Difference between revisions of "SBS Conventionally Insulated System (typical)"

Jump to: navigation, search

Difference between revisions of "SBS Conventionally Insulated System (typical)"

(WORK INCLUDED)
(WORK INCLUDED)
Line 17: Line 17:
 
:Adhered to overlay board using asphalt, cold adhesive, self-adhered, mechanical attachment or torch applied according to manufacturer’s specification. Torching directly to wood surfaces is not permitted.
 
:Adhered to overlay board using asphalt, cold adhesive, self-adhered, mechanical attachment or torch applied according to manufacturer’s specification. Torching directly to wood surfaces is not permitted.
 
;[[RoofStar Guarantee Standards for SBS Roof Systems#SBS-STRIPPING|'''Base Sheet Flashing''']]:
 
;[[RoofStar Guarantee Standards for SBS Roof Systems#SBS-STRIPPING|'''Base Sheet Flashing''']]:
:Adhered according to manufacturer&#8217;s specifications using cold adhesive, hot asphalt self-adhered or torch applied to cover boards, or mechanically attached membrane. Torching directly to wood surfaces is not permitted. Must be carried over to outside of parapet or minimum 200 mm (8") above finished roof surface. (See <i>RGC </i><i>Guarantee Standards</i> Section 2.1.1, A5.6, and Section 2.1.3, C8.5).
+
:Adhered according to manufacturer&#8217;s specifications using cold adhesive, hot asphalt self-adhered or torch applied to cover boards, or mechanically attached membrane. Torching directly to wood surfaces is not permitted. Must be carried over to outside of parapet or minimum 200 mm (8") above finished roof surface.
 
;[[RoofStar Guarantee Standards for SBS Roof Systems#SBSBASE|'''Cap Sheet''']]:
 
;[[RoofStar Guarantee Standards for SBS Roof Systems#SBSBASE|'''Cap Sheet''']]:
 
:Applied according to manufacturer&#8217;s printed instructions, all options.
 
:Applied according to manufacturer&#8217;s printed instructions, all options.
Line 23: Line 23:
 
:Applied according to manufacturer&#8217;s printed instructions to top of parapet or minimum 200 mm (8") above finished roof surface. All options.
 
:Applied according to manufacturer&#8217;s printed instructions to top of parapet or minimum 200 mm (8") above finished roof surface. All options.
 
;[[RoofStar Guarantee Standards for SBS Roof Systems#METAL-SBS|'''Metal Flashing''']]:
 
;[[RoofStar Guarantee Standards for SBS Roof Systems#METAL-SBS|'''Metal Flashing''']]:
:As required by <i>RGC </i><i>Guarantee Standards</i>. (See <i>RGC Guarantee Standard</i> A6.9 and A6.10)
+
:As required by <i>RGC </i><i>Guarantee Standards</i>.
 
;Primer:  
 
;Primer:  
 
:Prime wood substrate to receive self-adhesive base membrane stripping.
 
:Prime wood substrate to receive self-adhesive base membrane stripping.

Revision as of 21:56, 18 July 2016


D1.7.1 (text).jpg

Download Printable Detail Sheet here


1 WORK INCLUDED

Gypsum Board
Required when insulation is too thin to span flutes of steel decking or when required as a thermal barrier by design authority.
Vapour Retarder
If required by design authority.
Insulation
Mechanically fastened.
Insulation Overlay Board
Asphalt adhered or mechanically fastened. Two layers required over heat-sensitive insulation.
Base Sheet
Adhered to overlay board using asphalt, cold adhesive, self-adhered, mechanical attachment or torch applied according to manufacturer’s specification. Torching directly to wood surfaces is not permitted.
Base Sheet Flashing
Adhered according to manufacturer’s specifications using cold adhesive, hot asphalt self-adhered or torch applied to cover boards, or mechanically attached membrane. Torching directly to wood surfaces is not permitted. Must be carried over to outside of parapet or minimum 200 mm (8") above finished roof surface.
Cap Sheet
Applied according to manufacturer’s printed instructions, all options.
Cap Sheet Flashing
Applied according to manufacturer’s printed instructions to top of parapet or minimum 200 mm (8") above finished roof surface. All options.
Metal Flashing
As required by RGC Guarantee Standards.
Primer
Prime wood substrate to receive self-adhesive base membrane stripping.

2 RELATED WORK BY OTHERS

(A) Acceptable Steel Deck
(B) Plywood Backing
Required on rough surfaces or where adhesive is asphalt. Must be primed.
(C) Wood Blocking
Sloped to roof where parapet is over 100 mm (4") in width. Must be primed.

NOTE: Refer to RGC Guarantee Standards for additional requirements.]





Back to SBS Application

Back to SBS Construction Details

Back to Construction Details