''project'' for a '''''RoofStar Guarantee'''''. Therefore, subject to the limitations and conditions of the '''''RoofStar Guarantee Program''''', the appropriate use and authority of this ''Manual'' and the Standards is limited by this expressed purpose and scope.
| |
− | <li>Each Standard supports and, in some instances, exceeds the requirements of the [https://free.bcpublications.ca/civix/content/public/bcbc2018/?xsl=/templates/browse.xsl&xsl=/templates/browse.xsl ''British Columbia Building Code''] ("the Code"), but that is secondary to the primary function and scope of a Standard. Therefore, while the requirements, guiding principles and recommendations in a Standard may be regarded as general "best practices", the use of a Standard for any purpose other than to qualify a ''project'' for a '''''RoofStar Guarantee''''' shall be at the sole discretion of the reader, and the ''Guarantor'' shall not be legally liable for the application of a Standard for any other purposes.
| |
− | <li>Any interpretation of the Code offered in a Standard or elsewhere in this ''Manual'' is published solely for the expressed purpose and scope of the ''Manual'' and Standards and shall not be construed as a substitute for the authority of the Code itself. In all cases, the reader is responsible to exercise good judgement, and to read, understand and comply with the Code, as and how it applies to particular circumstances. Where the Code can be shown to exceed the requirements of a Standard, the Code is deemed to be superior.
| |
− | </li></ol>
| |
− |
| |
− | =====<big>1.1.1.2. Scope of Standards</big>=====
| |
− | <ol>
| |
− | <li>Unless expressly stated elsewhere in a Standard, each Standard applies to
| |
− | <ol>
| |
− | <li>new construction{{hilite | , and || 2025-October-25 }}
| |
− | <li>alterations to existing ''projects''.
| |
− | </li></ol>
| |
− | </li></ol>
| |
− |
| |
− | ====1.1.2. Limited Liability====
| |
− | =====<big>1.1.2.1. Liability Limited to RoofStar Guarantee</big>=====
| |
− | <ol>
| |
− | <li>The RGC Roofing Practices Manual is revised at least three times per calendar year, and as such the content of the ''RPM'' may change, superseded by a successive edition.
| |
− | <li>All users of the RPM are responsible to determine that the ''RPM'' and its various parts are current, and to consult with the material manufacturer, or a knowledgeable consultant, to determine each material's suitability within a particular design and its context.
| |
− | <li>The ''Manual'' shall not be relied upon by anyone for the complete design, specification, or installation of a waterproofing system, {{strike| or || 2024-October-21 }} water-shedding system, {{hilite | or ''vegetated roof assembly'' || 2025-October-25 }}, as the ''RPM'' and the Standards do not and cannot contemplate all of the factors that form part of a complete and Code-compliant design.
| |
− | <li>{{hilite | Systems and materials || 2025-October-25 }} {{strike| (manufactured products) || 2024-October-21 }} listed in the ''RPM'' are {{strike| referred to as || 2024-October-21 }} "accepted" by the '''''Guarantor''''' and indicate what is permissible for the purpose of qualifying for a '''''RoofStar Guarantee''''', but their acceptance may not be construed
| |
− | <ol>
| |
− | <li>as a recommendation or endorsement of their efficacy or suitability for the purposes of a design or its context, or
| |
− | <li>as a declaration that a material is superior to other materials.
| |
− | </li></ol>
| |
− | <li>A Standard may require the ''Design Authority'' to submit engineering or test documentation to the '''''Guarantor''''', but this shall not be construed by the ''Design Authority'' or any reader to mean that the '''''Guarantor''''' either reviews or verifies the validity of said submissions. Reviewing and validating any such documentation remains the sole, legal responsibility of the ''Design Authority''.
| |
− | <li>By using this ''Manual'' and any Standard, the reader agrees to the terms and conditions set out in this ''Manual'' and holds the '''''Guarantor''''' harmless from any and all claims arising out the use of the ''Manual'' or a Standard, except those claims for which {{strike| the || 2024-October-21 }} a '''''RoofStar Guarantee''''' is issued.
| |
− | </li></ol>
| |
− |
| |
− | ===Section 1.2. Materials used for Guarantee===
| |
− | ====1.2.1. Material Suitability====
| |
− | =====<big>1.2.1.1. New Material Products</big>=====
| |
− | <ol>
| |
− | <li>All new construction must utilize only newly manufactured materials expressly accepted by the ''Guarantor'' and listed in Division C of this ''Manual''.
| |
− | <li>No ''project'' may incorporate recycled products, unless expressly permitted with a written Variance issued by the ''Guarantor''.
| |
− | <br>
| |
− | See also Article 1.2.1.2 of [[Guarantee | Part 3]] in Division A, for coverage and limitations of a '''''RoofStar Guarantee'''''.
| |
− | </li></ol>
| |
− |
| |
− | <hr>
| |
− |
| |
− | [[Main Page | <i class="fa fa-home fa"></i> Home]]
| |
− | </div><!-- mainBodyDiv -->
| |
− | </div><!-- row -->
| |
− |
| |
− | {{Template:RPM Page Footer with Copyright and Current Date}}
| |