Difference between revisions of "SBS Conventionally Insulated System (typical)"
Difference between revisions of "SBS Conventionally Insulated System (typical)"
(→WORK INCLUDED) |
(→RELATED WORK BY OTHERS) |
||
Line 29: | Line 29: | ||
=== RELATED WORK BY OTHERS === | === RELATED WORK BY OTHERS === | ||
;(A) [[RoofStar Guarantee Standards for SBS Roof Systems#Low Slope Substrates|'''Acceptable Steel Deck''']]: | ;(A) [[RoofStar Guarantee Standards for SBS Roof Systems#Low Slope Substrates|'''Acceptable Steel Deck''']]: | ||
− | ;(B) Plywood Backing: | + | ;(B) '''Plywood Backing''': |
:Required on rough surfaces or where adhesive is asphalt. Must be primed. | :Required on rough surfaces or where adhesive is asphalt. Must be primed. | ||
− | ;(C) Wood Blocking | + | ;(C) [[RoofStar Guarantee Standards for SBS Roof Systems#SBSWOODBLOCKING|'''Wood Blocking''']] |
:Sloped to roof where parapet is over 100 mm (4") in width. Must be primed. | :Sloped to roof where parapet is over 100 mm (4") in width. Must be primed. | ||
− | NOTE: Refer to <i>RGC Guarantee Standards</i> for additional requirements.] | + | '''NOTE''': Refer to <i>RGC Guarantee Standards</i> for additional requirements.] |
Revision as of 15:08, 19 July 2016
Download Printable Detail Sheet here
1 WORK INCLUDED
- Gypsum Board
- Required when insulation is too thin to span flutes of steel decking or when required as a thermal barrier by design authority.
- Vapour Retarder
- If required by design authority.
- Insulation
- Mechanically fastened.
- Insulation Overlay Board
- Asphalt adhered or mechanically fastened. Two layers required over heat-sensitive insulation.
- Base Sheet
- Adhered to overlay board using asphalt, cold adhesive, self-adhered, mechanical attachment or torch applied according to manufacturer’s specification. Torching directly to wood surfaces is not permitted.
- Base Sheet Flashing
- Adhered according to manufacturer’s specifications using cold adhesive, hot asphalt self-adhered or torch applied to cover boards, or mechanically attached membrane. Torching directly to wood surfaces is not permitted. Must be carried over to outside of parapet or minimum 200 mm (8") above finished roof surface.
- Cap Sheet
- Applied according to manufacturer’s printed instructions, all options.
- Cap Sheet Flashing
- Applied according to manufacturer’s printed instructions to top of parapet or minimum 200 mm (8") above finished roof surface. All options.
- Metal Flashing
- As required by RGC Guarantee Standards.
- Primer
- Prime wood substrate to receive self-adhesive base membrane stripping.
2 RELATED WORK BY OTHERS
- (A) Acceptable Steel Deck
- (B) Plywood Backing
- Required on rough surfaces or where adhesive is asphalt. Must be primed.
- (C) Wood Blocking
- Sloped to roof where parapet is over 100 mm (4") in width. Must be primed.
NOTE: Refer to RGC Guarantee Standards for additional requirements.]