Difference between revisions of "SBS Parapet (Typical)"
Difference between revisions of "SBS Parapet (Typical)"
(→WORK INCLUDED) |
(→WORK INCLUDED) |
||
Line 13: | Line 13: | ||
;[[RoofStar Guarantee Standards for SBS Roof Systems#SBSBASE|'''5. Primary Membrane and Membrane Protection''']]: | ;[[RoofStar Guarantee Standards for SBS Roof Systems#SBSBASE|'''5. Primary Membrane and Membrane Protection''']]: | ||
;[[RoofStar Guarantee Standards for SBS Roof Systems#SBS-STRIPPING|'''6. Membrane Flashing''']]: | ;[[RoofStar Guarantee Standards for SBS Roof Systems#SBS-STRIPPING|'''6. Membrane Flashing''']]: | ||
− | :Mechanically fasten to outside face of parapet blocking (D). At least one ply must extend over outside edge | + | :Mechanically fasten to outside face of parapet blocking (D). At least one ply must extend over outside edge. |
;[[RoofStar Guarantee Standards for SBS Roof Systems#METALBASE-SBS|'''7. Metal Base Flashing''']]: | ;[[RoofStar Guarantee Standards for SBS Roof Systems#METALBASE-SBS|'''7. Metal Base Flashing''']]: | ||
:Optional on flexible membrane systems. Required on assemblies using gravel ballast filter mats. | :Optional on flexible membrane systems. Required on assemblies using gravel ballast filter mats. | ||
;[[RoofStar Guarantee Standards for SBS Roof Systems#METALCAP-SBS|'''8. Metal Cap Flashing''']]: | ;[[RoofStar Guarantee Standards for SBS Roof Systems#METALCAP-SBS|'''8. Metal Cap Flashing''']]: | ||
− | :Flashings 1 and 2 may be one piece. Fasten with continuous concealed clip-type fasteners <b>or</b> cladding screws evenly spaced between seams | + | :Flashings 1 and 2 may be one piece. Fasten with continuous concealed clip-type fasteners <b>or</b> cladding screws evenly spaced between seams. |
=== RELATED WORK BY OTHERS === | === RELATED WORK BY OTHERS === |
Revision as of 22:08, 18 July 2016
1 WORK INCLUDED
- 1. Gypsum Board
- If required by design authority.
- 2. Vapour Retarder
- If required by design authority.
- 3. Insulation
- See list of Accepted Materials.
- 4. Insulation Overlay Board
- As required.
- 5. Primary Membrane and Membrane Protection
- 6. Membrane Flashing
- Mechanically fasten to outside face of parapet blocking (D). At least one ply must extend over outside edge.
- 7. Metal Base Flashing
- Optional on flexible membrane systems. Required on assemblies using gravel ballast filter mats.
- 8. Metal Cap Flashing
- Flashings 1 and 2 may be one piece. Fasten with continuous concealed clip-type fasteners or cladding screws evenly spaced between seams.
2 RELATED WORK BY OTHERS
(A) Acceptable Deck
(B) Air / Vapour Seal
(C) Acceptable Wall Surface
(D) Wood Blocking
(E) Sloped Wood Blocking: Required over 100 mm (4") parapet width. See RGC Guarantee Standard A6.9
NOTE: Refer to RGC Guarantee Standards for additional requirements.]