Difference between revisions of "EPDM Curb for Multiple Penetrations"

Jump to: navigation, search

Difference between revisions of "EPDM Curb for Multiple Penetrations"

(Created page with " {{DISPLAYTITLE:<span style="position: absolute; clip: rect(1px 1px 1px 1px); clip: rect(1px, 1px, 1px, 1px);">{{FULLPAGENAME}}</span>}} __NOTOC__ <big><big>Division D - Con...")
(No difference)

Revision as of 15:45, 31 October 2025



Division D - Construction Details


EPDM | Curb for Multiple Penetrations

Notice to Reader
Images used in a Construction Detail are representative and not prescriptive, and are not necessarily drawn to scale. They are intended to support the related Standard (Ref. Division A, Article 2.2.1.2.).

The reader may link to the related Article in the detail title, or link to the Standard as it relates to a specific element in the detail. All hyperlinks are displayed blue text.

EPDM Details


Illustration Unavailable (Filler Image).png

Drawing NTS

1 WORK INCLUDED

This Page is under construction.

2 RELATED WORK BY OTHERS

This Page is under construction

NOTE: See the EPDM Roof Systems Standard for additional requirements.


Back to EPDM Roof System Details

Home

© RCABC 2025
RoofStarTM is a registered Trademark of the RCABC.
No reproduction of this material, in whole or in part, is lawful without the expressed permission of the RCABC Guarantee Corp.