1 WORK INCLUDED

(1) Valley Protection Membrane: Accepted self-adhered modified bituminous eave protection membrane.

(2) Underlayment: The type of underlay required is determined by roof slope (see Section 8.1.4.1 and Section 8.1.4.2).

(3) Slip Sheet: Recommended over asphaltic underlays and / or as required by metal roof panel manufacturer.

(4) Valley Metal Panel: Preformed with centre rib.

(5) Metal Clip: Installed to metal roof panel manufacturer’s printed instructions.

(6) Pre-Formed Closures: Two rows set in accepted caulking.

(7) Architectural Metal Roof Panel

(8) Valley Panel Overlap: Overlaps minimum 200 mm (8") sealed with two rows of accepted caulking and drag load fasteners.


2 RELATED WORK BY OTHERS

(A) Acceptable Deck


NOTE: Refer to RGC Guarantee Standards for additional requirements.